STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 A brief overview of the ATLAS Pixel Detector.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
The ATLAS Pixel Detector
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
The MAD chip: 4 channel preamplifier + discriminator.
The ATLAS Pixel Detector - Introduction -
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
SOIPD Status e prospective for 2012 The SOImager2 is a monolithic pixel sensor produced by OKI in the 0.20 µm Fully Depleted- Silicon On Insulator (FD-SOI)
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
November 3-8, 2002D. Bortoletto - Vertex Silicon Sensors for CMS Daniela Bortoletto Purdue University Grad students: Kim Giolo, Amit Roy, Seunghee.
ATLAS SCT module performance: beam test results José E. García.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
The ATLAS Pixel Detector - Running Experience – Markus Keil – University of Geneva on behalf of the ATLAS Collaboration Vertex 2009 Putten, Netherlands,
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
P i x e l C a r m e l Sept. 9, 2002M. Garcia-Sciveres - The ATLAS Pixel Detector1 The ATLAS Pixel Detector Pixel 2002 Workshop M. Garcia-Sciveres.
The ATLAS SemiConductor Tracker Abstract The ATLAS SemiConductor Tracker (SCT) is presented. About silicon micro-strip sensors with a total active.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Michał Dwużnik, for the SCT collaboration
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Technology Overview or Challenges of Future High Energy Particle Detection Tomasz Hemperek
Overview and Status of the ATLAS Pixel Detector Claudia Gemme, CERN/INFN-Genova on behalf of the ATLAS Pixel Community 10th ICATPP Conference, Como, Oct.
p-on-n Strip Detectors: ATLAS & CMS
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
The ATLAS Pixel Detector: Overview and Status Sven Vahsen, LBNL for the ATLAS Pixel collaboration DPF 2006 Meeting, Honolulu, Hawaii October 30, 2006.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
LHCb Vertex Detector and Beetle Chip
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
The LHCb Vertex Locator Lars Eklund LHCb VELO Group of the LHCb Collaboration CERN (Geneva), EPFL (Lausanne), NIKHEF (Amsterdam), University of Glasgow,
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
The Silicon Pixel Detector (SPD) is part of the Inner Tracking System (ITS) of the ALICE experiment. ALICE is designed to study the properties of strongly.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Leonardo Rossi – EB 68 – Oct 5, Pixel status and schedule Rad-hard electronics (has always been) on the critical path for the construction of the.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
DPF2000 ATLAS Pixel Detector M. G. D. Gilchriese Lawrence Berkeley National Laboratory August 2000.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Overview and Status ATLAS Pixel Detector
LHC1 & COOP September 1995 Report
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Overview and status of the ATLAS Pixel Detector Attilio Andreazza Università di Milano and I.N.F.N. for the ATLAS Pixel Collaboration Layout of the ATLAS.
BESIII EMC electronics
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Operational Experience with the ATLAS Pixel Detector at the LHC
(On Behalf of CMS Muon Group)
Presentation transcript:

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 A brief overview of the ATLAS Pixel Detector

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Overview It will (try) to give a brief overview over the layout, components and status of the Atlas Pixel system –Layout –Modules –Sensors and chip –Staves –Support structure and integration Many thanks to the ATLAS Pixel Community for providing the information presented here –The Atlas Pixel Detector Project is a collaboration of 23 institutes In particular Chiara Meroni / INFN Milano and Kevin Einsweiler / LBL

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 The ATLAS Inner Detector

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 The ATLAS Pixel Detector Radiation hardness: –NIEL > MeV n eq /cm 2 –500 kGy Operates inside the 2T field Cooled by C3F8 evaporative system. Environmental temperature kept below 0C. ~1.3 m ~380 mm Vertex detector to provide 3 space points –R  resolution ~ 13  m –Pixel size 50x400  m based on 3 barrel layers (innermost is at R=5.1cm) + 2 endcaps with 3 layers each Coverage is up to |  |<2.5

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Layout Barrel layers build out of 112 staves (1456 modules) and EC out of disks (288 EC module total) Total of 1.8m2 and 80 MPixel Operates at 2V with ~3500A supplied to FE

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 The module 16 FE chips HV connection Module Controller Chip Sensor Flex hybrid Pigtail Self-contained unit controlled by a Module Controller Chip, which also performs the event building. All communications use low voltage differential signal on micro-cables before being converted in optical signals at the end of the whole pixel detector active area, Opto Board. It consists of a silicon sensor read- out by 16 front-end (FE) chips connected via bump bonding 46k channels / module

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 The Sensors Sensors are required to (also) operate under-depleted (max. operating bias 600V). Use oxygenated n-in-n sensors with pixel insulated by a moderate p-spray implant A bias grid is used to keep pixel at equipotential during sensor testing (thickness = 280  m) Implemented ganged pixels to avoid dead areas between chips Production finished at CiS/Germany and ON Semiconductor (TESLA), Czech Republic.

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 The rad-hard FE readout The front-electronics chip, FE-I3, is built in 0.25  m IBM technology: Each chip reads out 2880 pixels (7.4x11mm die). Each pixel cell consists of a fast preamplifier followed by a discriminator sparse readout and store hits in EndOfColumn buffers until the level 1 trigger is received Threshold can be adjusted by a 7-bit tuning DAC in each channel. 8-bit pulse height information is obtained by the Time-over- Threshold technique. ToT uniformity is obtained by a 3-bit tuning DAC On wafer testing measured yield is 81% Production finished ( >45000 chip) For a module noise is typically : –150 e for standard pixels –270 e for ganged pixels After irradiation, it is ~ 250 e (increased leakage current)

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Bump bonding IZM – PbSn AMS - In Two techniques, from different manufacturers have been used for production modules: –In bumps by Selex (ex Alenia-Marconi Systems), Rome –PbSn bumps by Fraunhofer-Institut für Zuverlässigkeit und Mikrointegration, Berlin Bumping defects can be investigated by X-ray inspections, or electrical tests, and now are very rare: the production contract fixes a rejection ratio of 150 faulty bumps/modules (0.3%).

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Some testbeam results Module tested in PS before and after irradiation –efficiency (TDR requirement >97%) : >99.9% before irradiation 97.8% after irradiation already fully depleted) –signal after irradiation ~15k –resolution (TDR requirement < 13  m) : 7.5  m at 10° incidence before irradiation, 9.7  m at 15° incidence after irradiation, Modules also tested with LHC-like particle flux –Check readout achitecture –Verify that efficiency is ok at LHC-like occupancy In-time efficiency as function of Time -> plateau of 10ns width

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Production testing Module performance is tested using internal calibration circuit Measure threshold and noise by injecting 200 different values ToT for 1 pixel

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Module Production Module production is almost finished: need is 1744 modules Production yield is ~ 93% Modules are ranked to install the best on the B-layer and disk1, ranking =60  0.1% of dead pixel Status as of May 2006

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Integration of the Pixel Detector Sequence of integration –Modules, after tests, are glued on CC support ladder which includes cooling pipe (13/stave) –Staves are cabled and retested –2 staves are inter connected with cooling pipe and mounted on support half shells –Support half-shells and then surveyed and service panels installed which include the opto-boards and all services to the end of the pixel detector package –Halfshells integrated around beam pipe in cleanroom on the surface (ATLAS SR1) and installed in a single support tube. –The complete Pixel detector with beam pipe is brought to the pit and installed as the last part the Inner Detector

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Structure ~7m structure (all in CF, CC composite) with halfshells place in global support structure

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 The Endcaps Sector assembly (1/8 of a disk): 6 modules are mounted on carbon-carbon plates, sandwiching the cooling pipe. All 6 disks have been assembled in LBL and ENDCAP C is now at CERN Will be used for a first commissioning of the Pixel Detector using a cosmic setup in SR1

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 The Barrels Stave consists of 13 modules on CF ladder which includes the Al cooling pipe The barrel frame, made of carbon fiber laminate will hold the staves L2 Layer L1 Layer B Layer Most staves at CERN now and are currently being cabled and made to bi-staves

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Staves in halfshells Started with integration of bi-staves on halfshells (main activity during and after summer)

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Summary Production of modules finished now and tests show that they perform as required All pixel disks and most staves produced by ow Focus is now on integration of staves to halfshells and halfshells together In parallel a lot of emphasis is given to service installation and integration of off-detector systems (DAQ, DCS, PS, cooling) Plan to install pixel system in ATLAS in March 2007 ready for commissioning with the ID and ATLAS A 3 hit Pixel Detector is on its way to record LHC events in ATLAS

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Backup slides

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Rad-hard sensors External pixel layers will receive a yearly damage from NIEL corresponding to a fluence of n eq /cm 2 B-layer at R=5.5 cm will be a factor two more. Initial specification were: –external layers must withstand 10 years of operation at the LHC –B-layer must withstand at least 5 years of operation That means: –NIEL >10 15 n eq /cm 2 –dose > 500 kGy Oxygenated FZ silicon was chosen because of improved hardness to charge particle irradiation.

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Module Controller (MCC) and hybrid Validated SEU resistance : –all critical registers are tripled and use a majority decision logic; –in the FIFO’s, where data are stored, a bit-flip safe encoding is used to unambiguously disentangle hits (for which a small corruption rate is acceptable) from event separators (whose loss would cause DAQ misalignment) At the PS irradiation facilities MCC were run for the equivalent of s at the B- layer, without the need to reconfigure the chip. No. of transistors: 880 k Dimensions: 6840 x 5140  m 2  The MCC and decoupling capacitors, temperature sensors and resistors needed by the LVDS buffers, are mounted on flex hybrids (Dyconex, CH) which are glued on the backside of the sensors  Shown is the support card used for module charactherization.

STAR coll. Meeting/ MIT, H.Pernegger7/10/2006 Problem during stave production found After 30% of stave production, significant leaks found in the end regions of some staves initiated a deep investigation. Leaks and corrosion were found even in the middle of some stave. The origin was in the brazing of the cooling fitting followed by not accurate enough QC procedure Strategy to recover was following a triple path: –Insertion of a new pipe in the already loaded stave to restore integrity, after cleaning and passivating the existing corroding pipe. –Repair: replace the present cooling pipe with a new pipe, via a controlled delamination of carbon-carbon structure and a subsequent re-assembly. –New Staves: to compensate for the losses –All need new cooling tubes and fitting After a very dedicated effort, the stave production resumed –Full support from ATLAS that modified the schedule to delay the Pixel insertion to the very last moment (03/07)