Northstowe Phase 1 Infrastructure Works Construction Phasing
Established 1952 Based in Ipswich 7 regional offices 300 employees £70m turnover Introduction to Jackson
Regional office – Huntingdon Head office - Ipswich Support services Environment Health & Safety Quality Procurement Planning Locally based workforce
Over 35 contracts completed in Cambs since 2004
Addenbrookes Access Road
Cambridge Guided Busway
Bar Hill Roundabout
Huntingdon West of Town Centre Link Road
Site Access Overview
Site Compound Location
Compound Layout
some localised temporary diversions and temporary surfacing will be required
Only in operation 0930 to 1530 (Mon-Fri), occasionally Saturday 0800 to 1300
or temporary lighting as required
Proposed B1050 Reconstruction Works
Overall Northstowe Phase 1 Layout
Key points JCE long experience with local, similar schemes. Safe pair of hands Minimised impact of deliveries through recycling material, primary road access when possible, restricted access/egress using bypass. Maintain safe cycleway/footway at all times.