CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID#915749 PREPARED FOR Dr. ABDULAZIZ BUBSHAIT.

Slides:



Advertisements
Similar presentations
Unauthorized Commitments
Advertisements

Construction Contracting
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
ABC Change Orders College of Environmental Design
ISTISNA’.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Procurement Management
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
CARLIN LAW GROUP, APC Dispute Resolution Procedures Contract Claims Requirements Public Contract Code § (schools) Public Contract Code §20104 Government.
Chapter18 Contract Construction 1CE 417, King Saud University.
4/13/2017 1:54 PM.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Project Close Out CTC-470.
Conditions of the Contract for Construction
COMMERCIAL “SOLE SOURCE” PROPOSAL ANALYSIS ROADMAP 1. Is information available within the Government? Step 1 – Information within the Government If Yes.
XII- COST CONTROL, MONITORING & ACCOUNTING
Construction Engineering 221 Contracts & Contractor Procurement.
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
Valuations and interim certificates. Purpose Value the works taking account of: – the physical work done on site; – any extra work ordered by the client;
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
Construction Contracts and Project Delivery Methods
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
CONSTRUCTION CONTRACTS – MASTER CHART
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
King Fahd University of Petroleum & Minerals
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION THIRD PARTY DAMAGES Rudy Powell, P.E., State Construction Engineer 2014 FTBA.
CONSTRUCTION CONTRACTS DOCUEMENTS
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Chapter 15 Payments. Payments typically made monthly. Retainage typically withheld (5% - 10%) Project payment: –series of periodic payments –single final.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Service Quality Innovation Trust Safety The Samet Way “Managing the Company Cash Position” Accounts Payable (AP) should always be less than Accounts Receivable.
CON 2001 CVE 4070 Construction Methods/Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
LECTURE 5 FORMULATION & PRESENTATION OF OTHER CLAIMS
Office of Procurement Services.  Vendor Application Website: 
Measurement and Payment
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION CHANGE DIRECTIVES UNDER THE NEW PUBLIC BID LAWS Speaker: STEVEN B. LOEB, Esq. BREAZEALE SACHSE & WILSON, LLP Tel: (225)
CONTRACT ADMINISTRATION
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Cost or pricing data John Cancellara 7 March 2018.
Certificates JCT 11 SBC allows for 10 different kinds of certificates.
ARCH 435 PROJECT MANAGEMENT
Unique General Conditions of the Alabama Building Commission (ABC)
Practical Aspects and Running of the Project
CEM 515 Done by: Abdulkarim Sulais
Directed Change Constructive Change
Presentation transcript:

CHANGE ORDER & BACKCHARGES PREPARED BY ABDULAZIZ M. AL-BESHR ID# PREPARED FOR Dr. ABDULAZIZ BUBSHAIT

AGENDA CHANGE ORDER TYPES OF CONTRACTUAL CHANGES CAUSES OF CHANGES CHANGED WORK PROCESS l REPRESENTATIVE CASES l BACKCHARGES l COST COLLECTION l EXAMPLE OF BACKCHARGE SITUATION l SUGGESTED BACKCHARGE PROCEDURE l REPRESENTATIVE CASES

Change Order This chapter describes the typical causes of contractual changes and present a process for controlling and accommodating changes within the frame work of owner-contractor agreements

Types Of Contractual Changes l Design Changes l Schedule Changes l Price and Cost Changes l Resequencing of Design & Construction Activities l Material Substitution l Modification to Construction Methods

Categories of Contract Changes Informal Changes (Constructive Changes): modification to the contract’s scope of work or method of performance that result from acts or omissions of the owner, God, or a third party. Formal Changes: Changes made by the owner and result in written directives to the contract to change the scope of work, time of performance, etc… once the contract is awarded.

Typical causes of change l Defective or Incomplete Design Information. l Late or Defective Owner Furnished Materials and Equipment. l Changes in Requirements. l Changed or Unknown site Condition

Continue... Restriction In Work Method l Delay or Acceleration. l Impact of Collateral Work by Others. l Ambiguous Contract Language and Contract Interoperation. l Late or Inadequate Contractual Compliance on Part the Owner.

The Changed Work Process Identification : Owner should notifies contractor of a planned or potential changes.(Exhibit 13) Evaluation: The owner must decide whether to adopt the change or not. If discovered after the fact, it should be estimated. (Exhibit 14.) Approval: When both parties agreed to the change, a change order approval form is issued (Exhibit 15.)

Continue... Incorporation: Once a change order is approved by the owner, it is issued to the contractor to modify the terms of the original agreements.(Change order form exhibit 16). Payment: Change work should be identified and listed separately on progress estimates and invoices.

Exception to Changed Work Process In case of emergencies or any unusual condition, we can’t use the formal process. Instead, the contractor will be instructed to do the necessary work (some times verbally).

A unit-price contract for furnishing and installing structural and miscellaneous steel contained an extensive price list for virtually every category of item that could be needed for a coal-fired power plant project. Of the several hundred priced items, one was for furnishing and installing “metal building frames and louvers” contemplated for the turbine building air exhaust system at a price of $40 per pound of steel. After 18 months of work, the design was changed to require the addition of eight “exhaust vents with adjustable vanes.” A change order was issued upon a lump-sump quotation from the contract of $88,000. While reviewing the change order files, an independent auditor later pointed out that the additional “exhaust vents with adjustable vents” were identical to the “metal building frames and louvers” for which unit prices existed in the contract. Since each vent weighed approximately 200 pounds, the use of the existing unit prices would have cost the owner 8 x 200 x $40, or $64,000, rather than the $88,000 authorized by change order. REPRESENTATIVE CASE

Backcharges When a contractor or supplier is unable or unwilling to do the work, the owner will be forced to do it or ask some one to do it for him. In this case, the cost of this operation should be backcharged.

Cost Collection The cost to the owner for having some to do the work should equal the deduction from payments. The owner can collect the backcharge amount by either: 1-Owner pay for the work and later invoice the contractor 2-Deduct the backcharge amount from the payment due to the contractor.

Example of Backcharge Situation An employee of contract E, suffering from an extreme hangover, mistakenly drives a bulldozer over a carton of sensitive and fragile electrical instruments waiting to be installed by an electrical contractor, F. Contractor F asserts that it has no contract or legal relationship with contractor E and demands a change order from the owner covering the replacement cost of the damage items. Contract E agrees to be backcharged for the amount in question.

Suggested Backcharge Process Notification of the Contract Manger Determining the scope of work that to be done Requesting an estimate from the party who will perform the backcharge work Cost estimate may be submitted on the basis of a lump-sum or unit prices, including estimated quantities.

REPRESENTATIVE CASE A painting subcontractor requested extra compensation from the project’s general contractor for applying prime cost to structural steel that was supposed to be factory primed. The general contractor requested that the owner’s contract manager issue a backcharge to the steel supplier for the painting contract’s increased expense. While filling out the the backcharge form, the contract manager suddenly realized that the steel in question had not been purchased by the owner, but was bought by the general contractor under a recent change order to furnish and erect leave-out steel. Since the steel vendor was selected by the general contractor, the owner has no reason to invoke a backcharge. The general contractor was told to handle it’s own problem without involving the owner.