T. Okugi and M. WoodleyDecember 21, 20071 5 th ATF2 Project Meeting Summary of Session on Hardware/Devices for Commissioning.

Slides:



Advertisements
Similar presentations
1 Dynamic DNS. 2 Module - Dynamic DNS ♦ Overview The domain names and IP addresses of hosts and the devices may change for many reasons. This module focuses.
Advertisements

Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
REMOTE TROUBLE SCHOOTING WITH GANMVL Petra Schütt GSI WAO 2007, Trieste September 24, 2007.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Lucretia - Floodland Flight Simulator for ATF2 Glen White SLAC ATF2 Project Meeting Dec 2007.
TCP/IP Web Design & Layout January 23, TCP/IP For Dummies  The guts and the rules of the Internet and World Wide Web. A set of protocols, services,
NanoBPM schedule California Institute of Technology Toyoko Orimoto Cornell University Robert Meller DESY Vladimir Vogel KEK Hitoshi Hayano, Yosuke Honda,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Remote Participation on ATF possibility and difficulty. Nobuhiro Terunuma KEK 4th TB and SGC meeting, Daresbury, 2007/5/29 6th ATF2 project meeting, WebEx,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Project 1 Online multi-user video monitoring system.
Global Design Effort Experience on Remote Participation in ATF/ATF2 work ATF2 weekly meeting, May 16, 2007 Janice Nelson, Mark Woodley, Sergei Seletskiy,
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
Mark Woodley, SLACATF2 Software Review (June 18, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF2 Mover Software 19 June 2008 Janice Nelson, Doug McCormick (SLAC) Glen White (LAL/SLAC) Justin May (no longer at SLAC)
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Instrumentation Summary: Instrumentation QBPMs, Magnet Movers and Remote Shift Participation Justin May SLAC.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
Introduction to Grids By: Fetahi Z. Wuhib [CSD2004-Team19]
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Communicating over the Network Network Fundamentals – Chapter 2.
Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)
Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Upcoming Shift Work at ATF (November 26 – December 21, 2007) and Remote Participation from SLAC ATF training shifts proposal Rob Appleby (contact person,
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Windows Small Business Server 2003 R2 Powering Small Businesses.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
CERN, BE-ABP (Accelerators and Beam Physics group) Garcia, Pfingstner, Renier ATF operations training Report about the ATF operations training Hector Garcia.
LO2 Understand the key components used in networking.
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
Lucretia2AML Steve Molloy 3 rd April, 2008 ( Updated 19 th June, 2008)
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Dec06-02: Parking Meter Ryan King: Team Leader Kristen Goering: Communications Justin Smith John Scapillato.
Flight Simulator for ATF2
Expected hardware status and Priority of the commissioning task
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
Emittance Diagnostics
Laboratorio per dottorandi 2017 Particle Accelerators Control System
Function Generator Remote Control
ATF/ATF2 Control System
ATF2 Mover Software 15 December 2008
ATF2 IP Tuning Task Simulation Updates
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Multimedia and Networks
CUPS Print Services.
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
IP configuration session
A Virtual Implementation of VELA (CLARA)
Presentation transcript:

T. Okugi and M. WoodleyDecember 21, th ATF2 Project Meeting Summary of Session on Hardware/Devices for Commissioning

T. Okugi and M. WoodleyDecember 21, Presentations

T. Okugi and M. WoodleyDecember 21, highlights –v3.8 optics, parts list, etc. available ( –if necessary, KEK will make copies of FFTB movers... need drawings; Justin May will provide whatever he has (originally manufactured at Max Planck Institute?) –"prototype" mover (bad bearings) and three others will go back to SLAC homework –final selection of locations of IDX skew quadrupoles for vertical dispersion correction –many simulations; perhaps more fine tuning –Glen White and Okugi-san will study tuning with 3 missing movers and decide if fabricating new movers is necessary –Woodley will add Okugi-san's new IP layout to v3.8 –Woodley will add FONT/FF/FB devices to v3.8 (based on Alexander Kalinin's presentation at ATF2 Weekly Meeting of July 27, 2007 … see Javier Resta Lopez talk at Instrumentation Session) Woodley

T. Okugi and M. WoodleyDecember 21, highlights –temporary QBPM control panel maybe not necessary, given "first pulse" calibration (see Doug McCormick talk at Instrumentation Session) –new IP layout allows for standard S-band BPM adapter for QD0 (OK for present designs of sweeper, Honda monitor, and Shintake monitor support) homework –Okugi-san will check with IPBPM and Shintake monitor groups to see how IPBPM will be assembled to BSM structure with bellows Okugi-san

T. Okugi and M. WoodleyDecember 21, highlights –Lucretia-Floodland "middle layer“ has been developed for high-level applications –Flight Simulator (FS) access server runs on a "trusted" machine (in ATF Control Room) –access server must grant read and/or write access to individual PVs via EPICS Access Security Group (ASG) protocol … no access to unauthorized users –"test" FS must request access to PVs from "trusted” machine (must have authorized/registered MAC address, IP address, userid, … ) –interfaces to other accelerator codes (PLACET, SAD, MERLIN,... ) can be made –will use common lattice description file in Accelerator Markup Language (AML) … each optics code must interface to AML (directly or via translator and file exchange) homework –continue development Glen White

T. Okugi and M. WoodleyDecember 21, Terunuma-san’s responses to discussion points –problems with dual-monitor Webex not ATF problem... Webex/linux problem –VNC not allowed because it requires direct remote access into ATF local network –we can get an international-enabled dedicated phone line into ATF Control Room for callback... GDE must still pay the bill (KEK Webex license exists, but ALL calls are international and ~10 times more expensive than from US) –we can get a Polycom video camera (or similar) with remote pan/zoom capability (but shift leader must be able to switch off video) –ATF people are working on "data server" which lives outside of the ATF local network in the KEK "DMZ"... refreshed copies of control system data will be available –ATF eLog exists... will look into "print queue" access for adding graphics –schedule of beam studies available from ATF web... he's planning on implementing a system for submitting beamtime requests homework –international-capable phone line, cool video equipment, ATF data server, eLog improvements, … –Webex access (with callback) to Monday 13:30 meeting? Remote Participation