Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.

Slides:



Advertisements
Similar presentations
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Report Chris Booth (for target team) Sheffield 23 rd April 2009.
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
Progress on Target Design Chris Booth Sheffield 2 nd August 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
Target Status Report Lara Howlett University of Sheffield.
Target Operation and Status Report Chris Booth for Target Team 20 th October 2008.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
Target Paper Status Summary 13 th December 2011 Chris Booth 1.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
P J SmithUniversity of Sheffield1 MICE Target Electronics Paul J Smith University of Sheffield Fermilab 10 th June 2006.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
Target Specifications & History (to avoid reinventing a broken wheel!) 2 nd December 2009 Chris Booth The University of Sheffield.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
DESIGN AND OPERATIONAL EXPERIENCE OF THE MICE TARGET Target Drive The linear electromagnetic drive that has been designed to meet these requirements consists.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
Target Design – Status and Plans Chris Booth Sheffield 12 th January 2005.
Target Operation and Status Report Chris Booth for Target Team 13 th January 2009 Outline Current target performance Investigation of demonstrator failure.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE Target Mechanism P J Smith University of Sheffield MICE CM 18 RAL June 2007.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
MICE Target - Risk Lara Howlett University of Sheffield.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
MICE Target Development Lara Howlett University of Sheffield.
Status of Target Design Chris Booth Sheffield 28 th October 2004.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
Target Installation Plan
MICE Target Report Video Conference 29/11/07
MICE Operations Scenario Run 1
Injectors BLM system: PS Ring installation at EYETS
Run period of summer 2012 Zoltán Fodor
Status of Target Design
Presentation transcript:

Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008

Chris BoothUniversity of Sheffield 2 Introduction Aim was to have both systems ready by 20 th January. A lot of minor problems and delays: Over half the mechanical parts ordered via RAL & DL and produced externally were not to specification. Most have been recoverable, but this has meant extra machining work –Diamond-edge seals sub-standard. –Mounting holes incorrectly centred on upper & lower flanges. –Incorrect target orientation on shaft. –Magnet clamps incorrectly made. –Optics block (for second system) distorted. –…

Chris BoothUniversity of Sheffield 3 Status of Installed Target & Controls Checked out in R78 Wednesday 16 th Stepper motor & interlocks ok. Target actuated 1000 times ok. Good vacuum (3.3×10 –7 mbar). Absolute position w.r.t. beam pipe measured. Moved to ISIS and connected Sunday 20 th Several damaged fibres discovered. (Neither route nor protection were as had been requested.) Optics (approximately) set up. Stepper motor & interlocks checked. Target raised & lowered several times. Operation from MICE LCR difficult without network. “Incident” resulted in damaged IGBTs. Power supply returned to DL, now repaired. (Better protection in future?)

Chris BoothUniversity of Sheffield 4 Requirements for Operation of Installed Target Adjustment of optical amplifiers (2 hours?) Changes to interlock programming (1 hour?) Cables and signals from ISIS: synchronisation, local beam loss, beam current. Matching receivers to above signals (gain, termination, timing) (2 hours?) Ethernet – essential to monitor temperatures, voltages etc from LCR, and to control PSU. Gate valve to be open. (Changes to control rack (Tuesday?) plus reconnection inside ISIS.) Procedure for personnel protection. (Limit switch missing?) And, of course, permission from ISIS to operate!

Chris BoothUniversity of Sheffield 5 Commissioning of Target (Basic minimum) Start with stepper motor raised Operate for few hundred actuations –Check synchronisation with ISIS (50/64 Hz?). –Adjust optical amplifiers if required. –Check coil temperatures with ISIS cooling water. –Check readout of beam-loss and ISIS current. –Set to minimum dip depth. Lower stepper motor to normal position and actuate Increase dip until see beam loss –Study stability of target and beam loss (how many pulses?) Gradually increase dip depth within allowed losses –Study correlation of loss with depth (and time?). –Other tests depend on readiness of beam monitors. –Do ISIS want a minimum number of pulses to check induced radiation? –Other tests??

Chris BoothUniversity of Sheffield 6 Preparation of Second Target Note: Preparation of mechanics and electronics are not independent!! Mechanics –Stator wiring completed Friday 25 th. –Check wiring, clean flanges & tube Monday. –Stator to DL Tuesday 9:00 a.m. for welding Tuesday (???), return to Sheffield Wednesday? –Clean & assemble optics block, collimators etc Monday p.m. –Alignment of optics Tuesday-Wednesday –Assemble shaft Tuesday-Wednesday. (Maybe remove DLC coating from target later??) –Modify bearing Wednesday p.m. –Complete assembly Thursday morning. –Minor parts (laser screen etc.) Thursday p.m. Electronics –Control crate wired, checked (without actuator) OK Friday 25 th. –DAQ box to be finished Saturday 26 th. –Quadrature amplifiers, 24-bit timer, PS crate ready DL Monday p.m. –Collect above 9:00 am Tuesday. –Interconnect, start debugging ASAP Tuesday (NB new printed circuits!) –(If problems with timer, leave till later – only needed for monitoring). –Connect full system to actuator Thursday p.m. Start optical amplifier adjustment and debugging. Complete by end Friday?