April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 1 GONDOLA DESIGN & ANALYSIS OFFENDING OVERHANG/UNDERHANG CORRECTED ALL ANTENNAS NOW PLACED IN.

Slides:



Advertisements
Similar presentations
SOHO Instructions Cut out the lower bus bottom panels, sides, and top deck. Glue bottom panels together. Fold the side panels on the lines, bending tabs.
Advertisements

SUNPOWER Consulting Report
Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
Standardized Load Tables Characterizing Residential Solar Thermal and Solar Electric Installations For Residential Structures in Minnesota Jason S. Hanlon,
N. Dhanaraj, Y. Orlov, R. Wands Thermal-Stress Analysis of CC1 Space Frame.
Optimization For Existing Tilting Pan Filters Metalcraft.
Service Agency Accreditation Recognizing Quality Educational Service Agencies Mike Bugenski
The NEED Project: 30 Years of Energy Education1 Solar Energy.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
K. Liewer ANITA-Irvine CA 11/25/02 Gondola and Power Systems K. Liewer.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
K. Liewer ANITA-Irvine CA 11/25/02 ANITA Work Breakdown Structure and Schedule K. Liewer.
Collaboration Meeting at UCI, April 7-9, 2005 ANITA Thermal Analysis and Design Kurt Liewer.
April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 1 EMI AND THERMAL ISSUES THE MAIN ANITA EMI ENCLOSURE AND THE SIP EMI ENCLOSURE HAVE SIMILAR CONSTRUCTION,
ANtarctic Impulsive Transient Antenna NASA funding started 2003 for first launch in 2006 Phase A approval for SMEX ToO mission 600 km radius, 1.1 million.
Energy Management Good for me, good for you. What is energy management?? Energy management is the process of monitoring, controlling, and conserving energy.
Solar Energy. Radiant Energy Solar Radiation Average Daily Solar Insolation Per Month.
June 12, 2015 ICD-10 Update for Maine Child Health Improvement Partnership (ME CHIP)
TRW Code Updates Planned for ERD Activity in Windchill CRS User Help Guide for New System Changes October, 2005 TRW Automotive September, 2005 TRW Automotive.
IES Calibration Modeling Phil Valek and Roman Gomez May 29, 2013.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
3D Finite Element Analysis for Ribbed Structure Vacuum Vessel By: Hamed Hosseini Advisor: Prof. Farrokh Najmabadi.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
The Effects of Engineering Assumptions when Designing a Plate Panel/Stiffener System Under a Uniformly Distributed Load Bernard Nasser Master of Engineering.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
British Petroleum ISO Certification
Solar panel Mathieu and thomas. What is a solar panel Solar panel refers either to a photovoltaic module, a solar hot water panel, or to a set of solar.
AST Research and Development Activities COMSTAC Launch Operations and Support Working Group Chuck Larsen October 24, 2006 Federal Aviation Administration.
AdvancED District Accreditation Process © 2010 AdvancED.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
Loading data into the ETC and into the MPM Baseline.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
1 System Architecture Mark Herring (Stephen Merkowitz Presenting)
SPP FIELDS DFB Quarterly June 16, 2015 Solar Probe Plus FIELDS Instrument Quarterly Q Digital Fields Board (DFB) 1.
Strategic Planning Linked to Long Range Planning Presentation to Faculty and Staff February 13-14, 2008
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Progress Report on Modeling CTE in ACS/WFC TIPS May 19, 2011 Jay Anderson.
A View of NCSX Structural System and Load Path for the Base Support Structure.
Presentations for this session Anton – Detector concept and rate estimations Scott – Readout Jonathan – Data Management.
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Computer – Aided Design Terminology You must have a generic understanding of commands and techniques which are used in a number of packages (YOU CANNOT.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Electrostatic FEA on Field Cage Profile Configurations Bo Yu.
3D CAD What you need to know…. Main areas of CAD Modelling Techniques Modelling Edits Assembly Materials &Environment Use of Models File Types Basic Terms.
Updates on Vertex Detector NA61/SHINE Collaboration meeting, Wrocław Oct. 8, 2013.
Solar Panels Manufacturers in Dubai
Professional Career Ladder System Guidelines Promotion Packet County Extension Agents Revised – April, 2017.
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
"Drawer Mechanics - MiniDrawer"
SPF MAG Quarterly Report – Feb 2015
Nortel Corporate Presentation
Feed horn array sub-system for QUBIC
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Volume 1, Issue 6, Pages (May 1998)
Imaging Synapse Formation during Thymocyte Selection
Assignment 1, ECE 5652 Due to April 16th, 2010
Difference between 3 COF and 6 COF Open cells in 22” Segment
SOHO Instructions Cut out the lower bus bottom panels, sides, and top deck. Glue bottom panels together. Fold the side panels on the lines, bending tabs.
Fig. 6 Integration of responsiveness to nutrient restriction determines quantitative impact of MTAP deletion on global metabolic networks. Integration.
BIRDS-4 Computer Aided Drawing (CAD)
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 1 GONDOLA DESIGN & ANALYSIS OFFENDING OVERHANG/UNDERHANG CORRECTED ALL ANTENNAS NOW PLACED IN EITHER ONE OF TWO PHI POSITIONS FRAME DESIGN AT A COMPONENT LEVEL IS IN PROGRESS (CAD MODEL) GONDOLA DESIGN & ANALYSIS REPORT NEED TO BE SUBMITTED ~60 DAYS PRIOR TO EM FLIGHT FOR CERTIFICATION ROSEN AND MACNEAL HAVE COMMUNICATED ON THIS, RECOMMEND OVERSIGHT BY LIEWER (JPL TO SUBMIT REPORT) SOLAR POWER NEEDS ATTENTION, BUT IS NOT RQD FOR EM FLIGHT WHAT ARE WE GOING TO FLY ON THE EM FLIGHT???????????

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 2 GONDOLA DESIGN & ANALYSIS THE FIX TO THIS IS TO MAKE THE BOTTOM OCTAGONAL PROFILE OF THE TOP RING IDENTICAL TO THE TOP OCTAGONAL PROFILE OF THE LOWER RING. THIS DISTRIBUTES THE UPPER AND LOWER CORNER OBSTRUCTION EQUALLY BETWEEN THESE TWO RINGS. NEW GEOMETRY WILL BE DEMONSTRATED IN CAD. IT HAS DIRECT IMPACT ON THE LAUNCH ENVELOPE POSITION, AND MOST IMPORTANTLY THE PV ARRAY.

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 3 GONDOLA DESIGN & ANALYSIS PHI ALIGNMENT: ALL ANTENNAS ALIGN WITH EITHER A FLAT OR A VERTEX OF OUR OCTAGANAL COLUMN (16 HORN RING WAS FORMERLY MISALIGNED BY 11.25deg)

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 4 GONDOLA DESIGN & ANALYSIS GLOBAL FEA: PAUL MACNEAL (JPL)

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 5 GONDOLA DESIGN & ANALYSIS GLOBAL FEA: PAUL MACNEAL (JPL)

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 6 GONDOLA DESIGN & ANALYSIS GLOBAL FEA: PAUL MACNEAL (JPL)

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 7 GONDOLA DESIGN & ANALYSIS GLOBAL FEA: PAUL MACNEAL (JPL)

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 8 GONDOLA DESIGN & ANALYSIS COMPONENT FEA: MARC ROSEN (HAWAII)

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 9 GONDOLA DESIGN & ANALYSIS COMPONENT FEA: MARC ROSEN (HAWAII)

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 10 GONDOLA DESIGN & ANALYSIS FEA SUMMARY: ALL TUBES, CLEVISES, PADEYES, PLATES, ETC, OK IN AL6061 SUBMISSION FOR GONDOLA CERTIFICATION IS REQUIRED IN ~2 MONTHS

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 11 GONDOLA DESIGN & ANALYSIS BRIEF SUMMARY OF PHOTOVOLTAIC ISSUES NEW SUNPOWER CELL REPLACES OLD SHELL CELL (~13 -> 20% EFFICIENCY) PSL IS ADAPTING CHARGE CONTROLLER TO NEW CELLS WASH U IS WORKING WITH SAME CC AS PSL ANITA PLANS TO DEVELOP CARBON FIBER PV PANEL FRAMES I EXPECT TO LEARN MORE NEXT WEEK IN PALESTINE

April 8, 2005 ANITA Collaboration Meeting/UCI/Marc Rosen 12 GONDOLA DESIGN & ANALYSIS THE EM FLIGHT NEED TO MOVE FORWARD WITH AGGRESSIVE SCHEDULE FRAME = BEST EFFORT, BUT NOT NECESSARILY PERFECT BE PREPARED FOR UNIQUE ASSEMBLY (MATCH DRILL IF NEEDED) WE WILL LEARN A LOT FROM THIS FIRST EXERCISE EM FLIGHT IS PRIMARILY TO DEMONSTRATE LAUNCHABILITY AND STRUCTURAL INTEGRITY WHAT ARE WE GOING TO FLY???????????