Vault-BL1A Shielding Plug Sept 26, 2012 L.Lee. N UCN Installation-1: 2014 Shutdown Shielding “Plug” will need to be reconfigured.

Slides:



Advertisements
Similar presentations
UCN Beamline Shielding, Target & Remote-Handling UCN CDR (Sept/2010) L.Lee.
Advertisements

Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
PROBLEM: Radiation Dose Rate in IR2 When IR1 is Operating (and Vice Versa) Muon Dose Rate > 1 mRem/hr for 0.1% Collimated Halo.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)
2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
BL1U at TRIUMF UCN Beamline Spallation Target & Remote-Handling System (Aug/2010) L.Lee.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
The Status of ESS Accelerator Shielding and Accident Scenarios Lali Tchelidze May 26, 2014.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.
UCN Facility Working Group October 3, 2012 OverviewL.Lee MCNPX and ShieldingP.Carlson Beam MonitorsC.A.Davis / A.Konaka.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)
F Proton Plan Eric Prebys, FNAL Accelerator Division.
UCN Facility at TRIUMF L.Lee October 3, 2012 PLACE UCN LOGO & ACRONYM HERE.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Overview of the GlueX Tagger and Photon Beamline..
1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical.
Beam line Experiment area SC magnet Pion production target
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
BL1U at TRIUMF UCN Beamline Septum & Dipole Magnets (April 12, 2010)
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
21 July 2006, Vancouver Global Design Effort 1 PPS - division into zones and shield wall locations - N. Terunuma KEK.
1 How Many Protons can we afford to loose in the PS ? Thomas Otto SC-RP.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
1 Target Station Design Dan Wilcox February 2012.
Dark Current and Radiation Shielding Studies for the ILC Main Linac
Preliminary Decommissioning Plan for the Canadian Light Source
Shielding Design for LCLS Injector Operation – Phase one
St. George Infrastructure
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
News and brief overview of Beamline plans for the next few months
Desirable BCM Performance
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
CFS consideration on the Main Dump and around
Presentation transcript:

Vault-BL1A Shielding Plug Sept 26, 2012 L.Lee

N UCN Installation-1: 2014 Shutdown Shielding “Plug” will need to be reconfigured

“Existing” Vault-BL1A Shielding Plug What is the required shielding “plug” thickness between the Vault & BL1A? When UCN beamline (septum & dipole) is installed, the shielding “plug” between the Vault and BL1A tunnel will need to be reconfigured. CYCL. VAULT BL1A

Vault-BL1A/1U Shielding Plug Footprint of the shielding plug will be reduced slightly. What are the requirements for the “new” shielding plug with BL1U installed? How thick does the “new” shielding plug need to be? CYCL. VAULT BL1A BL1U

Vault-BL1A/1U Shielding Requirements What are the requirements for the shielding “plug” with BL1U installed? (Preliminary discussions with A.Trudel) - Prompt Radiation Hazard (PRH) Study - Based on occupancy in 1A/1U tunnel with beam ON in vault:  Dose rate in accessible areas < 100  Sv/hr  Annual personnel dose limits from chronic losses < 1 mSv - Dose rate constraints for various accidental full beam loss scenarios (e.g. accidental insertion of 1A stripper, failure of 2AVB1 bender)  Dose rate outside shielding < 50 mSv/hr  Dose limit per full loss event < 1 mSv How thick does the “new” shielding need to be? - Based on dose rates from various scenarios mentioned above (PRH study, simulation studies, surveys/measurements) - Design to maintain overall effective thickness (   t ) in shielding “plug” Is a Shielding-Plug “Task Force” needed? Layout Option: Maintain effective thickness of shielding Replace some of the concrete w/ higher density mat’l

Vault Elements

Higher Density Shielding Materials Replacing some concrete blocks with higher density material Issues/Considerations: - Re-use existing concrete blocks, as much as possible Costs, Storage  fewer removed blocks (potentially activated) - Combine with denser (Steel) blocks - Combine with denser (Hematite-aggregate concrete) blocks Concrete/Hematite aggregate shielding blocks (from NSS) Variable/Customizable density ( g/cc) Used at reactors (Ontario – 25 yrs), SNS, TRIUMF NSS has worked with Ellis-Don, Burnco, LaFarge NSS Meeting at TRIUMF on Sep.10, 2012 (M.Chopra) Layout Options (“First-Pass” study): (1) Replace some concrete w/ steel blocks ( ~ 3:1 thickness ratio) (2) Replace some concrete w/ aggregate blocks ( ~ 2:1 thickness ratio)

Shielding Plug Layout: Option-1 Replace some concrete with steel blocks ( ~ 3:1 thickness ratio) “First-Pass” study using SolidWorks 3D-Model of Meson Hall West

SolidWorks 3D-Model of Meson Hall West CYCL. VAULT BL1A TUNNEL

Beampipe to BL1A Immovable Block East (to T1, T2, TNF) Existing Shielding (Layers A-D) (UPPER LAYERS E-J HIDDEN) Vault-1A “Plug”

Existing Shielding (Layers A+B+C) (LAYER D & UPPER LAYERS E-J HIDDEN)

Existing Shielding (Layer A+B) (LAYERS C+D & UPPER LAYERS E-J HIDDEN)

Existing Shielding (Layer A) (LAYERS B+C+D & UPPER LAYERS E-J HIDDEN)

“New” Shielding Layout (Layer A) “FIRST-PASS” STUDY : OPTION-1 (STEEL) Blue – steel, new Yellow – concrete, new (w/ cut-out)

“New” Shielding Layout (Layer A+B) “FIRST-PASS” STUDY : OPTION-1 (STEEL) Blue – steel, new Yellow – concrete, new (w/ cut-out)

“New” Shielding Layout (Layer A+B+C) “FIRST-PASS” STUDY : OPTION-1 (STEEL) Blue – steel, new Yellow – concrete, new (w/ cut-out)

“New” Shielding Layout (Layer A+B+C+D) “FIRST-PASS” STUDY : OPTION-1 (STEEL) Blue – steel, new Yellow – concrete, new (w/ cut-out)

List of “Removed” Concrete Blocks:List of “New” Blocks: (2) 12’ x 6’ x 4’(Layer A, C)(5) 2’ x 3’ x 6’ steel (Layer A) (7) 2’ x 3’ x 6’(Layer A)(1) 2’ x 3’ x 6’ steel*(Layer A) (1) 6’ x 3’ x 2’(Layer C)(2) 2’ x 3’ x 6’ concrete* (Layer A) (5) 2’ x 3’ x 2’(Layer D)(1) 6’ x 3’ x 2’ concrete* (Layer C) (6) 2’ x 3’ x 2’ steel (Layer D) (38% of existing) *block with “cut-out” for 1U beampipe Vault-1A Shielding Layout (Layers A-D) EXISTING vs “NEW” (OPTION-1, STEEL)

List of “Removed” Concrete Blocks:List of “New” Blocks: (2) 12’ x 6’ x 4’(Layer A, C)(7) 2’ x 3’ x 6’ aggregate (Layer A) (6) 2’ x 3’ x 6’(Layer A)(1) 2’ x 3’ x 6’ aggregate*(Layer A) (5) 6’ x 3’ x 2’(Layer A, B, C)(2) 2’ x 3’ x 6’ concrete* (Layer A) (4) 2’ x 3’ x 2’(Layer D)(1) 6’ x 3’ x 2’ concrete* (Layer C) (8) 2’ x 3’ x 2’ aggregate (Layer D) (42% of existing) *block with “cut-out” for 1U beampipe Vault-1A Shielding Layout (Layers A-D) EXISTING vs “NEW” (OPTION-2, AGGREGATE)

More Information on High-density Shielding Blocks from NSS (Nuclear Shielding Supplies)

High Density Concrete w/ Aggregate Nuclear Shielding Supplies and Services (NSS) Concrete/Hematite aggregate shielding blocks – HD ( g/cc) - Hematite (Fe 2 O 3 ): Coarse [1”  3/8”] & Fine [3/8”  100 mesh] components Established history of use at reactors and accelerators - Ontario Hydro (20 yrs, P.Mukherjee: Study of long-term effect on HD concrete at reactors) - BNL AGS (ilmenite, roof beams: 33 ton, blocks: 21, 11, 0.5 – 2 ton) - SNS Tunnel (hematite, 3.85g/cc, poured in place, 2000 m 3 ) - TRIUMF NSS has worked with Ellis-Don, Burnco, LaFarge Used in both radiation & non-radiation applications: - high density radiation shielding - linear accelerator vaults & treatment rooms - high dose rate HDR rooms - mass concrete projects - high density concrete applications columns - gravity seawall, coastal protection & breakwater structures - bridge counterweights - ballast for ocean vessels and off shore platforms - noise and vibration dampening Coarse Hematite Fine Hematite

Charles River Suspension Bridge in Boston, MA NSS HD-concrete (Non-radiation Applications) HD-concrete Back-spans

Breakwater Structure Utilizing High Density Concrete NSS HD-concrete (Non-radiation Applications)

EXTRA

ACTIVITY J A J O J A Schedule( ) Cleanup M11,1A/1B roof-beam Dismantle PIENU & M13-DS MESON HALL (& Vault): Core M13 I-block Shielding UCN APPARATUS: Spallation Target & R/H UCN Source BEAMLINE 1U: Kicker Septum Dipole Beamline (incl Quads, PS,…) Design & ReviewOrder/Fabricate/Deliver Test Order/Mod Order/Fabricate Design & Review Order/Fabricate InstallTest Specify/Conceptual design Design/FabricateInstallUnInstall Procure shielding blocksDesign & Review Install TRIUMF Beamline Commissioning HELIUM LIQUEFIER: Upgrade He Liquefier System He Liquefier System Procure UCN Source Commissioning Install/Test & RCNP Procure/Install Install Kicker Ceramic Beamtube Install Design/OrderFabricate Install Test MILESTONES Shutdown Activities Activities Elsewhere (KEK, RCNP, CERN, Acsion) Non-Shutdown Activities Mod. 1VQ4/Q5; BL1V & Shld Install Dismantle M13-US, Mod.Shld UCN Schedule (Draft) Design/Order/FabricateTest Install Design/Fab r

UCN Installation Schedule N 2014 Shutdown 2015 Shutdown 2015 Non-Shutdown & 2016 Shutdown