Tracking Education Budget (Building, Teachers, Computers, school meals) Experience from the Philippines.

Slides:



Advertisements
Similar presentations
The Rail Track Analogy Ties
Advertisements

Role of CSOs in monitoring Policies and Progress on MDGs.
How to Create a Meeting Agenda
A Real-world RFP Case 1994 Northridge Earthquake Causes Costly but non-life threatening damage in LA area Walt Disney Co. takes significant financial hit.
Presentationby Construction Association of Bhutan.
Presenter: M. Shohelur Rahman Chowdhury Procurement Specialist 1.
1 Fieldwork logistics and data quality control procedures Kathleen Beegle Workshop 17, Session 2 Designing and Implementing Household Surveys March 31,
Division of Special Education
Chairing a Florida Catholic Conference Accreditation Visitation.
Louisiana TAP Implementation Workshop 1 January 29, 2010 February 22, 2010.
“ Public Procurements in Practice ” December 14th 2010.
Tips from the Field Experience. Visual Aids Use visuals whenever possible. It’s most effective for hook activities. Check out books from the library.
Financial Management Information System
IS 425 Enterprise Information I Autumn LECTURE 6  2004 Norma Sutcliffe.
G-Watch & Textbook Count The Citizens’ Anti-Corruption Initiative Redempto S. PArafina Ateneo School of Government Philippines 12 th International Anti-Corruption.
Geldy Saryev Head of Industry, Transport and Communications Financing Department of the Ministry of Finance of Turkmenistan.
October 23,  What is Child Welfare Services New System Project?  Why a new system?  When can I expect a new system?  What’s next?  Question.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Audit of Public Procurement
Reducing Transaction Costs through e-Procurement Joint Cooperative Committee Sept Kyungsoon Chang PPS South Korea.
1 Ministry of Education Budget Execution March 28, 2010 As of.
The State Procurement Agency of the Republic of Azerbaijan Welcomes the participants of the 11 th Public Procurement Knowledge Exchange Forum “Procurement.
Presented By: Aundrea Tirapelle March 2, 2010URS Corporation.
Key Observations of the Post Review of Procurement carried out by Development Partners and TSG Consultants 24 th Review Meeting of State FCs- Delhi (3.
1 Advisory Group Meeting October 4, Topics to Be Discussed Overall Plan Overall Plan Review of Three Site Visits Review of Three Site Visits Congregation.
Finance Tasha Robinson Director of Finance (803)
Specification & Quantities Estimating
Like a Home Mortgage Refinancing:. Issued to construct HS 2004 Bonds (mature 2013 – 2029) 4.8% average interest rate Call Date Bonds.
AADAPT Workshop South Asia Goa, December 17-21, 2009 Maria Isabel Beltran 1.
DINALEDI CONDITIONAL GRANT: RD QUARTER PERFORMANCE.
– Ultranet 3 rd Industry Briefing Tuesday, 19 December 2006 DoE, 2 Treasury Place, Melbourne.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
MEETING WITH THE CHANCELLOR April 18, 2008 Second Quarterly Report DCPS Contract No. GAGA-2007-C-0258 (Amended from 0252) Woodrow Wilson Management Corporation,
Lynnette Roshell
2 nd Presentation to the School of Library and Information Science (SLIS) Community on Accreditation Planning Dr. Kimberly B. Kelley Dean, SLIS September.
Preparation for the distribution of ipads Aida Tajalli Virtual Learning Complex Facilitator Common Core Technology Project
Supplier Engagement & Tender Compliance. Procurement Officers: Paul Norman Julie Jones.
Sailing To District Accreditation External Review: October 6-9, 2013… but the journey begins now!
Milestone Meeting Milestone Meeting Client Activity / Task Client Activity / Task Design For Health Activity / Task Design For Health Activity / Task Document.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
MEETING WITH THE CHANCELLOR December 14, 2007 First Quarterly Report DCPS Contract No. GAGA-2007-C-0252 Woodrow Wilson Management Corporation, Inc.
1 School Board and Superintendent Continuous Improvement and Evaluation Quality New Mexico June 9, 2011.
Class of 2016 Senior Advisory 2/17/16. What’s next?
SADC REGIONAL WORKSHOP ON TRADE IN SERVICES STATISTICS FEB 2016 JNB/SA International Trade in Services UNCTAD-UEMOA project Viviane MWITIREHE In.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
HOW TO START AN INTERNSHIP FOR COLLEGE STUDENTS JIM KENNEY DSHS/ALTSA/HCS FEBRUARY 11, 2014.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Financial Administration Finance is the lifeblood of every business. As personnel and materials which are necessary for the functioning of any office,
Valley View Local Schools SELF ASSESSMENT/STRATEGIC PLAN UPDATE MARCH 2016.
The ITIL V3 Intermediate RCV Capability Complete Certification Kit - Second Edition Who Knew ITIL
DIVISION OF CEBU PROVINCE Monitoring, Evaluation, & Adjustment
Content of Tender Dossier - Instructions to Tenderers - Tenders
PLA NSW/ACT State Conference March 2014  Rydges Cronulla
Office Alterations RAF/2012/00027 Compulsory Briefing Session
Public Expenditure Management: Budget Execution
PUBLIC PROCUREMENT SYSTEM IN UZBEKISTAN
GROWTH STRATEGIES FOR SECONDARY EDUCATION IN ASIA
The Ministry of Finance of the Azerbaijan Republic
Planning for success is critical
General Services Department
Open Contracting Partnership
Aspiring School Leaders Information Session
FINANCE SECTION Mancom Presentation March 1, 2018.
PROJECT DOCUMENTATION
Design process.
Transparency … and Accountability May 2011
Public Procurement in The Maldives
Public Procurement and PFM
Presentation transcript:

Tracking Education Budget (Building, Teachers, Computers, school meals) Experience from the Philippines

Finance Ministry Prepares Disbursement/Fund Release Program Education Agency prepares Work & Financial Plan Program/Project/Activity Is Implemented Allotment Release Order is issued based on Plan Budget Execution Cash is Received by implementing Agency Reporting First Step – Know The Budget Execution Process

Documentation Forms Document Everything!

FIELD VISITS TO SCHOOLS School Principals or Head Teachers interviewed concerning the budget items to be tracked Relevant Documents are requested Dates funds received and procurement/ hiring and construction/repairs are checked Determine causes in cases of Delays Newly hired teachers are interviewed Parents and students interviewed for feedback and validation Photo documentation done

Bidding documents of Commonwealth ES school building project. The documents on the left are from the winning bidder Plan of works provided to Sitio Buga ES school head after the project was completed under the DepEd school building project in 2007 Tender Documents

Second floor classroom of the newly constructed building in Sta Monica HS Annex Second floor classroom showing the toilet in the newly constructed building in Sta Monica HS Sta Monica HS Annex showing the newly constructed 2-storey building on the left as an attachment.

Condemned classrooms adjacent to rooms with on-going classes School building in San Nicola ES with condemned rooms inhabited by snakes.

Ceiling of San Nicolas ES classroom repaired in February 2008 showing leaks.

Computer units delivered in March 2008 to San Pedro High School in Hagonoy, Bulacan under the DepEd Computerization Program Computer unit waiting to be installed in San Pedro High School, Hagonoy, Bulacan.

NOW, THE DON’Ts Do not track the entire education budget; select only the critical, sensitive or suspicious Do not do a corruption watch; this can be another project by another coalition Do not cover the entire country; take only what is feasible Engage others to help out in the tracking exercise Do not do a comprehensive survey; focus on tracking. Don't look at just the bad side. Do an appreciative inquiry. Know when to back off when “sailing gets rough”