Art Deller ROS/WMS Update October 2013 RARF Data Completion Project.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Confidential & Proprietary to Cooper Compliance Corporation Revised September 8, 2014 AUDiT-READY TM.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s: Power Engineering 1 WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s Power Engineering Department of.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
Talk With Texas RE Protocol Compliance Department February 21, 2013.
Irish Evaluation Network Presentation The State of the Art of Evaluation in Ireland Dr. Richard Boyle Senior Research Officer Institute of Public Administration.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
High Voltage Power Electronics Technologies for Integrating Renewable Resources into the Grid RenewElec Workshop Carnegie Mellon University October 22,
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
1 NATIONAL TECHNICAL UNIVERSITY OF ATHENS (NTUA) School of Chemical Engineering Unit of Environmental Science and Technology (UEST) Katherine Haralambous.
Prepared by Dr. ML Chan, ML Consulting Group, USA & Mr. Yimin Wang, State Grid Corporation of China,
Woody Rickerson ROS/WMS Update June 2013 RARF Data Completion Project.
Macomber Map Demonstration
How Do You Write the Next Generation Climate Action Plan?
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
1 The Tres Amigas SuperStation VLPGO November 2011.
Common Information Model and EPRI Smart Grid Research
© 2001 Utility Management Consulting, Inc. All Rights Reserved Distributed Resources Interconnection Policies: A Report to EEI Members Presentation of.
“Dedicated professionals, committed to success by providing leading edge, prosperous solutions.“ Prosperitus Solutions Capabilities.
DC Tie Reservation and Scheduling with Mexico Shams Siddiqi representing Sharyland Utilities WMS Meeting May 15, 2007.
April 23 rd OWG UFLS Survey & Power Factor Review.
Roadmap on Long-Term US-Africa Research and Education Collaboration Joe H. Chow Rensselaer Polytechnic Institute Troy, New York, USA Third NSF Workshop.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.
1 Black Hills Corporation Electric Utility Services Vice President Utility Services Last Updated President & COO Utilities Chairman, President.
Engineering a sustainable future 1 ERCOT Voltage Ride-Through Study Workshop June 26 th, 2009.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Status Report for Critical Infrastructure Protection Advisory Group
VIP-ER Virtual Industrial Park – Emphasis Rural Phase I Technical Overview February 2005.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
© Copyright 2002 Frost & Sullivan. All Rights Reserved. Pan Asian Magnetic Resonance Imaging (MRI) Equipment Markets Demand for Economical Units “Growth.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Woody Rickerson ROS/WMS Update August 2013 RARF Data Completion Project.
Updated 1/28/2011.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
Art Deller ROS/WMS Update November 2013 RARF Data Completion Project.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
Panhandle Renewable Energy Zone (PREZ) Study
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
October 12, 2012 RPG Planning Guide 5.3.2(2) Developer obligation to keep RARF data updated Cathey Carter Resource Integration.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
RA workshop presentation Karl Meeusen, Ph.D. Senior Advisor – Infrastructure Policy CPUC Resource Adequacy Workshop February 18, 2016.
Jeannine Du Chateau Received B.S. degree in Chemical Engineering from Michigan Technological University.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
Speaker Bios.
Compliance Report to ERCOT BOD December 2006
VALUE OF INTERNAL AUDITING: ASSURANCE, INSIGHT, OBJECTIVITY
Merrill Brimhall – Engineer, Staff
Power and Energy An Introduction to Electric Regulatory NERC,FERC,CARB CAISO,CEC & DoE
Electricity Distribution Network Design Training & Courses
VALUE OF INTERNAL AUDITING: ASSURANCE, INSIGHT, OBJECTIVITY
Context: Scenario Studies
Context: Scenario Studies
WECC 2019 Scenario Demand-Side Models
Presentation transcript:

Art Deller ROS/WMS Update October 2013 RARF Data Completion Project

2 M ONTHLY P ROGRESS R EPORTS Resource Entities with Complete RARF Capacity Percentage Represented with Complete RARF Percentage of RARF Data Missing Starting September October

3 N EXT S TEPS Resource Entities with incomplete RARFs to get with RARF and estimates based on: –ERCOT historic data –Siemens developed estimation methodology Resource Entities with incomplete RARFs will either complete RARF with own information or use ERCOT estimates to submit completed RARF to ERCOT Entities not in compliance after December 1, 2013 will be reported to TRE ERCOT PUBLICFEBRUARY 21, 2012

4 S IEMENS T EAM Nelson Bacalao, PhD, Senior Manager of Consulting, with Siemens PTI in Houston, Texas, will be the Project Manager for the study. Dr. Bacalao is an Electrical Engineer with a Master of Science degree in electrical engineering, a Master of Business Administration degree, and a Ph.D. degree in power systems. With over 30 years of professional experience, Dr. Bacalao has extensive worldwide experience in evaluating the performance and planning of transmission systems in both in developed and developing Corporate Background and Experience Siemens Industry, Inc. – Siemens Power Technologies International P – Resource Asset Registration F 3-8 orm (RARF) Services Copyright © 2012 Siemens Industry, Inc. All Rights Reserved. countries. His experience is centered in system studies and economic evaluation, including recently advising TSPs in the evaluation of the CREZ transmission expansion plan in Texas as well as in the evaluation of several interconnections of large wind farms to the ERCOT 345 kV system. Alicia Dortch, Senior Consultant with Siemens PTI in Houston, Texas, has a solid foundation in electric system operations and transmission system planning. Her 8 years of professional experience covers an extensive range of topics including transmission planning, power flow analysis, dynamic stability analysis, and voltage stability analysis. She has performed numerous power system analyses and simulation studies for system expansions and new system interconnections. She complements her technical skills with experience in NERC and FERC compliance and audit preparedness. Jack Henry, PE, Senior Staff Consultant, with Siemens PTI in Houston, Texas. Mr. Henry is a licensed Professional Engineer (PE) in Texas with more than 30 years of extensive power systems industry experience in the transmission and generation sectors. He has a solid power system background in transmission planning and distribution, including power flow analysis, post-transient analysis, voltage stability analysis and dynamic stability analysis. His expertise also includes modeling and simulation of transmission projects for long-term development plans, real-time generation operations with respect to the integrated transmission system, and day/month-ahead transmission and generator strategic operations planning integrating real-time and planned transmission maintenance information. Mr. Henry joined Siemens PTI in 2010 and has been conducting power system studies, power system modeling, and generator interconnection assessments, providing engineering solutions for the power industry.