ENERGY STAR for Residential Light Fixtures Durability Implementation June 23, 2003.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Advertisements

NINTH GRADE SUCCESS INITIATIVE. Program Goals l Increase graduation rates by: Reducing disproportionately large percentage of students who are retained.
ICCA Board Webinar Meeting July 14, Agenda 1.Update on India and Argentina 2.Update on ICCA and CPAg discussions 3.ANSI ISO accreditation 4.ICCA.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Proposed Rule: Amendments to the Protocol Gas Verification Program and Minimum Competency Requirements for Air Emission Testing Presented at May 12,
CFL ENERGY EFFICIENCY LABELLING/ PUBLIC PROCUREMENT Presented at the workshop on “energy efficient procurement” Mumbai, September 20, 2005.
High-Quality Supplemental Educational Services And After-School Partnerships Demonstration Program (CFDA Number: ) CLOSING DATE: August 12, 2008.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
An Overview of the Local Control and Accountability Plan (LCAP) January 25, 2014 FREMONT UNIFIED SCHOOL DISTRICT Educate Challenge Inspire.
FIRM TRANSPORTATION GAS SUPPLIER PRESENTATIONS CUSTOMER INFORMATION LIST.
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
Independent Evaluator Chesapeake Bay Partner’s Response to the National Research Council’s Report Management Board, November 1, 2011 ~ 9-11 AM.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Specification Discussion
Application Amendments and Budget Transfers (Part 2) Virginia Department of Education Office of Program Administration and Accountability Title I University,
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Transposition of GTR No.13 “Hydrogen and fuel cell vehicles” into UN Regulation - Explanatory material - 20/September/2013 The European Commission and.
TRANSITION PLAN STAKEHOLDER GROUP CENTER FOR DEAF AND HARD OF HEARING EDUCATION.
Primacy Revision Application The Arsenic Rule. Major Points Components of Primacy Revision Application Attorney General’s Statement Special Primacy Requirements.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Residential Integral LED Bulbs Part II presented to the Regional Technical Forum John Wilson,
SPP.org 1. EMS Users Group – CIP Standards The Compliance Audits Are Coming… Are You Ready?
Patient Protection and Affordable Care Act March 23, 2010.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Review of the Operational Policies and Guidelines: key issues from a civil society perspective Sven Harmeling, Germanwatch Held.
E NERGY S TAR ® Refrigerated Beverage Vending Machine Industry Meeting Rachel Schmeltz, US EPA Georgia World Congress Center October 22, 2002.
NCES Education Institution Handbook Jinhee Lee, Council of Chief State School Officers Barbara Clements, Evaluation Software Publishing.
INTD 51 the functions of illumination lighting can be a tremendous force in architectural, interior, and landscape design.
ENERGY STAR Criteria for Clothes Washers Overview of ENERGY STAR Criteria Setting Process and History of Clothes Washer Criteria Richard H. Karney, P.E.
Best Available Retrofit Technology Rule - Colorado David R. Ouimette Colorado Air Pollution Control Division.
Application Amendments and Budget Transfers (Part 1) Virginia Department of Education Office of Program Administration and Accountability Title I University,
1 June 11, 2013 Board Meeting Child Care Development Fund Massachusetts State Plan Federal Fiscal Years 2014 and 2015.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Congratulations! It’s a Burn Dump. What Do You Do Now? LEA/CIWMB PARTNERSHIP CONFERENCE Anaheim, California May , 2005 California Environmental.
Local Assessment of Code of Conduct Complaints. Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due to.
Title V, Preliminary Completeness Review. What do I need to do?  I need to find out if the application contains the required information.  Initial Title.
Task Force on Emission Inventories and Projections Emission inventory adjustments – an update TFEIP co-chairs: Chris Dore, Martin Adams and Kristina Saarinen.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 September 2013 Financial Unit.
Reporting and payment claims Black Sea Basin ENPI CBC Programme Training for Grant Beneficiaries and Partners Bucharest 18 June 2014 Financial Unit.
Update: AUL Guidance Revisions Summary of Comments June 23, 2011 Peggy Shaw Workgroup Chair.
Ceiling Fan Testing Facility Guidance Manual Rebecca Miller ICF Consulting E NERGY S TAR ® for Ceiling Fans
Applying for Treatment in the Same Manner as a State for Sections of the Clean Air Act National Tribal Forum May 12, 2014.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Execute Tailored Procedures (XTP) Status POIWG – July 2015 Lamar Stacy.
Hexavalent Chromium MCL Regulation Guidance Eric Zuniga, PE San Bernardino District SWRCB – DDW.
Weather-Sensitive ERS Pilot Project Proposal March 7, 2013 TAC Meeting.
Clean Power Plan Kyra Moore Director, Air Pollution Control Program Prepared for: Midwest Energy Policy Conference October 6, 2015.
1 Office of Procurement Presents Request for Proposal (RFP) Process.
Water Quality Standards Regulation (9 VAC ) Rulemaking: Bacteria, Ammonia, Human Health and Aquatic Life Criteria.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Webinar on the Exposure Draft of CAS Continuing Education Policy
Tribal Hazard Mitigation Planning
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 Selection Process Flow Chart] Date.
doc.: IEEE <doc#>
IMPACT OF EASA ON MAINTENANCE ORGANISATIONS IN CANADA J Hall
Preparation of COM Decision SCG & Committee meeting February 9th, 2017
What Is VQIP? FDA required to establish a program to provide for the expedited review of food imported by voluntary participants. Eligibility is limited.
What is a CA document? Date: Authors: March 2005 March 2005
North American ALMA Development Program
July 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Proposal for Radio Specification Comments.
Informal document GRE Rev.1
Informal document GRE-80-0X
Report of Japanese Test Phase <Cyber Security>
Kasy Stinson Water Supply Division
Presentation transcript:

ENERGY STAR for Residential Light Fixtures Durability Implementation June 23, 2003

ENERGY STAR Durability Requirements ANSI-IEC Lamp Standardization: –Proposing to Add to RLF Eligibility Criteria through Specification Amendment. Maximum Ballast Operating Case Temperature: –Enforcement Through Current Specification (V. 3.1).

Purpose of Durability Requirements Compliance with ANSI Standards for Lamps: – Compatibility. – Accountability. Compliance with Maximum Ballast Operating Case Temperature for Optimal Performance: – Existing requirement. – Key to addressing premature failures.

ENERGY STAR Amendment Lamps shall meet ANSI C and C as appropriate. –Supply applicable ANSI or ANSI-IEC Standard Data Sheet Number. When using non-ANSI standardized lamps, supply a manufacturer lamp specification sheet that describes the electrical and dimensional information typically found in ANSI lamp data sheets.

ENERGY STAR Amendment: Process & Timeline Draft amendment to be released for public comment around July 1, Partners and interested parties will be given a 30-day comment period. Amendment and comments will be posted on the ENERGY STAR Specifications in the Product Development Web site. Amendment will go into effect on September 2, 2003.

ENERGY STAR Amendment: Implementation All new submittals received after the Amendment effective date will require the ANSI/ANSI-IEC Standard data sheet number or a manufacturer lamp specification sheet. Manufacturers of qualified product will have three months from the effective date to submit required documentation. –Products will be de-listed if information is not received within 30 days from deadline.

ENERGY STAR Specification Enforcement Laboratory test report will be required for a sub-set of fixtures from high risk fixture categories including: recessed and ceiling flush mount. The Laboratory test report shall demonstrate that the temperature of the ballast case, when installed in the fixture, meets the ENERGY STAR Specification for Maximum Ballast Operating Case Temperature for Optimal Performance: < 90º C or shall not exceed ballast manufacturer requirements, whichever is lower.

ENERGY STAR Specification Enforcement: Documentation Option One: Use existing test report completed in accordance with UL 1598 and demonstrate that the ballast case temperature, when installed in the fixture, does not exceed the lower of 90° C or ballast manufacturer requirements for performance. Option Two: If no existing test report is available, use the LRC’s “Proposed Durability Testing Method: Temperature” as guidance. The temperature of the ballast case should be taken at the “hot-spot” locations for performance as indicated by the ballast manufacturer.

ENERGY STAR Specification Enforcement: Implementation In Early July, manufacturers will receive written request for a laboratory test report proving the fixture meets ENERGY STAR’s maximum ballast operating case temperature requirement for performance. Manufacturers will be given 60 days from date of written request to provide laboratory test reports. Failure to provide laboratory test reports within 15 days of due date, will result in product de-listing. New product submittals will be tested according to the LRC’s “Proposed Durability Testing Method: Temperature” effective 9/1/03.