Faculty of Physics, University of Belgrade General meeting 19 th of August, 2014. ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.

Slides:



Advertisements
Similar presentations
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
Advertisements

DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Faculty of Physics, University of Belgrade General meeting 3 rd of June, ToF-L/R Performance Marjan Ćirković, Faculty of Physics, Belgrade.
Scalable Server Load Balancing Inside Data Centers Dana Butnariu Princeton University Computer Science Department July – September 2010 Joint work with.
LKr readout: present and future R. Fantechi 30/8/2012.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
LV and HV status of the RPC system RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
TE/MPE-TM GRZEGORZ SEWERYN THE UPGRADE OF TT SENSORS C-50 TO THE REDEL CONNECTOR 1.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
UPGRADING MEMORY BY : tuan mohd fariz.  Choosing and Installing Memory.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Semester 1 v CCNA 1 Module 1:Introduction. Semester 1 v Connecting to the Internet.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
BRANs Sune Jakobsen (BE-BI-PM) LHC BI 2015 summary
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
Faculty of Physics, University of Belgrade General meeting, 19 th of May, Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade.
Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Faculty of Physics, University of Belgrade Collaboration meeting, Zagreb, 10 th of October, Remote control and monitoring of ToF-L/R detector Jovan.
Faculty of Physics, University of Belgrade Collaboration meeting, Dubna 8 th of April, ToF-LR Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
Progress on resistor failure diagnosis Ben J ( + Matt, Zander)
LKr status R. Fantechi.
LAV front-end and readout status
The High Voltage problem
Jean-Sebastien Graulich, Geneva
2009: restart the system: few observations. Hw maintenance week:
Roger Wendell for the OD group
EMU Slice Test Run Plan a working document.
SHMS "pivot-patch" cable run Experiments: NPS, LAD(?), CGEN(?)
Disabling Rules.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Presentation transcript:

Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade

Faculty of Physics, University of Belgrade General meeting, Page 2 out of 24 Jovan Puzović, Belgrade SHINE team Introduction In the last 3 years we observe increasing failing rate of HV CAEN distributor units due to aging (4-5 per year) We already inherited a lot of bad distributors from previous period Long term stability od ToF HV system cannot be achieve with existing equipment The decision to refurbish the system has made

Faculty of Physics, University of Belgrade General meeting, Page 3 out of 24 Jovan Puzović, Belgrade SHINE team Plan The idea is to replace the HV system in ToF-R with the new one and use working components as spare parts for ToF-L New (sophisticated) system from CAEN very expensive (~150 kEUR) Custom system, based on resistors divider, is much cheaper (~30kEUR) and enable needed functionality (HV reading, but not setting)

Faculty of Physics, University of Belgrade General meeting, Page 4 out of 24 Jovan Puzović, Belgrade SHINE team Advantages Electronics is not complicate, expecting robust design, stable work and lower failing rate Price is ~5 times less comparing to new CAEN system needed to replace the old one High voltage level can be monitored by control logic in crate by using already existed cables and software in PC located in counting room Without monitoring (losing of communication or power) can run in passive mode

Faculty of Physics, University of Belgrade General meeting, Page 5 out of 24 Jovan Puzović, Belgrade SHINE team Disadvantages Complicate procedure of setting and calibration Every distributor board is unique (according to HV specification for their set of channels) – not interchangeable HV can be monitored, but cannot be set without hardware changes on the board

Faculty of Physics, University of Belgrade General meeting, Page 6 out of 24 Jovan Puzović, Belgrade SHINE team ToF-LR HV upgrade All hardware finished!

Faculty of Physics, University of Belgrade General meeting, Page 7 out of 24 Jovan Puzović, Belgrade SHINE team ToF-R Caen Crates Crates 1 and 2 dismounted in January (near beam, easy to do), fully functionally Crates 3 and 4 dismounted now (far of the beam, bunch of cables, has to remove front panel of the crate and pull it backward, lot of jobs, time consuming… ) Crate 3 already malfunctioned, 3 slots didn’t work, those slots have been populated with custom made distributors in August 2012 Crate 4 slightly damaged during dismounting (one cable was broken), can be repaired (2-3 hours of work), but it is not urgent now 2 fully working crates spare

Faculty of Physics, University of Belgrade General meeting, Page 8 out of 24 Jovan Puzović, Belgrade SHINE team ToF-L Caen Crates Crate 3 on the left side was founded with one bad slot (9) This crate is far of the beam, on top, hard to dismount Hopefully, this slot was populated with Russian type distributor We decided not to touch it at the moment, and return Russian type distributor in broken slot

Faculty of Physics, University of Belgrade General meeting, Page 9 out of 24 Jovan Puzović, Belgrade SHINE team ToF-R Caen Distributors 14 distributors fully working, used to replace bad one on left side We repaired 14 more distributors (from both side) by bypassing HV relay, 7 of them used to replace bad one on the left side 7 fully functional distributors left as spare, plus 7 with one dead channel which also can be use as spare Still have 3 Russian type distributors, in the case of emergency In total: 21 distributors replaced on the left side In total: 7 (all channels) + 7 (one bad channel) + 3 (Russian type) spare distributors

Faculty of Physics, University of Belgrade General meeting, Page 10 out of 24 Jovan Puzović, Belgrade SHINE team ToF-R Caen Distributors 14 distributors fully working, used to replace bad one on left side We repaired 14 more distributors (from both side) by bypassing HV relay, 7 of them used to replace bad one on the left side 7 fully functional distributors left as spare, plus 7 with one dead channel which can be use also as spare Still have 3 Russian type distributors, in the case of emergency In total: 21 distributors replaced on the left side In total: 7 (all channels) + 7 (one bad channel) + 3 (Russian type) spare distributors

Faculty of Physics, University of Belgrade General meeting, Page 11 out of 24 Jovan Puzović, Belgrade SHINE team ToF-R New Distributors All 4 crates installed in the pit All distributors installed Communication with PC in counting room established Monitoring program finished All HV readout channels calibrated We have problems with 4 HV channels (out of 891), not at nominal voltage, resistors have to be check

Faculty of Physics, University of Belgrade General meeting, Page 12 out of 24 Jovan Puzović, Belgrade SHINE team Summary Left wallRight wall End of BeBe run Now End of BeBe run Now Bad distributors22 1 (1 channel) 11- Bad channels (undervoltage) problematic

Faculty of Physics, University of Belgrade General meeting, Page 13 out of 24 Jovan Puzović, Belgrade SHINE team Bad pixels Tomorrow we start examination of problematic cassette and pixels on the left side We hope that we can open 5-6 most problematic cassette and find the reason why some pixels are dead If they are broken, we try to replace them

Faculty of Physics, University of Belgrade General meeting, Page 14 out of 24 Jovan Puzović, Belgrade SHINE team Thank you!