Jochen Frühauf CBM-Collaboration Meeting
Status PADI PCBs Readout System FEET-PADI & CAEN HPTDC ◦ Active LVDS Splitter ◦ Results Readout System FEET-PADI/FEET-GET4 & ROC ◦ Overview ◦ Status Outlook 2 Jochen Frühauf CBM-Collaboration Meeting
PADI II ◦ 4 China ◦ 2 India ◦ 1 Heidelberg (Sebastian Manz / ROC Setup) ◦ 3 GSI (3 PCBs not fully equipped) PADI III ◦ 2 Rossendorf (CAEN Setup) ◦ 2 Heidelberg (Ingo Deppner / CAEN Setup) ◦ 9 GSI (6 PCBs not fully equipped) 30 PADI II & 30 PADI III are GSI o PCBs are not available at the moment (one PCB is equipped with 2 PADIs => 8 Channel) 3 Jochen Frühauf CBM-Collaboration Meeting
2 CAEN HPTDCs V1290 ◦ one TDC for leading edge and one TDC for trailing edge =>it is necessary to split the output signals of PADI problems with passive splitting leaded to an active solution ◦ tests with 1:10 LVDS-Splitter (Clock Distributor 2, Karsten Koch) 4 Jochen Frühauf CBM-Collaboration Meeting
5 Pulse Generator Trigger Logic LVDS LVTTL 1:10 LVDS Splitter 1:10 LVDS Splitter Jochen Frühauf CBM-Collaboration Meeting Attenuator VME-Readout Reference Signal Dead Time lock TDC A TDC B Trigger FEET-PADI
35 ps typical from HPTDC manual From reference signal split into two channels of TDC 6 Jochen Frühauf CBM-Collaboration Meeting =>developed PCB with 8x1:2 splitter for Feet-PADI
LVDS Splitter for FEET-PADI (FEET-PADI-LVDS-AD1) 8 x 1:2 LVDS Splitter (MAX9174) 100Ω impedance controlled PCB 1 PCB for 1 FEET-PADI 30 PCBs are ordered ◦ delivery date (not equipped!) Input PADI Signals Output for TDC A Output for TDC B 70mm 7 Jochen Frühauf CBM-Collaboration Meeting
system tests in Heidelberg with HD-RPC (Ingo Deppner) ◦ will be used next Beam time possible that all “Test-RPCs” will have the same readout system ◦ => good for comparison of the different RPCs LVDS splitter for FEET-PADI will be available soon 8 Jochen Frühauf CBM-Collaboration Meeting
9
CLOSY2 (Karsten Koch) ◦ Clock Generator (250MHz, 156.5MHz, Sync Pulse) 3x Clock Distribution2 (Karsten Koch) FEET-PADI (Mircea Ciobanu) FEET-GET4 (Holger Flemming/Harald Deppe) R2F (Holger Flemming) ◦ (Adapter between FEET-GET4 & ROC) ROC (KIP Heidelberg) 10 Jochen Frühauf CBM-Collaboration Meeting
2 full systems are available for tests ◦ GSI ◦ KIP Heidelberg only a few communication tests are done 11 Jochen Frühauf CBM-Collaboration Meeting
no Input – Signals for FEET-PADI Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: …….. Jochen Frühauf CBM-Collaboration Meeting
24 times ◦ Msg:5 Roc:0 Epoch2: ◦ Msg:5 Roc:0 Epoch2: followed by 1 time ◦ Msg:5 Roc:0 Epoch2: Msg:5 Roc:0 Epoch2: Bit for “CLOSY SYNC PULSE” Data GET4 Nr.:0 and Nr.:1 amount of Epoch messages & Sync Pulse message are consistent Jochen Frühauf CBM-Collaboration Meeting
with 50mV / 10ns Input Signals for FEET-PADI CH1/CH8 Msg:6 Roc:0 Get4:01 Chn:3 Edge:1 Ts:7c43a Msg:6 Roc:0 Get4:00 Chn:0 Edge:0 Ts:784c0 Msg:6 Roc:0 Get4:01 Chn:3 Edge:1 Ts:7c47c Msg:6 Roc:0 Get4:00 Chn:0 Edge:1 Ts:7c438 Msg:5 Roc:0 Epoch2: Msg:6 Roc:0 Get4:00 Chn:0 Edge:1 Ts:7c47a Msg:6 Roc:0 Get4:01 Chn:3 Edge:0 Ts:0851e Msg:5 Roc:0 Epoch2: Msg:6 Roc:0 Get4:01 Chn:3 Edge:0 Ts:08560 Msg:6 Roc:0 Get4:00 Chn:0 Edge:0 Ts:08511 Msg:6 Roc:0 Get4:01 Chn:3 Edge:1 Ts:084fc ………… Jochen Frühauf CBM-Collaboration Meeting
data shows hits in the used channel timestamp counters of GET4 are increasing up to the next “Epoch Message” and afterwards these counters are reseted different error messages and external sync events in the data stream ◦ only for input signals in the 2 nd GET4 chip ◦ no error or ext. sync messages for the 1 st chip crosstalk in the 2 nd GET4 Chip ◦ only from Channel 0,1,2 to Channel 3 Jochen Frühauf CBM-Collaboration Meeting
modification in the FPGA code of the ROC ◦ include timestamp counters, system messages GO4 analysis testing setup test Or-Output of PADI test I 2 C Interface of FEET-PADI for threshold adjustment 16 Jochen Frühauf CBM-Collaboration Meeting