Essex County Transportation Services Department Essex County Highways 2012 Construction Program Peter Bziuk P. Eng. Manager Construction Services
Essex County Highways 2012 Construction Program Highlights –$14,200,000 expenditure level –Includes approx. $1,100,000 from 2011 –Rehabilitation Program –Capacity Improvement Program
Rehabilitation Program 25 Planned Projects –5 Bridges ( 2 Engineering, 3 Construction ) –11 Roads –5 Maintenance –4 Culverts ( 2 Engineering, 2 Construction )
Capacity Improvement Program County is continuing a multi year capacity improvement program for the network County funding is being utilized, Senior level funding is being pursued 7 Planned Projects for 2012 –5 Construction, 2 Engineering
Essex County Highways Bridge Projects ($2,970,000) –3 Structure Rehabilitations CR Duck Creek CR Long Marsh Drain CR Collard Drain –1 Structure Rehab / Expansion: CR Puce River –2 Pre-engineering for 2013 construction: CR Silver Creek CR Moisson Creek
Essex County Highways Culvert / Drainage ( $1,182,000 ) –CR Maddox Drain culvert replacement –CR East Townline Drain improvements –CR 34 – Drain Improvement – Kingsville –2 – Culvert Engineering projects for 2012 CR Gzowski Drain CR Beaudoin Drain
Essex County Highways Road Projects ($4,940,000) –Recycling/Resurfacing: CR 19 Tecumseh/Lakeshore – 2.8 km CR 12 Essex – 3.0 km CR 20 LaSalle – 3.0 km CR 19 Lakeshore – 0.5 km CR 18 Kingsville – 1.1 km CR 34 Leamington – 5.9 km CR 8 Lakeshore/Essex – 2.2 km CR 8 Essex – 1.2 km CR 3 LaSalle – 1.7 km CR 10 Amherstburg – 4.1 km
Essex County Highways Pavement Preservation ( $250,000 ) –Route and Seal – various locations –Surface Treatment – various locations - 12 km Bridge Preservation –4 deck/expansion joint repairs –Various guiderail repairs / upgrades Estimated Quantities –39,740 tonnes of Hot Mix Asphalt –99,200 sm. of Pavement Recycling –17,550 tonnes of Granular A
Essex County Highways Capacity Projects ( $3,200,000 ) –CR 23/46 – Intersection Improvements – LS –CR 22 Phase 5 - Contract A – LS –CR 19/22 Improvements - Engineering –Various Connecting Link projects with Towns CR 19 - Tecumseh CR 6 – LaSalle CR 20 - Amherstburg
Essex County Highways EA’s / Engineering: –CR 19 / CR 22 with MTO Prelim. Design ($200M) –CR 22 – CR 2 to Puce Detailed Design ($18.5M) –CR 42 EA – CoW to CR 25 ($30M) –Lauzon Parkway Extension – MTO/CoW /CoE –Active Transportation Study ($52M) Adoption and implementation
Essex County Highways Thank you for your interest, Thank you for your support in delivering our annual programs, Looking forward to another successful construction season.