Mark Reichanadter LCLS FAC Apr7-8, 2005 LCLS Facilities Advisory Committee LCLS Organization & Executive Status M. Reichanadter.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
M. Reichanadter, SLACLCLS FAC Meeting - April 29, 2004 LCLS Organization & Execution M. Reichanadter LCLS FAC Meeting April 29, 2004 LCLS.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science OECM Limited-External Independent.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Michael Scharfenstein FAC October LCLS Environment, Safety & Health Michael Scharfenstein ES&H Coordinator.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Mark Reichanadter LCLS FAC April 16-17, 2007 Report to the LCLS Facilities Advisory Committee LCLS Project Management M.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
Mark Reichanadter LCLS FAC Oct12-13, 2004 Meeting of the LCLS Facilities Advisory Committee LCLS Organization & Execution.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
David McGiven FAC: Construction Management Procurement October 2006 Facility Advisory Committee (FAC) Construction Management.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Trish Mast External Independent October 9, 2007 Linac Coherent Light Source (LCLS) The Rebaseline Process Trish Mast October.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
DOE Review of LARP – Feb 17-18, 2014 DOE Critical Decision Process Ruben Carcagno February 17,
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Management W. J. Foyt
Meeting of the LCLS Facilities Advisory Committee
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
DOE Mini-Review of the LCLS Project
LCLS Project Management
X-Ray Endstations Update
Details supporting the increase
DOE Review of the LCLS Project
Project Management Issues John N. Galayda, SLAC April 24, 2002
DOE Review of the LCLS Project
Integrated Safety and Environmental Management
Linac Coherent Light Source (LCLS)
DOE Review of the LCLS Project
DOE Review of the LCLS Project
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
DOE Mini-Review of the LCLS Project
DOE Review of the LCLS Project
CF Scope, Management & Organization
DOE Status Meeting of the LCLS Project
LCLS Instrument MIE Project: Staffing, Schedule
Presentation transcript:

Mark Reichanadter LCLS FAC Apr7-8, 2005 LCLS Facilities Advisory Committee LCLS Organization & Executive Status M. Reichanadter / SLAC

Mark Reichanadter LCLS FAC Apr7-8, Outline Status of the LCLS Project Cost, Schedule and Resources LCLS Organization & Staffing Long-Lead Procurements Preparation for Construction Response to Oct04 FAC recommendations Plans for the next six months

Mark Reichanadter LCLS FAC Apr7-8, 2005 LCLS Project Status – 1 LCLS Critical Decision Status; CD-0 Approve Mission Need – Complete (Jun01) CD-1 Approve Preliminary Baseline Range – Complete (Oct02) CD-2A Approve Long-Lead Procurement Budget – Complete (Jul04) CD-2B Approve Performance Baseline – ESAAB Scheduled for April 8 Continue to work with BREI & OECM for baseline validation CD-3A Approve Start of Long-Lead Procurements – Complete (Dec04) CD-3B Approve Start of Construction – Scheduled (Nov05) CD-4 Approve Start of Operations – Scheduled (Mar09) LCLS Major Upcoming Start/Completion Dates; Start of LCLS Construction Start– Mar06 Injector Laser Commissioning Start– Jun06 Injector E-Beam Commissioning Start– Apr07 Linac-to-Undulator Commissioning Start – Mar08 “First Light” (E-Beam through Undulator) Start – May08 LCLS Major Upcoming Project Reviews FAC – Apr 7-8, 2005 DOE “Lehman” Review – May 10-12, 2005 Full Technical, Cost, Schedule and Management Review Includes conceptual review of the LCLS Instruments (MIE) and LCLS Operations DOE “Lehman” Review – Nov, 2005 CD-3B – Assess readiness for start of construction

Mark Reichanadter LCLS FAC Apr7-8, 2005 LCLS Project Status – 2 LCLS is in the Design/Procure/Construct phase. Design (Staffing up Mgmt & PED, Technical Specs, A/E 100% Title I, Kick- Off Title II) Procure (Long-Lead Procurements) Prep for Construction (CM/GC RFP, Construction Safety Plan, ISMS) Safety First! Then think about schedule, technical and cost issues. The LCLS P3 resource-loaded database is the approved scope, cost and schedule. LCLS performance and progress is based on the resource-loaded schedule. Changes to the “plan” are approved through change control. Earned-Value measured against resource-loaded schedule. FY05 funding arrived in Jan05 Will have carryover in FY06 Advance the design (PED), particularly in Injector and Undulator Injector, Linac, Undulator & CF LLP’s Title 2 Design, CM/GC procurement Emphasis on meeting schedules/milestones … cost will follow closely. Safety First! Then think about schedule, technical and cost issues.

Mark Reichanadter LCLS FAC Apr7-8, LCLS BA, C+Comm & BCWS FY06 is aggressive to stay to the schedule (Injector, Linac, Undulator, & CF all ramping up) Note; FY07 “Swing” work can be advanced if we have good cost and schedule performance

Mark Reichanadter LCLS FAC Apr7-8, LCLS Total Project Cost (Feb05) LCLS Cost & Schedule Estimate $315M TEC $379M TPC CD-4 Mar Major emphasis/yr FY05 -LLP’s, Staffing, PED, T2 & CM/GC FY06 -Inj, Lin, Und Proc’s & Mock-Up, T3 FY07 -Inj Comm, Linac, Und Assemblies XTOD/XES Proc, 2-D Det, T3 FY08 -T3 BO’s, XTOD/XES Proc, May08 First Light FY09 -CD-4 Mar09

Mark Reichanadter LCLS FAC Apr7-8, LCLS Cost Performance Report – Feb05

Mark Reichanadter LCLS FAC Apr7-8, LCLS Summary Schedule – Mar05 Highlights Schedule Float 213 days (10.5 mos.) ~23% cont wrt CD-4 Critical Path Und B.O. - Und Inst to 1 st Light FY05 Shutdown ~1 month FY06 shutdown ~ 4 months FFTB Shutdown Jul06 LCLS may request advancing this date

Mark Reichanadter LCLS FAC Apr7-8, LCLS L1 and L2 Milestones 7 L1 Milestones tracked by DOE- SC1 27 L2 Milestones tracked by DOE- SSO 132 L3 Milestones tracked by LCLS Project Office L1-L2-L3 under change control Add'l L4’s tracked by System Managers

Mark Reichanadter LCLS FAC Apr7-8, LCLS Project Organization (Mar05) Increase senior level expertise Accel Team Ldr. Construction & ES&H Safety Professionals Dedicated Procurement Group E-Beam and X- Ray Systems Managers add a layer between WBS Managers and Project Office (better integration) Laser Group Manager to provide expertise to entire project

Mark Reichanadter LCLS FAC Apr7-8, LCLS Peoplepower / System / Lab LCLS resource usage is derived from resource- loaded schedule. SLAC -Controls-MOU -RF-MOU -Engr-Improving PO Staff-need senior-level and construction mgmt Laser-need to recruit talent *FY2009 annualized rate

Mark Reichanadter LCLS FAC Apr7-8, Actual Reported SLAC FTE’s (Feb05) Does not include additional staff under contract –Jacobs –PMCS – AIM –Consultants Dalesio Desaulniers –CM/GC (6/05) FY05 SLAC Treading water. Year-long CR or full- funding? Award Title I

Mark Reichanadter LCLS FAC Apr7-8, FY05 Matrix Support ESD-LCLS & RF-LCLS MOU’s LCLS Controls and RF Managers are members of LCLS Division and co-located in B280. ESD matrix ~7.0 FTE’s in FY05 to LCLS. LCLS still plans 2 EE hires. KD matrix ~3.0 FTE’s in FY05 to LCLS + mfg & RF Gun Support. CEH MOU (TBD) Accel Dept (TBD)

Mark Reichanadter LCLS FAC Apr7-8, LCLS SLAC MMF-4,000sf facility used to tune, measure and store undulator magnets S20-2,160sf facility Laser & Control Rm B280 A&B 2 floors ~13,000sf B750 LCLS temporary staging/storage, permanent lab, testing and machine shop space. Share with other users, LSS?, EXO? Remove Mark II Detector?

Mark Reichanadter LCLS FAC Apr7-8, LCLS Procured Materials and Services LCLS uses decentralized three procurement groups at ANL, LLNL and SLAC ANL-LCLS Proc Mgr – J. Ingraffia LLNL-LCLS Proc Mgr – G. Otani SLAC-LCLS Proc Mgr- Dave McGiven SLAC-LCLS Procurement Cell manages LCLS procurements and coordinates closely with SLAC Purchasing for less critical or commodity purchases LCLS Technical Leads B. Freeman V. Villanueva LCLS CF Lead B. Patten

Mark Reichanadter LCLS FAC Apr7-8, LCLS Long-Lead Procurements All LLP’s have been reviewed during LCLS TDR’s. Laser system includes a large number of small procurements + system integration. Laser and Conv Fac are most critical to maintaining schedule. Sufficient time is built into the LCLS schedule to provide for the procurement process. APP’s start the procurement process. Contingency on LLP ~31%

Mark Reichanadter LCLS FAC Apr7-8, Preparations for Construction Safety LCLS ISMS established, add ES&H staff to PO ES&H – M. Scharfenstein Construction ES&H – R. Hislop Working with SLAC ES&H and SOC on approval and review processes. Establish LCLS Construction Safety Plan S20 and MMF construction to provide good feedback on processes and policies prior to main construction effort. CM/GC RFP going through DOE approval process Largest procurement for LCLS (~60M) Evaluation and Advisory Boards are established Start construction March 2006!

Mark Reichanadter LCLS FAC Apr7-8, LCLS Response to Recommendations Oct04 FAC Steep ramp-up of staff in light of FY05 CR is not feasible. Exploit Continuing Resolution by replanning work. LCLS replanned its effort assuming a CR through Dec04 with full-funding in Jan05, which is what occurred. LCLS has effectively staffed up when funding became available.

Mark Reichanadter LCLS FAC Apr7-8, LCLS Response to Recommendations Oct04 FAC Update the Risk Registry monthly. The Risk Registry is updated monthly and a dedicated Risk Management meeting is held each month. AC Conductivity was placed on the Risk Registry but is now considered a low risk. A FY06 CR is a serious risk to the project. Under a CR; 1/12 of PED (~$2.5M), 1/12 LLP ($0), 1/12 of OPC (~$3.5M) or ~$500K/mo. Ave 1-Q 06 ‘burn rate’ is ~$5.5M/mo. Two plusses; Late FY05 funding, LCLS predicts a BA carryover ( ~$13M). Actual construction start is planned for Mar06 (3Q-06). Mitigation strategy; Pull back on technical system procurements, hold CDG together. Most likely impact; >1Q CR will delay schedule (reduced float, increase cost) Looking to push non-critical path work from FY05 to FY06 Continue to work with DOE SSO and BES on additional mitigation plans.

Mark Reichanadter LCLS FAC Apr7-8, LCLS Response to Recommendations Oct04 FAC Global integration needs more attention/resources. LCLS has added substantial resources to integration; Added Integration/Installation Mgr (R.M. Boyce) Added Accelerator Team Leader (P. Emma) Added E-Beam System Mgr (TBD ~2 weeks) Added Photon Beam System Mgr (J. Arthur) 2 Undulator Project Engineers G. Pile – ANL, B. Youngman - SLAC Added QA Mgr (TBD ~1week), D-Dbase Mgr (TBD) Continue to push on specs (PRD, ESD, ICD, RDS)

Mark Reichanadter LCLS FAC Apr7-8, LCLS Technical Specifications Technical baseline specifications are defined. Documents are added/ revised as the design evolves. Technical specs under configuration mgmt.

Mark Reichanadter LCLS FAC Apr7-8, LCLS is under Configuration Control Management Control LCLS Project Management Plan with Appendices LCLS Advance Procurement Mgmt Plan LCLS Quality Implementation Plan LCLS Risk Management Plan with Risk Registry Appendix Technical Control of Scope Technical Specifications Documents GRD, PRDs, ESDs, RDSs, ICDs WBS Dictionary Cost/Schedule/Resource Control LCLS P3 Cost & Schedule Database With Baseline Change Requests LCLS L1-L2-L3 Milestones & Dictionary All LCLS Project documentation can be found on the LCLS website

Mark Reichanadter LCLS FAC Apr7-8, Plans for the Next Six Months Baseline LCLS (Cd-2b) Complete staffing and co-location of Central Design Group at 3 labs. Continue to push ISMS into LCLS work processes. Continue to work enhance integration effort and processes. Complete awarding of Long-Lead Procurements Laser, Injector components, Undulator Materials, S20 and MMF) Complete Title II on schedule (Nov30) Award CM/GC (Jun30) Maximize overlap between A/E T2 and CM effort. CD-3b (Approve Construction Start) Make plans flexible for full FY06 funding (~$89M) or CR?