Very Low Traffic GSM BTSs SITE NAME FD TRAFFIC- OCTOBER_201 3 CALL VOL OCTOBER _2013 Traffic Category Prev month data COMPARIS ON=D-L KoromDLC 54.961932VLT50.164.80.

Slides:



Advertisements
Similar presentations
Unit 2 Where is the post office? --- Is there a … near here? --- Yes, there is.
Advertisements

Urban Theory.
Key questions What are the main issues facing Swansea’s CBD?
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
CitywallCitygate St James Boulevard Newcastle Upon Tyne NE1 4JH Tel: +44 (191) By Road There is a pay and display parking facility to the front.
MODERN VENTURES (Pty)Ltd t/a NORTHERN GATEWAY CITY PORTION 2 OF 36-NQ
LMC, Bethesda Maps 01/21/ LMC, Bethesda Maps 01/21/ Lockheed Martin Headquarters 6801 Democracy Center 6901 ROCK SPRING DR OLD GEORGETOWN.
ASKING & GIVING DIRECTIONS 3. 1.Tourist office 2.Restaurant 3.Train station 4.Bus station 5.Subway Station 6.Hotel 7.Youth Hostel 8.Museum 9.Souvenir.
Unit 2 Places.
MONTHLY SSA MANAGEMENT MEETING KANNUR DISTRICT & MAHE BSNL BHAVAN, KANNUR ****** 22 nd SEPTEMBER 2012 Welcome.
SSA MANGEMENT MEETING ON 22 – 10 – 2013 ==================== KANNUR SSA.
Meeting with Employees of UPPALA Division ON 21 – 01 – 2014 ==================== 1.
====================
Ph: ,
Meeting with Employees of MATTANUR Division ON 17 – 01 – 2014 ==================== 1.
Middlebury Fire Department Facilities Analysis A Project by Middlebury College GG420 Students 17 March 2005.
Hon’ble Members of Parliament & Telecom Advisory Committee
No Problem! Student’s Book 1 train station What is the place? Vocabulary Places in a town 6 City life.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Settlement Rural and Urban by Tony Dunne OSi Maps copyright.
P RESENTATION ON GSM/UMTS N ETWORKS K ANNUR D IVISION.
EMSWORTH: MTI UPDATE APRIL EMSWORTH MTI HEALTH-CHECK – A SHORT HISTORY: Emsworth Food Festival and 30-month survey started to establish likes.
BSNL, KANNUR SSA Welcomes Hon’ble Member of Parliament & Esteemed Members of Telecom Advisory Committee TELECOM ADVISORY COMMITTEE MEETING
Module 1 Relationship Unite 1 Relatives in Beijing.
OG BARRED AND RESTORED : PERFORMANCES AS ON OG BARRED IN APRIL 2015 OG BARRED IN MARCH 2015 OG BARRED IN FEBRUARY 2015 OG BARRED IN JANUARY.
BUSES & EQUIPMENT TRUCKS Head East on Broad St. SPECTATORS South on SH 360 then U-Turn North to West Parking Entrance Traffic Flow into Complex (Not to.
Meeting with Employees of Nileswer Division ON 18 – 01 – 2014 ==================== 1.
MONTHLY SSA MANAGEMENT MEETING
MONTHLY SSA MANAGEMENT MEETING KANNUR SSA BSNL BHAVAN, KANNUR ****** Wednesday, the 26 th SEPTEMBER 2012.
Site: Ratcliffe-on-Soar Power Station Current/Defunct Use: Coal Power Station Location: South-West of Nottingham Land Owner: Mark Stevens Rail Connections:
BADBURY PARK, SWINDON MANAGING RESIDENTIAL GROWTH.
Pompeii – Public Buildings
WORK - IN - PROGRESS pending for Capitalization as on unit No. of cases Amount BASIC CMTS ELECTRICAL TOTAL762,52,50,426.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
DISTRICT INDUSTRIES CENTRE, KANNUR
KTM1 Meeting with Employees of Mattanur Division on
PL FIND THE VENUE DETAILS BELOW VENUE: Sapthapadi Sowdamini Sabhangana Sree Seetharamanjaneya Temple, Park Road,HASSAN,KARNATAKA  TO REACH HASSAN.
Unit2 Where’s the post office? Unit 2 Where’s the post office? Period I.
KTM1 Meeting with Employees of Payyanur Division on
SSAwise Revenue Target & Achievement for the year (Upto August, 2012) (Amount in Crores) SSAAnnual Target MONTHLY TARGET PROP TARGET UPTO THE MONTH.
CFA Revenue Comparison (Amount in Crores of Rs.) BASIC PLUS ( VOICE CALL REVENUE ) APRIL TO SEPTEMBER SSA DECLINE% DECLINE ENK %
KANNUR SSA: DEVELOPMENTAL PERFORMANCE DURING FEBRUARY 2016 As on 26/02/2016.
Kannur SSA: DIVISION / EXCHANGE WISE CFA REVENUE PERFORMANCE UPTO DEC.2015 UPTO DEC.2015 Vs DEC
KTM1 Meeting with Employees of MJR, PDL, UPL Divisions on
London Guide Lucie Nadymáčková. Content Basic information about London Economy Tourism Transport – London underground Interesting facts about London Greenwich.
CBD Characteristics You will need to be able to describe and where appropriate explain the main characteristics of the CBD. Where possible always try and.
Location. The Alton Towers Resort is located in a rural area near the village of Alton in Staffordshire, approximately 16 miles east of Stoke on Trent.
CADD CENTRE About US CADD Centre Training Services is the training arm of 27 year old CADD Centre Group, head quartered at Chennai, India.
Taj West End Hotel Hotel Royal Orchid Wonderla Resort The Leela Palace Vivanta By Taj - M G Road.
About UPSC The dream of becoming an IAS is greatly prevailing among the young aspirants nowadays. But being the toughest examination in India, civil services.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Football Post Traffic Set UP
OPA 15 – What is it? OPA 15 – “Hwy 400 Strategic Industrial Employment Area secondary plan” secondary plan prescribes the nature of development within.
MOBILE SERVICES – KANNUR BA
MONTHLY SSA MANAGEMENT MEETING
NWO-CFA.
Click on the blue arrow to start.
Asking Directions.
FINANCE & ACCOUNTS.
CGMs Review Meeting of Kannur BA
11 Guildford Park Road, GU2 7NA. Opposite the railway station.
Top 10 SBI PO Coaching Center In Mumbai
Top 10 RRB Coaching Center In Mumbai
Silver Line Department of Transportation
人民教育出版社、浙江省教育厅教研室 送教、交流活动.
Hop on – hop off bus tour in Bristol
N Learning Resources Center To Sim Lab Interior--- Office 115 ELEVATOR
CLASSIC Rotorua 3 Old Taupo Road ROTO1-71 SIZE 8.7 x 2.64 m
Building Committee FIRE DEPT. MEMBERS
Presentation transcript:

Very Low Traffic GSM BTSs SITE NAME FD TRAFFIC- OCTOBER_201 3 CALL VOL OCTOBER _2013 Traffic Category Prev month data COMPARIS ON=D-L KoromDLC VLT ThairaTemple VLT MuttamRlyGate VLT Rajagiri VLT Mallam VLT Nedumpoil VLT Alakkad VLT ParavoorKnr VLT Firestationqtrs VLT Kappad VLT

PHASE - VII : CANDIDATE NOT RECEIVED - TK SITES SL NO RPID SITE NAME SITE CATEGORY SSA DIV EXCHANGE LAND MARK 1 RP Mallukkunnu TK CUVChittarikkal Between Pulingome/Palavayal and Thayeni, Candidate received,BSS verification pending 2 RP Puthilott Cheruvathur TK CUVchervathur KUNHIRAMAN,Manayil,Valappil,Ko dakkad,671310,candidate backed out 3 RP PelicodeVayal TK CUVchervathurNear Library CPIM office Pelikode 4 RP KappilKNR TK KNGuduma 600 mts from Hotel Taj Vintage towards North 5 RP DurgaSchool TK KNGkanhangad Near new KSRTC bus depo at Kanhangad 6 RP Koovapalli TK KNGkanhangadNear to Kalluravi DLC.N.V.Narayani 7 RP KanhangadNewBusS tand TK KNGkanhangad Alamipalli Bus atand.priyesh MV,Bhaskara Meethal towers 8 RP BtwnSouthKalanada ndPoinachi TK KNGUDUMA Meethal mangad(junction from Poinachi, Kalanad, Chattamchal) in Chattamchal-Kalanad road 9 RP Gandhi Park TK KNR PKannurNear Saritha Theatre. 10 RP Payyambalam TK KNR PKannurPayyambalam Beach

PHASE - VII : CANDIDATE NOT RECEIVED - TK SITES SL NO RPIDSITE NAME SITE CATEGORY SSA DIV EXCHANGELAND MARK 11 RP-08217Thalamunda TK KNR TAnjarakandy Near Indus tower,Thalamunda 12 RP BtwnMaipadiandAlam pady TK KSZvidyanagar Hidayath nagar hightened location 13 RP-08367Parakatta TK KSZvidyanagar NearPolice Head quarters protest by public in the identified location 14 RP-08206Manakai TK MTRKololam Mudakandi 15 RP-08281Ozhinhavalap TK NLStaikadapuram East of Padnekkad 16 RP-08289Plachikkara TK NLSbeemanadi candidate NOT receoived 17 RP-08210Kaithapuram TK PAYMathamangalam Near Thrikutteri Temple 18 RP-07029PayyanurRW TK PAYpayyanoor Near Payyannur railway station in Olavara Kanadakali road 19 RP-07702Muthathi TK PAYpayyanoor Near Muthathi Govt School 20 RP-08354PayyanurOldBusStand TK PAYpayyanoor with in 100 mtr of Payyannur Old Busstand towards west at high building

PHASE - VII : CANDIDATE NOT RECEIVED - TK SITES SL NORPID SITE NAME SITE CATEGO RY SSA DIV EXCHANGELAND MARK 21RP EchalmvileTK PAY VELLUR BETWEEN KANKOL AND KOTHAIMUKKU 22RP Padoli TK PAY PALAKODE BETWEEN ETTIKULAND PALAKODE 23RP MUTTAM TK PAY ettikilam Between Ettikulam Palakode road, near harbour 24RP KumbalaBusStand TK PDL KUBLLA Within 200 mts North of Kumbala Bus stand 25RP CollegeOfAppliedScie nceManjeswaramNM EICT TK PDL kumbla Collge Of Science site at its own land 26 RP Chembra TK TLY P KodiyeriNear SS temple Chembra 27 RP vengad Ayapanthod TK TLY T VengadVengad theru 28 RP Perumachery TK TMB KolasseryNear Indus tower Perumachery 29RP UppalaRWStation TK UPL uppala Towards northen side of Uppala railway station, candidate received,Mr.Zulfikar

SIM Activation : October (up to 23 rd ) KANNUR PHONES + GMT (O) Total1181 KVR CSR Total632 KASARGODE CSR Total574 PAYYANUR CSR Total507 SREEKANDAPURAM CSR Total452 KANHANGAD CSR Total430 IRITTY CSR Total376 THALIPARAMBA CSR Total363 THALASSERY CSR Total334 ALACODE CSR Total327 UPPALA CSR Total306 KANNUR TELECOM Total274 CHERUKUNNU CSR Total266 CHERUVATHUR CSR Total246 PERDALA CSR Total245 MATTANUR CSR Total210 all csc8612

CHERUPUZHA CSR Total193 KUTHUPARAMBA CSR Total191 THALASSERY TELECOM CENTER Total189 PERAVOOR CSR Total162 NILESHWAR CSR Total137 CSR MANJESHWAR Total137 MULLERIA CSR Total131 KALANAD CSR Total130 PANOOR CSR Total108 RAJAPURAM CSC Total102 CHENGALA CSR Total89 MATHAMANGALAM Total67 TRIKARIPUR CSC Total61 UDUMA CSR Total57 BEEMANADI CSR Total54 MAHE CSR Total49 CTO KASARGODE Total32 all csc8612 SIM Activation : October (up to 23 rd )

CANDIDATE NOT RECEIVED - CONVERSION IP to TK SITES SL NO SITE NAME SITE CATEGORY SSA DIV EXCHANGELAND MARK 1 KadachiraTownCoversion IP to TK KNR TKadachira Near Trikapalam Siva temple 2 ArangilCoversion IP to TK SKMKudiyanmala Kokkamala 3 Malabar Cancer Center Coversion IP to TKTLY P Kodiyeri Malabar Cancer Centre. 4 Panur SouthCoversion IP to TK TLY TPanur Near Indus site, Aniyaram. 5 ElankodCoversion IP to TK TLY TPanur Elankod town 6 BalesugiriCoversion IP to TK TMBNaduvil Madakkad 7 KappalamCoversion IP to TK TMBThaliparambaNear Rajarajeshwara temple 8 Moolapalli Coversion IP to TK NLS nileshwar Near Moolapalli railway route, between Padnekkad and Nileshwar town,protest from public in the candidate identified location 9 KottapuramCoversion IP to TK NLS nileshwar kotapuram junction.Masjid committee building,Masjid committee ththere was difference of opinion,CANDIDATE BACKED OUT

SIM Activation : October ( up to 23 rd ) YM TRADE LINKS_THALASERRY-NEW Total249 YM TRADE LINKS_PAYYANNUR-NEW Total323 LINKWELL_TALIPARAMBA-NEW Total210 HINDUSTHAN ASSOCIATED TRADERS_MATTANNUR-NEW Total143 N A COMMUNICATIONS-KANNUR-NEW Total122 UMESHCO-SMARTFONE-KANHANGAD-NEW Total92 UMESHCO-SMARTFONE-NILESWARAM-NEW Total82 CELLTONE-UPPALA-NEW Total39 MADANI ENTERPRISES_KASARGOD-NEW Total14 all franch1274 Grand Total9886

MONTH OCTOBERSEPTEMBERVARIANCE OCT-SEP CO.code CSCDIVCSCDIVCSCDIV SDEPMHE Total SDECMLTLYP Total SDECMLTLYT Total SDEPKBA Total SDEGPNR Total SDECMLMTR Total SDEIDITY Total SDEGPRV Total SDECMLCNNP Total SDECMLCNNT Total SDECMLCUU Total SDECMLTMB Total SDECMLSKM Total SDEGACO Total SDECMLPAY Total SDEGCPA Total SDEGMMM Total ALL CSC Sales comparison

MONTH OCTOBERSEPTEMBERVARIANCE OCT-SEP CO.code CSCDIVCSCDIVCSCDIV SDEGTRK Total SDECMLCUV Total SDECMLNLS Total SDEGBDI Total SDEGRJP Total SDECMLKNG Total SDEGUDM Total SDEGCNG Total SDEKLD Total SDEMLA Total CSRKSZ Total SDECMLKSZ Total SDEGPDL Total SDECMLUPL Total SDECMLMJR Total ALL CSC