Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.

Slides:



Advertisements
Similar presentations
Contractor Safety Management
Advertisements

SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Information about system status Piquet backup call Supervision of fire alarm systems Control room backup Computer support for HCI’s/terminals Confirmation.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Swets Information Services SwetsWise Title Bank 13 th Panhellenic Libraries Conference th October Corfu.
Quality Assurance/Quality Control Policy
Inventory system.
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
1 AMMW2013 workshop 13 d – 15 th of November, 2013 Asset management tools: use and improvement in SOLEIL – P. Betinelli Asset management tools: use and.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
2015 HM section activity Helder Lourenço. E119/EN Maintenance Contract Maintenance services on industrial trucks on the CERN site 1700 assets (CH,CS,LV,RTL,RTH,RH,TP,DS)
ShopKeeper was designed from the ground up to manage your entire fleet maintenance operations … from 1 user to 100, including full security features that.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
6th ST workshop, Thoiry, 1-3 April ST-HM Design Section Strategy and working methods 3rd April 2003 C. Bertone ST-HM.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Service.
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
BUDGET 2012 EN-HE 29/03/ EN-HE CONTRACT LIST - OPERATION7’190 KCHF - PROJECT1’738 KCHF - CONSOLIDATION 4’239 KCHF JMS.
Introduction What is this act? The LOLER regulations came into force and was applied to all equipment used in Lifting Operations. For example with engineering,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Introduction.
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
Nature of workgroup(s) involvedconsequences if not done consolidate beam dumpEN/STIcontinue running with obsolete dump, and without spare upgrade beam.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Traffic Management Rok Safety Seminar The statistics Why do accidents occur What is workplace transport The problems Possible solutions Worked examples.
CMMS Software CMMS Software
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Handling Engineering Group
TOPIC: THE VALUE OF BIOMEDICAL ENGINEERS AND TECHNICIANS IN HOSPITAL PRESANTED BY: KWIZERA ABRAHAM STUDENT IN: BMET /FINALIST STU INSTITUTION: IPRC KIGALI.
Asset & Maintenance EN-HE group
Catherine Toozer HM Inspector of Health and Safety HSE, Carmarthen
EN-Handling Engineering Group
EN-HE group meeting
Software Quality Assurance Software Quality Factor
Safety in Construction and Upgrade Phases
EN-HE Group meeting 4th December 2015
APARTMENT MAINTENANCE SYSTEM
EN-HE SPS works during EYETS
Industrial trucks Cern fleet Family list
Software Documentation
Latest standardisation measures for lifts
SAFETY MEETING THE SAFETY OF YOUR DOOR STARTS WITH YOU. ABESDOOR.CA
Material Handling Material Handling –
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
CDE Transportation Unit
Infor EAM in the Handling Engineering Group at CERN
AVAILABILITY PERFORMANCE
Workshop: Equipment June 29, 2006.
Presentation transcript:

Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN

Content Overview 2 Presentation (10 min.)  Introduction Mandate  Overview Equipment Inventory  Activities – Technical Mandate ( )  Tasks + Responsibilities – Safety Mandate as Equipment Responsible 29/03/2012O. Böttcher – EN-HE-HM

EN-HE-HM Mandate 3 EN-HE-HM section is entitled as equipment responsible for Transport and Handling Equipment at CERN and therefore mandated to assure …  …the technical availability of transport and handling equipment (procure new and maintain existing equipment)  … safe use and operation (administrative equipment management).  This presentation is to review 2011 activity related to this mandate and to inform about 2012 and 2013 activities. 29/03/2012O. Böttcher – EN-HE-HM

HM Structure (without changes since ) 429/03/2012O. Böttcher – EN-HE-HM

HM Lifting Equipment 529/03/2012O. Böttcher – EN-HE-HM TOTAL : 345 Overhead travelling cranes Hoists Lifting beams (Value 82M€)

HM Industrial Trucks 629/03/2012O. Böttcher – EN-HE-HM  30 ICE Powered forklift trucks  150 Electrical elevators  100 Access and working platforms  1000 Manual handling equipment  60 Special magnet transport vehicles  180 Electrical tractors TOTAL : 1500 equipment (Value 25M€)

EN-HE-HM Mandate 7 EN-HE-HM section is entitled as equipment responsible for Transport and Handling Equipment at CERN and therefore mandated to assure …  …the technical availability of transport and handling equipment (procure new and maintain existing equipment)  … safe use and operation (administrative equipment management).  This presentation is to review 2011 activity related to this mandate and to inform about 2012 and 2013 activities. 29/03/2012O. Böttcher – EN-HE-HM

Technical Mandate 8  The following activities are related to the technical mandate: 29/03/2012O. Böttcher – EN-HE-HM Procurement Add. Services Periodic Safety Inspections Life cycle relaunch / Modifications Maintenance Interventions Prev. / Correct. Commissioning EQUIPMENT LIVE CYCLE MANAGEMENT PURCHASING Integration Decommissioning

Technical Mandate 9  In 2011 HM decommissioned 49 and commissioned 38 new equipment (purchase value 1.5 MCHF) 29/03/2012O. Böttcher – EN-HE-HM Procurement Add. Services Periodic Safety Inspections Life cycle relaunch / Modifications Maintenance Interventions Prev. / Correct. Commissioning EQUIPMENT LIVE CYCLE MANAGEMENT PURCHASING Integration Decommissioning Conclusion Equipment HM 2011Quantity Reduced 2011 New 2011 Cost 2011 (kCHF) Cranes (PR) Hoists (PA) - no exact data Lifting beams (R) - no exact data Fork lift truck and other (CH) Lifting platforms (LV) Heavy pulling tractors (RTH) Light pulling tractors (RTL ) Special Vehicles (CH + LV)50000 TOTAL

Technical Mandate 10  About 2.6 MCHF were spend by HM for maintaining the equipment park in 2011(maintenance + consolidation measures) 29/03/2012O. Böttcher – EN-HE-HM Procurement Add. Services Periodic Safety Inspections Life cycle relaunch / Modifications Maintenance Interventions Prev. / Correct. Commissioning EQUIPMENT LIVE CYCLE MANAGEMENT PURCHASING Integration Decommissioning Activity Overview 2011 Life Cycle Management Assist to Safety Inspections (PSI) Preventive maintenance (PRV) Breakdown service (CD) Small and major repairs (CR) Modification / Adaptation (CA) Additional services to users (T1) Service Contracts E097 + E098 3’000 Interventions (ø13 /day) 20’000 hours (ø12 FTE /day) 1.6 MCHF (Manpower+ Parts) Ordering via EDH 105 DAIs – 1.0 MCHF

Technical Mandate 11  In 2012 maintenance and consolidation activities will continue. For better planning a planning tool was put in place! 29/03/2012O. Böttcher – EN-HE-HM

Technical Mandate 12  In 2012 maintenance and consolidation activities will continue. For better planning a planning tool was put in place! 29/03/2012O. Böttcher – EN-HE-HM

EN-HE-HM Mandate 13 EN-HE-HM section is entitled as equipment responsible for Transport and Handling Equipment at CERN and therefore mandated to assure …  …the technical availability of transport and handling equipment (procure new and maintain existing equipment)  … safe use and operation (administrative equipment management).  This presentation is to review 2011 activity related to this mandate and to inform about 2012 and 2013 activities. 29/03/2012O. Böttcher – EN-HE-HM

HM Safety Mandate 14  Change of Safety Policy at CERN in /03/2012O. Böttcher – EN-HE-HM

HM Safety Mandate 1529/03/2012O. Böttcher – EN-HE-HM

1629/03/2012O. Böttcher – EN-HE-HM HM Safety Mandate  Safety Inspections are part of the entire Equipment Life Cycle Management.  CERN organized this service independant from the Equipment Responsibility  Problematic for managing Safe Use and Operation! Safety Commission prior to first use Safety Commission of certain repairs Safety Commission of modifications Procurement Add. Services Periodic Safety Inspections Life cycle relaunch / Modifications Maintenance Interventions Prev. / Correct. Commissioning EQUIPMENT LIVE CYCLE MANAGEMENT PURCHASING Integration Decommissioning

HM Safety Mandate 1729/03/2012O. Böttcher – EN-HE-HM Overview Management tasks Use authorizations to operators other than EN-HE-HH (EDH AC-PE) Validation for use as access means (lamp + hall maintenance) Documentation management (Safety file, intervention history, maintenance and user instructions, certificates) Database management Conformity management (>200 cranes not CE) Conclusion: These tasks require clarification and support by IT to be performed correctly and with the given resources!  Other HM tasks related to Equipment Responsibility and Safe Operation.

HM Initiatives 1829/03/2012O. Böttcher – EN-HE-HM  In order to improve the equipment management a lot of things are ongoing:  Chloé Cornu:  Process description (BPMN) for Use authorization via EDH  Process mapping of HM regular tasks  Damien Lafarge:  Process description (BPMN) of technical maintenance processes  CMMS (GMAO) improvements: reporting …  JM. Chevalley / O. Boettcher / I. Ruehl:  Interface and collaboration with DGS-SEE  ….  Thanks to all people supporting these initiatives!

Thanks to Transport!!! 19  You contribute incredible support to the HM Section!!!!!  Thank you very much !!!!!! 29/03/2012O. Böttcher – EN-HE-HM

Thanks for listening! Thanks for comments and questions! Oliver Böttcher (CERN EN-HE-HM)