11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.

Slides:



Advertisements
Similar presentations
Establishing a New Accreditation Program in the U.S.
Advertisements

Process and Product Quality Assurance (PPQA)
Program Management Office (PMO) Design
ISO 9001:2000 Documentation Requirements
Ensure Vendor/Engineer of Choice Product Quality
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
Contractor Assurance System AC Overview October 13, 2009.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Fermilab’s New Quality Assurance Program Irwin Gaines 23-Jan-2008.
1 Approach to Implementing the QA Program Local Effort - Global Expectations Approach to Implementing the QA Program Local Effort - Global Expectations.
Assurance Council Brief Status of QA Implementation at Fermilab Tuesday Nov 11, 2008 Jed Heyes.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
The ISO 9002 Quality Assurance Management System
Stepan Potiyenko ISS Sr.SW Developer.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Quality evaluation and improvement for Internal Audit
Purpose of the Standards
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
Conducting the IT Audit
Internal Auditing and Outsourcing
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Introduction to ISO New and modified requirements.
COMPANY CONFIDENTIAL Page 1 Final Findings Briefing Client ABC Ltd CMMI (SW) – Ver 1.2 Staged Representation Conducted by: QAI India SM - CMMI is a service.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 Integrated Safety Management Peer Review Corrective Action Plan Howard K. Hatayama Director Environmental Health and Safety Division Presented to the.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Important informations
Georgia Institute of Technology CS 4320 Fall 2003.
Quality Assurance Policy in DOE Debbie Rosano Director, Office of Quality Assurance (AU-33) September 14, 2015 Presented to: 2015 Analytical Services Program.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AND COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
Lesson 1: Examining Professional Project Management Topic 1A: Identify Project Management Processes.
Scott Davis, Team Leader March 13,  SC DDFO established fiscal year 2009 Annual Performance Plan and assessments objectives, which included this.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
About District Accreditation Mrs. Sanchez & Mrs. Bethell Rickards Middle School
Continual Service Improvement Methods & Techniques.
AWARENESS OF HEALTH AND SAFETY IN THE WORKPLACE-A CASE AT AKUH, N Joshua Odero, Zahir Moloo, Zul Premji Department of Pathology, Aga Khan University Hospital,
CPA is a UKAS company The Assessment Visit UKAS Processes John Ringrow – Senior Assessment Manager.
© A2LA Understanding the Accreditation Hierarchy - Who’s Who and What’s What ? NCSL International Conference Orlando, FL August 7, 2008 by Roxanne.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Fermi Site Office Assessment of Fermilab Welding Quality Assurance June 20-24, 2016.
UNDERSTANDING ISO 9001:2008.
Software Quality Control and Quality Assurance: Introduction
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
ISO/IEC
Document Evaluation Process May 2005 Revision
Identify the Risk of Not Doing BA
Flooding Walkdown Guidance
CMMI – Staged Representation
Emulsion Task Force Meeting
How to conduct Effective Stage-1 Audit
DOE Review of the LCLS Project October 2006
Presentation transcript:

11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009

2 Purpose of Assessment Evaluate the adequacy of Fermilab’s QA program documents Evaluate the status of Fermilab’s efforts to implement their QA program

3 Assessment Scope Program Personnel Training & Qualification Quality Improvement Documents & Records Work Processes Design Procurement Inspection & Acceptance Testing Management Assessment Independent Assessment Suspect/Counterfeit Items Prevention

4 Assessment Scope (continued) Accelerator Division Particle Physics Division Technical Division Computing Division Business Services Section Workforce Development & Resources Section Facilities Engineering Services Section Environment, Safety & Health Section Office of Quality & Best Practices

55 Assessment Team Judy Malsbury, PPPL Jessie Wilke, BNL Bob Arthurs, ANL Margaret Legel, NBL Matt Cole, SC-31.1 Tom McDermott, SC-CH Karl Moro, SC-CH Tracy Sims, SC-CH John Adachi, SC-CH

6 Strengths The Laboratory Director understands the importance of QA and is providing leadership to drive the culture change necessary to institute the Fermilab Integrated Quality Assurance program.  Director communicates directly with Lab staff to convey the importance of the IQA  Transition from expert-based to process- based culture

7 Strengths (continued) The function and composition of the Fermilab Assurance Council, under the leadership of the COO, ensures upper management involvement in resolving significant cross-cutting issues. OQBP is applying project management discipline to the Laboratory’s efforts to develop and implement quality assurance throughout Fermilab; demonstrated by the Integrated Quality Assurance project plan.

8 Strengths (continued) The professional QA expertise of the OQBP QAEs, and the dedication of the line organization’s QARs is evident. Fermilab’s plans for a Consolidated Assessment Schedule should provide a mechanism to ensure appropriate assessment coverage of Laboratory operations.

9 Strengths (continued) The As-Is Process provided significant value to the efforts to institute the IQA –Established the base-line of the Lab’s conformance with the requirements of the IQA and FICAP –Developed integrated CAPs for the institution and line organizations –Piloted a more formal and rigorous assessment and corrective action process with full participation of the line organization

10 Strengths (continued) As part of the procurement process for complex items, vendors are often requested to complete a Technical Questionnaire, or submit a prototype, to test the vendor’s knowledge and capability.

11 Strengths (continued) The draft Fermilab Assessment Manual requires Management System Owners and D/S/C management to verify closure and validate effectiveness of corrective actions. The CD Problem Management Process and Procedure is an effective mechanism for the identification, analysis and resolution of problems. AD has piloted an innovative use of an iTouch device to communicate procedural steps through video to operators in the field.

12 Concerns The draft Fermilab Management Assessment Procedure does not require the identification of the assessment criteria, or provide direction or guidance on how to scope assessments. The criteria for determining the need for a complex or simple root cause analysis, contained in the Appendix of the Fermilab Corrective and Preventive Action Procedure, lacks sufficient direction for consistent application.

13 Concerns (continued) Terms in the draft Fermilab Assessment Manual: Minor findings, significant findings, special assessments, Fermilab Director’s Assessments, and third party assessments are not sufficiently defined to allow for consistent application. Some terms in the Definitions Section that are useful for characterizing the significance of assessment issues are not used in the body of the document nor in other documents germane to assessments (IQA, FICAP, draft Management Assessment and Corrective & Preventive Action procedures).

14 Concerns (continued) While there is a high level of awareness of the subject of S/CI at Fermilab, and S/CI have been effectively segregated from use, there is some confusion in the field regarding the requirements for final disposition of S/CI in the draft procedure being developed.

15 Concerns (continued) Integrated Quality Assurance Chapter Six Design indicates that the Laboratory will staff the position of Fermilab Chief Engineer, however interviews indicated that the decision to create and fill such a position has not been finalized.

16 Significant Concern The draft Fermi National Accelerator Laboratory Engineering Manual, Revision 0.2, does not provide sufficient detail and rigor to effectively implement Criterion 5(a) Work Processes and Criterion 6 Design of DOE O 414.1C Quality Assurance, Section 5.3 Work Process Control and Chapter Six Design of the FNAL Integrated Quality Assurance program document, or to adequately address the inadequacies identified in the Root Cause Analysis for the Large Hadron Collider Magnet System Failure.

17 Conclusions With the exception of the areas of concern, Fermilab’s efforts to institute the IQA are on track. Achieving the necessary culture change is the most difficult and challenging aspect of successfully instituting the Integrated Quality Assurance program; sustained emphasis by top management is necessary to successfully drive the culture change.

18 Next Steps Assessment team members will provide the write-ups of their sections to the Assessment Team Leader by October 2, Assessment Team Leader will produce draft assessment report by October 28, FSO provides draft report to Fermilab for factual accuracy review. Assessment team considers Laboratory’s comments, revises report as necessary, and finalizes assessment report. FSO issues assessment report to Fermilab.

19 Thanks FSO, Fermilab management, QAEs, QARs, Fermilab staff were open and cooperative; this greatly facilitated the efforts of the assessment team. The team members did the work necessary to serve on this assessment in addition to doing their “regular jobs”. The management of the organizations of the assessment team members allowed them to take time away from their “regular jobs” to serve on this assessment.