Estimating PS&E – Plans, specifications and estimate 1.

Slides:



Advertisements
Similar presentations
Construction Engineering 221
Advertisements

Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Construction Engineering 221 Cost Estimating and Bidding II.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
1 1 Dr. Mark Stewart, Camden County Schools Steve Adams, Johnson-Laux Construction Jon Held, Georgia ezIQC SWC Project Manager Willie Moon, DOAS Contract.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Melissa Hollis Basis of Estimates Coordinator Engineering Systems Support Section State Specifications and Estimates Office October
Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008.
Objectives In the 1 st half of this Module we’re going to cover: The computerized estimating process. How a Contractor comes up with his Material Costs.
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
Home Letter How to charge Design fees Ajay Vaibhav Writing Letters Estimating Fee Invoicing Fees.
Earthwork Training Introduction Good Morning I am ____
Estimating CTC-415. Estimate Types Concept Detailed Definitive.
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
Construction Engineering 221 Cost Estimating and Bidding.
EM15 – Contractors COST MANAGEMENT
2011 Raze & Removal Pilot The WisDOT Northeast Region embarked on a new raze and removal process on a project in Sheboygan & Fond du Lac. It’s purpose.
Programming/BudgetEngineering.. Current WisDOT Policy and Guidelines : mega/mg-budget-est-mgmt.pdf
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Ms. Gripshover Landscaping Unit 12. Identify the difference between an estimate and a bid. Describe landscape specifications. Prepare a cost estimate.
1 Construction Estimating PART 1 "ACCURACY" - First and foremost, your ability to achieve success at a targeted,
Construction Engineering Management Project Costing
Classification of PP&E
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
Chapter 8 Pricing Generally. Objectives Upon completion of this chapter, you will be able to: –Describe the general process of pricing a construction.
 Purpose: To present DOT an overview of the costs that we incur as grading contractors.  Goal: To foster a basic understanding of these costs and relate.
Construction Contracts and Project Delivery Methods
Estimator Tips and Future Plans John Riedl P.E. Lucien Darensburg 2008.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
Horticulture CD-Rom Illinois CORE Curriculum. Unit C Nursery, Landscaping, and Gardening.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
Estimates and Quotes Apply procedures to develop plans, estimates and quotes Objective 4.03 Remember key terms, abilities needed, and items included in.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
It’s not just a SWAG* * Scientific Wild Ass Guess Developing the Project Estimate.
Practicum in Fashion Design
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
Chapter 13 Estimates for Remodeling Work
CVE 4070 Construction Engineering Construction Estimating Prof. Ralph V. Locurcio, PE.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Introducing The Cost Approach
CON 2001/CVE 4070 Construction Engineering Construction Estimating
Measurement and Payment
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
COST PLUS. Reasons for Cost-Plus Can’t agree on a price Specialty work Notice of Changed Conditions.
 To provide a realistic accurate idea of the cost  Provide information about building or not.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
Auctions and Competitive Bidding
Estimating Project Costs
Costing and Project Evaluation
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
(Additional materials)
An-Najah National University
PS&E – Plans, specifications and estimate
The Cost Approach.
New Specifications for 2017
CIVL 493 CONSTRUCTION MANAGEMENT
Estimating – Overhead, Profit, Margins, & Markups workshop
House Construction Budget Plan
Work Orders I will be reviewing Work Orders and addressing some problematic issues.
Operational Assets: Acquisition and Disposition
Presentation transcript:

Estimating PS&E – Plans, specifications and estimate 1

Types of Estimates Ball-Park (Planning phase) Preliminary (Design Report/EIS) Detailed (PS&E---Detailed Design) 2

Estimate Quality Good book-keeping Accurate backup of quantities Familiarity w/ project Experience 3

4

Estimating Procedure List all item numbers-plans and similar plans Estimate quantities and prepare a backup for each item # Assign prices to each item (WAIPR) Lump sum price analysis Summary of quantities Add contingency Summarize final costs 5

Item Numbers Referenced to spec book Examples: ◦ Clearing and Grubbing ◦ 203.xxxx Grade and Reshape Ditches ◦ 304.xx Subbase ◦ Establish Turf ◦ Survey and Stakeout *Special specifications—General or Special (must be approved) 6

Units Unit abbreviationsDefinition LSLump Sum EAEach CYCubic Yard SYSquare Yard LFLinear Feet TNTon MOMonth 7

Units-Metric Unit abbreviationsDefinition CMCubic Meters SQMSquare meters MTMetric Ton KGKilograms MMeters 8

Specifications center/engineering/specifications center/engineering/specifications 9

Pay Item Catalog 10

Weighted Average Item Price Report (WAIPR) 11

Special Spec Repository 12

Contingency Added to estimate to account for unknowns Usually a percentage of final cost 13

Cost Estimate Example Item #DescriptionUnitQTYPriceSubtotal Clear & GrubLS1.0$12, Earth Cut & EmbCY14,545.0$12.00$174, Bale DikesLF42.0$7.50$ Asph Base CourseTN6392.0$38.00$242, ” RCP End SecEA4.0$700.00$2, OfficeMO6$1,000.00$6, Traffic SignEA8$170.00$1,

Backup for Estimate Example ITEM (White Paint Reflective Paint Stripes) 2 Shoulder Stripes Sta to Sta *448’ = 896’ Say 900’ 15

Asphalt – English Tons Tons per Cubic Foot (Base) Tons per Cubic Foot (Binder) Tons per Cubic Foot (Top-6F) Old Marshall Design New Superpave????? 16

Lump Sum Price Analysis Estimate for items paid as a “Lump Sum” Includes: ◦ Labor ◦ Materials ◦ Equipment ◦ Rental costs ◦ Profit and Overhead Typical lump sum items: ◦ Clearing and Grubbing ◦ Survey and Stakeout ◦ Temporary Traffic Signals 17

Lump Sum Analysis Example Item (Temporary Traffic Signal) Labor Costs ◦ Backhoe Operator-$30.05/hr ◦ Electrician-$32.99/hr ◦ Laborer-$22.95/hr Prevailing Wages Installation and Removal of Temp. Poles ◦ 1 Backhoe Operator $30.05/hr * 16 hours = ◦ 2 $22.95/hr * 16 hours = Installation and Removal of Temp. Signal Heads ◦ 1 $32.99/hr * 16 hours = ◦ 2 $22.95/hr * 16 hours = Installation and Removal of Controller ◦ 1 $32.99 * 16 hours = ◦ 1 $22.95 * 16 hours = 18

Lump Sum Analysis Example-Cont. Item (Temporary Traffic Signal) Materials ◦ Temporary Poles $1, each ◦ Temporary Signal Heads $ each ◦ Controller, Fixed Time $1, ◦ Misc. Hardwire and Wire $1, Equipment (Installation and Removal) ◦ 1 Bucket $18.00/hr * 24 hours ◦ 1 $35.00/hr * 24 hours Profit and Overhead (20%) 19

Estimate Shares Highway Bridge Utilities Different Counties 20

Engineer’s Estimate Quantities included in plans Engineer’s estimate not given to contractor Prices not available to contractor—each contractor provides their own bid Lowest bidder gets the contract 21

22

23