NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS 1.1.5.3 & 1.4.3.3 Presented by Fred Borcherding for the D0 Electronics Group.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
1 Installation Review Stefan Grünendahl CTT Installation Plan Current status General plan Power supplies + permits Basic installation + checking.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
AFE II Status. Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
1.2.7 Trigger A.Nappi TB Nov 11, Digitizers ( )  Functions 25 MHZ 10 bit p.h. + 6bit time digitizers Digital processing  Flavor A: p.h.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Online Reconstruction 1M.Ellis - CM th October 2008.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
CLAS12 Commissioning with Cosmincs
University of California Los Angeles
Tracker Software Status
Commissioning of the ALICE-PHOS trigger
Presentation transcript:

NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group

NIU Trigger Workshop Fred B. - Oct 22, Charge for the Workshop For each of the NIU sessions, we would like to have some prepared talks to cover the following: 1. Schedule of completion of the hardware 2. Test program at the board level (who, where, when?) 3. Test/commissioning of the sub-detector trigger or framework prior to commissioning in the D0 environment in the D0 Hall. (who, where, when?) what other resources are needed (serial links, downloads, COOR, clocks, etc.) 4. Commissioning in D0. What is the sequence, time estimate for the commissioning? How will cosmic ray studies be used? What interactions with other systems are required? Give an estimated schedule for commissioning.

NIU Trigger Workshop Fred B. - Oct 22, CTT Project  Four separate installations u CFT Axial u CFT Stereo u CPS Axial u CPS Stereo u (FPS)  Several Steps u Production u Board Test u System Test u Installation u ‘In Place’ Commissioning u Run

NIU Trigger Workshop Fred B. - Oct 22, System Size CTT has three sets of boards. CTT has a total of about 10 ‘boards’ CTT has very small signal Analog boards target of 5 fC threshold CTT has very high IO digital boards each DFE has ~15Gbits/sec input each MB has ~20Gbits/sec input & output AFE Board 8-MCM board 12-MCM board MCM daughter card Analog Input board DFE Board Mother board Transition board Daughter Boards Testing DB Tracking ( & cluster finding) collector (octant) DB2 MB Mixing Box Board Input board Output board MB Test Board

NIU Trigger Workshop Fred B. - Oct 22, Schedule of completion of the hardware CFT 8* Boards Manufactured 2/1/00 AFE [8-MCM] (8) 12/1/99 Seq/SeqC/VRB/VRBC 1/3/00 DFE+TDB (4) 3/6/00 CDB (1) 3/22/00 DB2 (1) 3/6/00 MB (1set) All Boards Manufactured 7/28/00 AFE [8-MCM] 12/1/99 Seq/SeqC/VRB/VRBC 5/1/00 DFE+TDB 7/3/00 CDB 7/14/00 DB2 7/10/00 MB FPS 8* Boards Manufactured 4/20/00 AFE [12-MCM] (4) 12/1/00 Seq/SeqC/VRB/VRBC 2/7/00 DFE+TDB (1) 4/3/00 CDB (1) 4/24/00 DB2 (1) All Boards Manufactured 7/28/00 AFE [12-MCM] 12/1/00 Seq/SeqC/VRB/VRBC 6/5/00 DFE+TDB 7/28/00 CDB 7/28/00 DB2 CPS 8* Boards Manufactured 4/20/00 AFE [12-MCM] (4) 12/1/00 Seq/SeqC/VRB/VRBC 2/7/00 DFE+TDB (1) 4/3/00 CDB (1) 4/24/00 DB2 (1) All Boards Manufactured 7/28/00 AFE [12-MCM] 12/1/00 Seq/SeqC/VRB/VRBC 6/5/00 DFE+TDB 7/28/00 CDB 7/28/00 DB2 NOTE: All dates subject to change

NIU Trigger Workshop Fred B. - Oct 22, Test program at the board level- WHO. AFE Board 8-MCM boardJohn A, Pat S, Paul R, Mike M, Stefan G; 12-MCM boardJohn A, Pat S, Paul R, Mike M, Stefan G; MCM daughter cardJohn A, Pat S, Paul R, Mike M; Analog Input board John A, Pat S, DFE Board Mother boardJ Olsen, Pat S, Transition boardJ Olsen, Pat S, Daughter Boards Special Testing board J Olsen, Kin Y Tracking ( & cluster finding) J Olsen, Kin Y, Stefan G, collector (octant) J Olsen, Manuel M, Juan L, Brian DB2J Olsen, Manuel M, Juan L, Brian MB Mixing Box Board Input boardJ Olsen, M Vaz, Other? Output boardJ Olsen, M Vaz, Other? Test board J Olsen, M Vaz

NIU Trigger Workshop Fred B. - Oct 22, Test program at the board level- WHERE and WHEN. AFE Board 8-MCM boardDAB3 Analog Test StandMar-Jun 12-MCM boardDAB3 Analog Test StandMay-Aug MCM daughter cardDAB3 Analog Test StandMay-Aug DFE Board Mother boardDAB3 Digital Test StandDec-Mar Transition board DAB3 Digital Test StandDec-Mar Daughter Boards Tracking ( & cluster finding) DAB3 Digital Test StandJan-Apr collector (octant) DAB3 Digital Test StandMar-Jun DB2 & others DAB3 Digital Test StandApr-Jul MB Mixing Box Board Input board DAB3 Digital Test StandJul-Aug Output board DAB3 Digital Test StandJul-Aug

NIU Trigger Workshop Fred B. - Oct 22, Board Testing  AFE > 8 MCM u bench test - AnTS u (on cassette in lab 3)  AFE > 12 MCM u bench test - AnTs u (on cassette in lab 3)  DFE u bench test - DTS  Mixing Box u bench test - DTS u The AFE lab3 requires s working cassettes s light pulser system w VTBG s Seq/SeqC/VRB/VRBC s trigger generation logic s 1553 links s PC / bit3

NIU Trigger Workshop Fred B. - Oct 22, Board Testing cont.  The DFE testing requires u input pattern generator s test patterns s tracks u output pattern analyzer u download link u 1553 link u PC / Bit3  The MB testing requires u input pattern generator s test patterns s tracks u DFE for output analysis u PC / Bit3  The AFE testing requires u input pattern generator u DFE for output analysis u download link u SASEQ u VTBG system u 1553 links u Bit3 / PC

NIU Trigger Workshop Fred B. - Oct 22, AFE Board Testing  Some AFE production boards will be lab3 stand u Test with ‘real’ inputs u Test with more realistic grounding and noise environment u Test cryo and bias supply functions  Note: [MCM are tested prior to mounting on AFE]  Bench test requires development of analog input method u Low amplitude charge injection s VTBG System s Input conversion u HD connection that can survive 200 boards s FLEX type cable s mated to VTBG

NIU Trigger Workshop Fred B. - Oct 22, DFE Board Testing  Special Test Daughter board produced u High speed “Data Pump” db generates patterns and fake event data, and checks the output of the DFE  Each of the different Daughter board types will require different test firmware/PC software  Mother board, Transition board, and daughter board sets are tested.

NIU Trigger Workshop Fred B. - Oct 22, MB Board Testing  The ‘Mixing Box Test Board’ serves as input pattern generator and output analyzer u high rate input source u provides high speed and high bandwidth lvds loopback testing  Share PC and test stand with DFE  Bench test requires u Test pattern input board u Test pattern receiver board u Test generation software u Test analysis software

NIU Trigger Workshop Fred B. - Oct 22, Test/commissioning of the sub-detector 3. Test/commissioning of the sub-detector trigger.. prior to commissioning in the D0 environment in the D0 Hall. (who, where, when?) what other resources are needed (serial links, downloads, COOR, clocks, etc.)

NIU Trigger Workshop Fred B. - Oct 22, Sub-Detector  The CTT systems test/commission in THREE stages 1 - Analog + L3 Readout 2 - Digital (trigger) DFE alone DFE + L1MUON [CFT] DFE + Collector DFE + … + L2pp & L1MTM MB + DFE 3 - Complete System [+ MB for CFT] Stage 1 and Stage 2 can be concurrent!

NIU Trigger Workshop Fred B. - Oct 22, Stage 1  Test AFE and L3 Readout chain  Test lvds links - test fixture is DFE+DB with special firmware

NIU Trigger Workshop Fred B. - Oct 22, Stage 1 - AFE  Hardware u Test Stand u Dummy Cassette u VTBG, Input Brd (pulser) u AFE Boards u Sequencer, Crate, Cont. u VRB, Crate, Cont. u DFE + daughter  Software u PC Software for control [a la MCM test software] u AFE board firmware u special DFE board based test firmware  Procedure u Download to SVX on AFE u Read SVX cal-inj patterns u Read ‘pulser’ inputs  Milestones u successful download u see all input channels in SVX data u see all input channels on DFE board with special test firmware

NIU Trigger Workshop Fred B. - Oct 22, Stage 2  Work in the trigger end of the system u Test Generator / Receiver is MB test board u Actual MB inserted before DFE for stage 2.5

NIU Trigger Workshop Fred B. - Oct 22, Stage 2 - DFE  Hardware u DFE Boards u L1 MUON cables u L1 MUON ‘test’ receiver u Test Generator / Receiver  Software u Test Generator firmware s Need Track Loader software (person) here u Download DFE u 1553 I/O to DFE u PC control and analysis  Procedure u Download to DFE crate and boards u Run Test Generator u Monitor DFE output u Monitor Collector etc. u Monitor L1 Muon  Milestones u successful download u Data seen from DFE u Data seen at L1Muon u Data seen from collector etc.

NIU Trigger Workshop Fred B. - Oct 22, Stage 3 - Final Stage  CFT/CPS Axial version with mixing box  FPS/CPS Stereo without

NIU Trigger Workshop Fred B. - Oct 22, Stage 3 - Final Stage  Hardware u Combine AnTS to DTS  Software u Same functionality as at Test Stand PCs u But now link the two  Procedure u Same as Stage 2  Milestones u See all Stage 1 and 2 milestones on the combined system

NIU Trigger Workshop Fred B. - Oct 22, Commissioning in D0. 4. Commissioning in D0. What is the sequence, time estimate for the commissioning? How will cosmic ray studies be used? What interactions with other systems are required? Give an estimated schedule for commissioning.

NIU Trigger Workshop Fred B. - Oct 22, Cosmic Ray Trigger  Trigger on CR that penetrates to center of CFT u require MUON on inward track u require track through beam pipe with CFT  Can trigger down to ~0.5GeV in tracker(?) u Trigger elements s uScintOctant s CFT A-layer-back- to-back s other CFT layers to fine-tune rate u Timing s run at s live for CFT window - 80of396ns or 20% u Tests s L3 track finding s L2 trigger s L1 trigger Similar Trigger forward with FPS & Forward Muon?

NIU Trigger Workshop Fred B. - Oct 22, ‘In Place’ Commissioning  Four Separate Systems can proceed independently  Each of the systems is commissioned in 3 Stages - u same as sub-system commissioning outlined earlier u Each stage adds more hardware u Each stage requires more software  A 4th stage - CR running - added with no special hardware  NOW Host software is ON-LINE  Can start with ‘one crate’  Can finish within one month after last crate u or about 3-4 months total time (whichever is longer)

NIU Trigger Workshop Fred B. - Oct 22, Overall Software Needs  KISS Applies u keep it simple  Have different types of users u technicians u engineers u physicists  Have different environments u Stand alone bench tests u sub-dectector u as part of full detector u possible CR running  Have different goals u test/fix/maintain individual boards u develop system expertise u test/fix/maintain full system

NIU Trigger Workshop Fred B. - Oct 22, Software cont.  Bench Tests u traditionally used PC, bit3 and windows /excel based software u need users (technicians & engineers) to be able to understand and modify software  Full system tests u want to run within full D0 system u run Examine’s and Calib’s with ON-LINE  Partial systems u gray area between bench and full system u in use / development at lab 3

NIU Trigger Workshop Fred B. - Oct 22, Infrastructure Required  Bench Tests u PC u Trigger / clock generator u Input generator u Output capture u Group will provide s software / firmware s test fixtures s procedures u Need - s Physicists for system design / data analysis s PC based software help

NIU Trigger Workshop Fred B. - Oct 22, Infrastructure Required * Need new bodies for these outside of present group  Full system tests u trigger generation u SCL (clock and control) u DAQ u Online u Group will provide s special trigger generator hardware s test fixtures u D0 provides s online system and software s examine and calib shells u Need* s MC Track generation software s MC Cluster generation software s (for CR) found-tracks to survey to new trigger-equations s Examine & calib software s help with special firmware

NIU Trigger Workshop Fred B. - Oct 22, Summary  Hardware will arrive relatively late  Much work between production of hardware and running  A lot of support and fixture hardware needs to be designed and built - Schedules will suffer without needed EE support.  A lot of support software needs to be written, and shaken out - Schedules will suffer without needed PH support.