Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project
Advertisements

Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
May 2013 Tehachapi Renewable Transmission Project (TRTP)
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
Clean, Reliable, and Low Cost Energy for the for theCaribbean December, 2006 Confidential.
California Energy Commission Workshop Nuclear Power Plant Issues
Mark Kempic President Columbia Gas of Maryland, Inc. Maryland-District of Columbia Utilities Association Fall Conference Fueling the Economic Engine.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
® Investor Meetings June 7-8, 2010 PG&E Corporation.
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
An Overview of Our Regulatory Proposal
Montana Ambassadors Helena, Montana February 25, 2011.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.
ISO Grid Planning Presentation to CREPC October 1, 2002
Charles Hosken, General Manager Imperial Irrigation District
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WESTERN UNDERGROUND COMMITTEE 2015 Spring Conference 65 th ANNIVERSARY 1950‐2015 Welcome Remarks Bill Chiu Director of Engineering – T&D Southern California.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
Pat Wood III, Chairman Federal Energy Regulatory Commission Bringing Power to California Customers Silicon Valley Manufacturing Group May 27, 2004.
Eastern Interconnection Phasor Project Modernizing North America’s Electric Grid Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability.
Facts about energy and water and wastewater in California Total Statewide Electricity Use for Water >19% Use of water by residents, businesses, and agriculture.
Office of Electricity Transmission and Distribution September 2003 Marshall Reed U.S. Department of Energy.
1 W7 Identifying Opportunities by Gathering and Analyzing Corporate Spend Data Pacific Gas and Electric Company Joan Kerr Director, Supplier Diversity.
Transmission Planning at the California ISO September 10, 2015.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
New Hampshire Energy Summit Rich Paglia President, Maritimes & Northeast Pipeline Vice President, Marketing New England Pipeline Expansion Update.
1 AEP’s gridSMART sm Initiative FCC Workshop August 25, 2009 Jason D Griffith Director – IT Telecom Engineering.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Regulatory Reform to Support New Infrastructure Steve Kidwell MARC 2010 June 7, 2010.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
Updated 1/28/2011.
Electric Utility Perspective on the Water-Energy Nexus Jack Sahl, Director Environment and Resource Sustainability Southern California Edison August 28,
AEE So Cal September 24, 2015 Integrating Renewables and The Distribution Grid of the Future 1.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
California Energy Commission Draft 2015 Integrated Energy Policy Report October 20, 2015 Presented by Heather Raitt Assistant Executive Director for Policy.
1 Case Study: Pacific Gas & Electric Company San Francisco Lifelines Council Edwards Salas Senior Vice President, Engineering and Operations, PG&E February,
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Monterey Plaza Hotel October 8-10, 2007
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
November 20, 2015 Challenges of Storage Development - Advanced Rail Energy Storage (ARES) Prepared for Bulk Storage Conference, Sacramento November 20,
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
SFPUC IRP Presentation to CEC April 18, INTEGRATED RESOURCE PLANNING SAN FRANCISCO PUC JAMES HENDRY SAN FRANCISCO PUC.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
LNBA Subgroup: Avoided Transmission Value
SEIA Perspective on Marginal/Avoided CAISO Transmission Costs
Opportunities in the Changing Energy System
Presentation transcript:

Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company September 8,

2 Pacific Gas and Electric Company - Overview Headquarters Location San Francisco, CA Service Area 70,000 square miles in northern and central California Service Area Population 15 million people (or about 1 of every 20 Americans) Distribution Customer Accounts 5.1 million electric, 4.3 million gas Employees Approximately 20,000 System  159,364 miles of electric transmission and distribution lines  48,198 miles of natural gas T&D pipelines  6,900 megawatts of generation, including Diablo Canyon nuclear power plant, Helms pumped storage plant, and one of the largest hydroelectric systems in the country

Challenges and Drivers  Challenges to Building Transmission –Permitting and Siting –Multiple Planning Processes –Construction  Main Drivers for Transmission –Reliability –Renewable Portfolio Standards 3

Reliability PG&E continues to strengthen and modernize its electric transmission grid. - Two-fold increase since Replace aging Infrastructure -Improve service reliability -Automate operation, SCADA and improve system protection -Modernize design and configurations -Connect new generation and accommodate aging generation retirement -Meet demand increase PG&E Capital Spend on Reliability Projects Forecasted 4

Renewable Portfolio Standard - CA State Impacts -Increased Import Capability -Lower System Losses -Access to new renewable resources -Improved Reliability -CA State Challenges -Concentration of SoCal resources -Intermittency Issues -Resource Planning – LGIP -Transmission permitting -Regional Challenges -Increase of out of state transfers -Need for broader coordinated planning process -Treatment of economics, reliability, operational benefits 5

Large Generator Interconnection Process (LGIP)  Transition to improved interconnection process is ongoing  Results of Phase 1 of LGIP –Assessed needed network upgrades –108 projects evaluated totaling 39,000 MW –Billion in system upgrades  Key Issues –Number of projects in the process –Security postings – CAISO stakeholders working on improvements –Recommendations to CAISO Board on Sept. 11 6

Process Challenges  Industry ability to plan, approve, and build necessary transmission.  Multiple Jurisdictions and Processes –CAISO –MUNIs –CPUC Permits –CEC Permits –WECC TEPPC –FERC  Meeting Challenges by –Understand limitations of existing process –Streamline process to minimize duplication –Objective on results that facilitate project progress 7

Oregon Malin Captain Jack California Gates Diablo Midway Tracy Vincent Tesla Moss LandingLos Banos Vaca Dixon Round Mt Metcalf Olinda Table Mt Gregg Bellota  PG&E collaborating on planning to develop a statewide transmission plan. Near and long term efforts include: –RETI –CTPG –CAISO –TEPPC  PG&E proactively focused on transmission line projects to meet renewables targets. –Canada – Northern California –C3ETP –Carrizo Plains –SCE projects in SoCal PG&E Plan & Vision To British Columbia Canada - NorCal C3ETP Carrizo Plains 8

Conclusion PG&E is optimistic that together with the State and all stakeholders California will both: - Build the necessary transmission for the States future and - Develop an effective planning process 9