Investment project of Joint Stock Company “Elektrkimyosanoat ” HotamA. Saidahmedov Hotam A. Saidahmedov Director General
General information about the company Type of ownership: joint stock company Number of personnel: 6500 people Total production areas: 282,04 hectares Date of establishment of the enterprise: 1941
Information about the project Purpose of the project: Reconstruction of urea production unit Brief name: Elektrkimyosanoat JSC Share of Uzbek party: 51% Share of foreign party: 49%
Information about the production Type of production: ammonia nitrate, urea, ammonia sulfate, ammonia, nitric acid Production capacities Name of a good Annual capacity (tons/year) Price per unit (in USD) Volume of annual turnover (in USD) (in USD) Ammonia nitrate , Urea , ,8 Ammonia sulfate , Ammonia , Nitric acid ,6607,2
Potential of the company Buildings and Constructions: Name of the object Measure unit Total area Total area of the enterprise Hectares282,04 Including those covered with production areas m Area of roofed storages m Area of open storages m2- Subsidiary productions (objects of engineering provision) m2-
Potential of the company Engineering Communications: Name of the resource Measure unit Const per unit (in soums) Heatingm2 Provided by the enterprise Heat water m3m3m3m3 Home cold water m3m3m3m3- Water for technical needs m3m3m3m ,8 Natural gas m3m3m3m ElectricityKilowatt ,4 Sewerage m3m3m3m3-
Location Distance from Kilometers The administrative center Inside the enterprise Rail road Automobile road and encircling highway
Information on the proposed project Name of the project: Reconstruction of urea production unit Purpose of the project: Urea line functioning stabilization and enriching capacity of production up to 330 thousand tons per annum. Urea line functioning stabilization and enriching capacity of production up to 330 thousand tons per annum. Total cost of the project: Thous. USD. Total cost of the project: Thous. USD.Including: - Purchasing Equipment for refurbushing – 9635 Thous. USD. - Purchasing Equipment for refurbushing – 9635 Thous. USD. - construction-set up works Thous. USD. - construction-set up works Thous. USD. - repearing works – 100 Thous. USD. - repearing works – 100 Thous. USD. - Important finance Thous. USD. - Important finance Thous. USD. - Internal financial income Thous. USD. - Internal financial income Thous. USD. - demand in external finace Thous. USD. - demand in external finace Thous. USD.
Procured equipment № Name of the equipment Thous. USD. 1 Set of internal devices to the synthesis tower (2 sets), including pipes and materials I phase distillation tower (2 sets), including pipes and materials Stripper distillatory (2 sets), including pipes and materials Recuperator-heat exchanger (2 sets), including pipes and materials Urea granules processor with modifying accompaniment Stamicarbon, including pipes and materials 20 6 CO2 Compression equipment 5375
THANK YOU FOR YOUR ATTENTION! Joint Stock Company “ Elektrkimyosanoat ” Address: 2 Tashkentskaya street, Chirchik town Uzbekistan Director General: Mr Saidahmedov Hotam Anvarovich Telephone: (37171) , Fax: (37171)