API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Review of industry code governance 26 March 2010.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Interim Solution What it is and how to to use it 21 June 2012.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
1 Accredited Standards Committee C63 ® - EMC SC5 Report Stephen R Whitesell Chair 11/14/2013.
Doc.: IEEE /197R0 Submission March 2003 Terry Cole, AMDSlide WG Technical Editor’s Report Terry Cole, AMD (WG technical editor status.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
WG9 Report ISO/TC211 Plenary Meeting Montreal, Canada
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Worthington Renaissance – Ft. Worth, TX 26 Jan 2011 – 8:00 am.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 15 December 2011 Presented by Vladimir Vernikovskij, Russian Coordinator of RN01.
San Francisco, CA. SC8 Liaison Report
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/Sep/05 Munich, Germany.
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/ Dec /0 4 Chicago, USA.
SAB Secretary Report Debbie Brown February 3, 2016 Standards Activities Board.
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
1 Conference on U.S. Leadership in ISO and IEC Technical Committees Presented by David Q. McDowell Chair, USTAG ISO TC130 USTAGs and Joint Working Groups.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
ISO/TC 204 WG 3-Database Technologies
ECMA-328 2nd edition Invitation for open review
DRAFT JOINT VISION FOR ALIGNED REVISIONS OF ISO AND ISO 9001
ISO TC 108 SC3 Liaison to CCAUV
Updates from SC18 Summer Meeting
Task Group API 19SS Sand Screens
API 16C Choke and Kill Equipment
ISO TC64/SC4/WG2 June 2010 status
2016 Exploration & Production Standards Conference Subcommittee 10
ISO TC64/SC4/WG2 May 2011 status
RAISING PERFORMANCE. TOGETHERTM
API SC 10, Work Group 3 Update:
WG Technical Editor’s Report
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
SC13TG08 Drilling Fluid Materials
ANSI REFRESHER COURSE 2018 CHANGES TO THE ISO DIRECTIVES
WG Technical Editor’s Report
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
IEC TC93 Liaison Report DASC SC Alex Zamfirescu IEC USNC Technical Aadviser TC93 Convener IEC TC93 WG2 September,
ISO TC67/SC4 Annual Meeting
Meetings.
API SC 10 WG15 Stage Cementing Collars
WG Technical Editor’s Report
SC 18 Liaison Report Winter 2012
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
Item 6 of the Agenda Balance of Payments Working Group 2-3 April 2012
API 16RCD January 2019 Specification for Rotating Control Devices
Presentation transcript:

API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante Chair

Joint API/ISO Work Group Charge Based on the Minutes of the E & P Standards Conference on Oilfield Equipment and Materials API Subcommittee 18 and ISO/TC 67/WG 2 Meeting San Antonio, Texas January 22 nd & 23 th 2009

API SC18 TG2 Charge SC18 to assign to TG2 the charge to review the new amended 9001:2008 and recommend a path forward within ISO and any changes to the supplemental requirements with respect to Spec Q1.

ISO TC-67 Work Group Charge It is obvious that the changes in the ISO 9001 version will have to be implemented in the ISO/TS boxed texts 1 on 1. WG 2 is responsible for the supplemental paragraphs. Action Joint Task Group: The joint task group is therefore asked to study the changes in the new ISO 9001:2008 version and to advise TC-67 on un- inventible amendments necessary in the ISO/TS supplemental paragraphs due to the changed ISO 9001:2008 version. WG 2 sees two main possible procedural routes. Either publication of an amendment to the current version of the ISO/TS / Q1 or publication of a revised 2009 version of the ISO/TS / Q1 by using a fast track process. Action Joint Task Group: Depending on the need for changes in the supplementals the joint task group is asked for their advice on the way forward (amendment route or new 2009 publication route).

Joint WG Recommendation Based on WG Meetings May 29, Houston, Texas and June 23, 2009, Westminster Colorado It is the Joint WG recommendation to issue an Amendment of TS to align the document with ISO 9001:2008. This amendment should include administrative corrections only and no revisions to supplemental requirements at this time. This methodology is permitted by ISO and would provide the most expeditious process for publishing the amended document, rather than publishing a new edition. Once the Amended TS document is published API would adopt the amended document and would issue an addendum to API Q1 8 th edition. This process would maintain API Q1 and ISO as identical documents.

PublicationProcess Once the Joint WG recommendation to proceed is accepted by TC 67 and SC 18 The project leader (Ed Durante) will prepare the draft amended document Harold Pawlens will prepare the ISO new work item proposal ballot form for the Amendment. Ed Baniak will coordinate this on the API side. An amendment goes through the same procedure as any ISO standards. (This could be agreed by correspondence or at the TC 67 meeting) The Draft amendment (ISO/DAM) is then created and circulated to TC67 members for approval. As this amendment is envisaged to be rather small, and should be able to get it through the process fast. API would then adopt back and publish the amended document Under this process it is possible to have both documents published by year end 2009.