1 LHC-DFBX Shipping Specification Steve Virostek LBNL Presented at the DFBX RFP Review 23-24 October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Vacuum Vessel Production Readiness Review
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Pipe Supports and Restraints
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE RF and Coupling Coil Module Integration Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
RF Cavity / Coupling Coil Module
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Cryostat Production Readiness Review January 23, 2002 T. Nicol – Fermilab
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
December 3-4, 2007Earthquake Readiness Workshop Seismic Design Considerations Mike Sheehan.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Lecture 5 January 31,  Sudhir K. Jain, IIT Kanpur E-Course on Seismic Design of Tanks/ January 2006 Lecture 5/ Slide 2 In this Lecture Impulsive.
TIS Review 13 Dec Bill Elliott IR ABSORBER STATUS1 Bill Elliott LBNL Presented at the TIS SAFETY REVIEW 13 Dec Berkeley,CA brookhaven - fermilab.
DFBX Thermo-Mechanical Review
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
Structures and Mechanisms Subsystems AERSP 401A. Introduction to Structural Estimation Primary Structure: load-bearing structure of the spacecraft Secondary.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
1 LHC-DFBX DFBX Production Readiness Review Project Overview Joseph Rasson LBNL October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC ACCELERATOR.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
1 MME3360b Assignment 04 10% of final mark 6 problems, each worth 16.7% of assignment mark Due April 9 th, 2012.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
January 25, 2005GRETINA 2004 Review1 GRETINA 2004 Annual Review Steve Virostek Lawrence Berkeley National Lab Mechanical System.
IPC Stress Relief Lands and terminals shall be located by design so that components can be mounted or provided with stress relief bends in.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
INTRODUCTION SUPPORT STRUCTURSE FORCE - LONGITUDINAL FORCE - TRANSVERS
ENGR 211 Bridge Design Project
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
56 MHz SRF Cavity and Helium vessel Design
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
RFQ Subcomponents PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley National Laboratory.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Pipe Integrity Check using Finite Element Analysis
ELECTRONIC ASSEMBLIES AND SOLDERING TECHNIQUE –PART II
GOVERNMENT ENGINEERING COLLEGE, BHAVNAGAR TOPIC : INTRODUCTION TO PRESSURE VESSELS Prepared By :- 1.Aal Akash Ansari Aarif.
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Spectrometer Solenoid Fabrication Status and Schedule
INTRODUCTION TO PRESSURE VESSELS
SNS PPU Helium Vessel Design and Assembly
SNS PPU Cryomodule Space Frame
SNS PPU Cryomodule Thermal Shield & MLI
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

1 LHC-DFBX Shipping Specification Steve Virostek LBNL Presented at the DFBX RFP Review October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC ACCELERATOR PROJECT

2 Presentation Summary  Shipping Specification Details Introduction Description, Destination and Schedule Crate Performance Requirements Preparation for Shipping Instrumentation Shipping Crate Features Acceptance Criteria  Shipping Load Analysis Approach Scope Results

3 Shipping Spec Introduction  LBNL is designing 8 DFBX’s for LHC  Each feedbox shipped in its own fully enclosed crate Shock and vibration protection, environmental control  Specification gives shipping crate design requirements Hardware geometry, allowable accelerations, etc.  Fabrication vendor has all shipping responsibilities Design and fabrication of crates Arrangement and coordination of shipping Schedule specified in the RFP Statement of Work LBNL responsible for Customs clearance and duties (if any)

4 Description, Destination and Schedule  Shipment Description Eight boxes given by six LBNL top-level assembly drawings Figure shows 3D model image with overall dimensions Figure shows location of center of mass for DFBX “G” box  Destination and Shipping Dates Spec gives shipping address and contact at CERN Vendor chooses appropriate transport mode to meet schedule >1 feedbox in same shipment acceptable (separate crates) Feedboxes must satisfy the Acceptance Criteria Document (LBNL Engineering Spec M989) before and after shipping

5 DFBX Overall Dimensions 82 in in in.

6 DFBX “G” Box Center of Mass

7 Crate Performance Requirements  Analysis performed to determine DFBX tolerance to shock Details of analysis in LBNL Engineering Note M8043  Maximum vertical shock transmitted to feedbox: +5.0g  Maximum horizontal shock transmitted to feedbox: +2.0g  Fully loaded crate has a 1 st mode >5 Hz and <10 Hz  Drop height requirement: 6” with <5 g’s transmitted to feedbox  Feedbox supported uniformly across bottom surface Jack mounting points not used for support within crate

8 Preparation for Shipping  Various DFBX components to be backfilled before shipping Described in Acceptance Criteria Document (Spec. M989)  Added supports used to restrain internal piping as required Installed through the feedbox end flanges  D1, Q3, JC1 and JC2 flange caps support ends of pipes  All other external piping restrained as appropriate  High current leads to be protected by covers or shields Prevents damage during loading/unloading

9 Shipping Crate Instrumentation  Four self contained, tri-axial acceleration acquisition systems (transport loggers) used per crate Two used inside crate on feedbox, two outside Full scale range of +10 g’s on all units Data to be stored over duration of shipment Capability to read data during shipment  Detailed accelerometer specs provided by LBNL  Re-use of accelerometer systems permitted  Vendor to provide data records to LBNL

10 Shipping Crate Features  Vendor to incorporate the following features: Full enclosure of the feedbox on all sides Sufficient interior restraint to prevent shifting Supported only on vacuum box 1.25” thick exterior surfaces Exterior features allow tie down and lifting by crane/forklift Sized to allow lifting by crane with 17 ft maximum hook height Provision for repeated feedbox access without crate damage Protection from prolonged exposure to weather Warning labels in multiple languages (fragile, shock recorders) Warning labels against tipping or stacking of crates Extra interior space in crate for miscellaneous DFBX hardware Welds used in crate fabrication conform to AWS Code

11 Acceptance Criteria  LBNL to evaluate crate design in a preliminary design review Vendor responsible for crate performance, regardless of any implied approval by LBNL  Success of shipment to CERN based on satisfaction of the Acceptance Criteria Document requirements (M989)  Source of any excessive shock loads to be identified by vendor and eliminated in future DFBX shipments

12 Analysis Approach  Analyze acceleration limits of LHC primary components and sub-systems to shock and vibration loading  Develop new or use existing FEA models where needed  Differentiate between axial, lateral and vertical directions  Establish overall shock loading acceleration limits  Calculate natural frequencies of system components to determine response characteristics to cyclic loading  Identify internal or external components that require additional support during shipping

13 Analysis Scope  Vacuum box including weight of internal components  Liquid helium vessel structure, supports and bellows  Thermal shield stresses and deflections  Surge tank supports including thrust bracket  High current leads (vapor cooled and HTS leads)  Bus duct free end support  Other internal pipes and external free ends  Pipe support spiders (Q3, D1, QRL and center spiders)

14 Analysis Results  Vacuum Box - stresses and vibrational modes from FEA model box stresses < allowable for10 g’s in any direction lowest vibrational mode: 22 Hz lateral (LHe vessel bellows) all other modes are >35 Hz  Helium Vessel - support loads & bellows deflections from FEA shipping loads minimal compared to test pressure (>10 g’s) tank supports: 8.6 g’s axial (lower support brackets), 10.4 g’s lateral (vert. suppt. buckling), 18 g’s vertical (struts) bellows limits of travel: 4.5 g’s lateral, 31 g’s axially, no limit vertically due to vertical struts

15 Analysis Results (continued)  High Current Leads HTS lead cantilevered ends: >10 g’s in all dir. (G-10 sleeve) HTS terminator ear:17 lb with 175 lb allowable force (~10 g) vapor cooled leads:16” free length resulting in 32 g limit vapor cooled leads deflect ~10 mils at ends under 1 g loading  Thermal Shield: FEA results for portions of thermal shield stress limits: 12 g’s vertically, 5 g’s laterally  Surge Tank 20 g vertical limit based on axial strength of G-10 supports 3.5 g axial limit based on bending of G-10 supports 12 g lateral limit based on tension and bending in supports