API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006.

Slides:



Advertisements
Similar presentations
February 5 & 6, Spring Gas-Lift Workshop ASME/API Gas-Lift Workshop API RP 11V5 Continuing the Review of Recommended Practices for Operation,
Advertisements

February 5 & 6, Spring Gas-Lift Workshop Spring ASME/API Gas-Lift Workshop Proposed New API RP 11V10 Recommended Practice for Operation,
Gas-Lift Surveillance Techniques
NUSTAR ECOS meeting held on the 27 of May 2005 in Paris (University of Jussieu): Three items: -The ECOS document for NuPECC -The ECOS town meeting.
Writing Process.
ISO ESP Systems Task Group Leader, Shauna Noonan
Writing as a Team Nicole Lindsay Bachelor of Commerce Quarter 2 January 2006.
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
Feb. 6, ASME/API Gas-Lift Workshop1 Using Chokes in Unloading Gas-Lift Valves by Ken Decker, Decker Technology Cleon Dunham, Oilfield Automation.
Subcommittee On Pressure Relief Systems CRE Meeting Spring 2011 Meeting Clark Shepard.
API 6AV1 and API 6A Comparison
API GAS LIFT TASK GROUP CHAIR - JIM BENNETT EXXONMOBIL.
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
ISO/TC67/SC4/WG3 meeting Brazil 10 th may 2006 Surface-Well head and xmass tree Eq. Scope: Standardization of wellheads and xmass trees as used in the.
2002 Spring ASME/API Gas-Lift Workshop
© 2011 Underwriters Laboratories Inc. Standards Development for PFDs – Accomplishments and Path Forward.
API S64, 3 rd Edition. 18 Dec 2013 Update. API S64 Chair – Tony Hogg Co-Chair – Open Current Edition – 2nd Edition, November 2001 Listing of Meetings.
Spring 2002 ASME/API Gas-Lift Workshop General Layout of Workshop and Call for Papers/Presentations General Instructions The workshop will be held at the.
Explorer Renewal 1/2010 Explorer Renewal Updated 9/29/14.
2003 ASME/API GAS-LIFT WORKSHOP Dual Gas Lift – EMEPMI Experience
IEEE Working Group on Broadband Wireless Access (BWA) IEEE /0047.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
32 nd Gas-Lift Workshop The Hague, The Netherlands February 2 - 5, 2009 This presentation is the property of the author(s) and his/her/their company(ies).
Use of API 6A vs ISO in marking 6A equipment
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
API 11V Task Group 15 November, 2007 Houston, USA.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Agenda Start up admin: roll call, approve agenda, appoint minute takers, approve last meeting minutes Review and approve latest draft of spec Issue discussion:
Nov. 13, Fall ASME/API Gas-Lift Workshop ASME/API Gas-Lift Workshop Gas-Lift Future An Extension of the Past, or a Whole New World? by Cleon.
API Task Group on GAS LIFT Equipment Chair - Jim Bennett ExxonMobil.
ITIL Project Change Management Workshop 7 February 2007
2002 Spring ASME/API Gas-Lift Workshop
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
Task Group Status January ,11, 2017
TG Chair: Mark Brinsden Shell
ISO Gas-Lift Work Task Session Fall 2003 Gas-Lift Workshop
API Gas-Lift Task Group Session Fall 2003 Gas-Lift Workshop
2001 ASME/API Gas-Lift Workshop
Fall 2001 ASME/API Gas-Lift Workshop
API RP 17A - Discussion Points
Spring 2003 ASME/API Gas-Lift Workshop
ISO Task Group Update Wayne Mabry.
2016 Gas-Lift Workshop Chair: Jim Hall, Shell International E&P
Status Update on API 16Q / 16R / 16F
For more information or to nominate papers, displays, etc., contact:
API 14H Task Group Status Proper Classification of Document
ISO TC64/SC4/WG2 May 2011 status
Use of API 6A vs ISO in marking 6A equipment
CHAIR - JIM BENNETT EXXONMOBIL
API 17H TASK GROUP January 15, 2013.
Standards Break Out Session
Welcome to the 35th Annual Gas-Lift Workshop
API 14H Task Group Status Proper Classification of Document
Gas Lift Workshop – 2003 ISO Update
Discussion Points API RP 17A Task Group Members
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
Report of the Technical Subcommittee
For more information or to nominate papers, exhibits, etc., contact:
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Points of new draft after small drafting meeting
For more information or to nominate papers, displays, etc., contact:
CHAIR - JIM BENNETT EXXONMOBIL
2002 Spring ASME/API Gas-Lift Workshop
2002 Spring ASME/API Gas-Lift Workshop
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

API 11V7 Task Group Gas-Lift Task Group Meeting Feb. 17, 2006

API Gas-Lift Task Group2 API 11V7 Task Group Current task group: –Chair: Jim Hall, Shell International EP –Secretary: Cleon Dunham, OAC See separate task group roster What changes are needed? –Additions –Changes –Deletions

Feb. 17, 2006API Gas-Lift Task Group3 Documents Not Currently Being Worked On API 11V1 – Gas-Lift Mandrels and Valves –Being replaced by ISO (side-pocket mandrels) and ISO (flow control devices) API RP 11V2 – Gas-Lift Valve Testing and Modeling –Being replaced by (flow control devices)

Feb. 17, 2006API Gas-Lift Task Group4 Documents Not Currently Being Worked On API RP 11V3 – Not used API RP 11V4 – Not used API RP 11V6 – Gas-Lift Design

Feb. 17, 2006API Gas-Lift Task Group5 Documents Not Currently Being Worked On API RP 11V7 – Gas-Lift Valve Repair and Maintenance –Being replaced by (flow control devices) API RP 11V8 – Gas-Lift Systems

Feb. 17, 2006API Gas-Lift Task Group6 Existing API 11V Documents That Will Remain API RP 11V6 – Gas-Lift Design API RP 11V8 – Gas-Lift Systems –Periodically, we need to review these documents and either: Keep them as is Update them Delete them

Feb. 17, 2006API Gas-Lift Task Group7 API RP 11V Documents That Are Currently Being Worked On API RP 11V5 – Gas-Lift Operation and Surveillance –This document has been substantially expanded –It has been reviewed by the API RP 11V Task Group –It is in final stages of “clean up” editing –A “final push” is needed to get this document finalized and re-submitted –Shall we agree on a target date / plan?

Feb. 17, 2006API Gas-Lift Task Group8 API RP 11V Documents That Are Currently Being Worked On Members of API RP 11V5 Work Group –Jim Bennett –Joe Clegg –Ken Decker –Cleon Dunham – Chair –Jim Hall –Eric Laine –Tony Liau –John Martinez –Tom Ryan

Feb. 17, 2006API Gas-Lift Task Group9 API RP 11V Documents That Are Currently Being Worked On API RP 11V9 – Dual Gas-Lift –This is a new document –It is largely (99%) drafted –A “final push” is needed to complete the first draft –Shall we agree on a target date / plan? –Once the first draft is done, the document needs to be reviewed by the Task Group –Some clean up of the Work Group membership is needed

Feb. 17, 2006API Gas-Lift Task Group10 API RP 11V Documents That Are Currently Being Worked On Members of API RP 11V9 Work Group –Jim Bennett –Fortune Bikoro –Joe Clegg –Peter Dassey –Cleon Dunham – Chair –Jim Hall –Ali Hernandez −Ken Hilse –Sies Hussain –Mariana Jamil –Eric Laine –David Lee −John Martinez −Tom Nations −Tom Ryan −Ron Schmidt −Gatut Widianoko

Feb. 17, 2006API Gas-Lift Task Group11 API RP 11V Documents That Are Currently Being Worked On API RP 11V10 – Intermittent Gas-Lift –This is a new document –It is largely (95%) drafted –A “final push” is needed to complete the first draft –Ali Hernandez, the chair, can’t work on this now due to his situation in Venezuela –Should we put this on hold, or finish the draft in his absence? –Once the first draft is done, the document needs to be reviewed by the Task Group –Some clean up of the Work Group membership is needed

Feb. 17, 2006API Gas-Lift Task Group12 API RP 11V Documents That Are Currently Being Worked On Members of API RP 11V10 Work Group –Jim Bennett –Jack Blann –Jesus Chacin –Joe Clegg –Cleon Dunham –Faustino Fuentes –Jim Hall –Ali Hernandez – Chair −Ken Hilse –Milka Hinojosa –Eric Laine –Jim Lea –David Lee –Luisana Marcano –Mario Marmora −John Martinez −Santiago Rojas −Amitava Sarkar −Jim Watkins

Feb. 17, 2006API Gas-Lift Task Group13 API Process for New Projects Task Group Chair Jim Hall will review the process and requirements for starting new API projects –Justification –Membership –Approval –Forms

Feb. 17, 2006API Gas-Lift Task Group14 Potential New API Task Group Work API RP 11V6 Upgrade –Would there be interest in upgrading this document, or in creating a new API RP 11V gas-lift design document, to include: Using gas-lift valve models in design Using dynamic gas-lift design concepts Other ideas –If there is interest, would someone be willing to take the lead?

Feb. 17, 2006API Gas-Lift Task Group15 Potential New API Task Group Work Possible new API 11V RP for surface- controlled downhole gas-lift equipment –With such equipment, there are significant concerns for: Selection Design Installation Operation Surveillance –If there is interest, would someone be willing to take the lead?

Feb. 17, 2006API Gas-Lift Task Group16 Potential New API Task Group Work Possible new API 11V RP for gas-lift automation, control, optimization –With such equipment, there are significant concerns for: Selection Design Installation Operation Surveillance –If there is interest, would someone be willing to take the lead?

Feb. 17, 2006API Gas-Lift Task Group17 Potential New API Task Group Work Possible new API 11V RP for design of production pressure operated gas-lift valves –This is essentially being covered in API RP 11V9 –Is a separate RP needed? –If there is interest, would someone be willing to take the lead?

Feb. 17, 2006API Gas-Lift Task Group18 Potential New API Task Group Work Possible new API 11V RP for Dynamic Gas-Lift Design and Analysis –This is being proposed by Juan Carlos Mantecon –He has already lined up several people who are willing to work on this

Feb. 17, 2006API Gas-Lift Task Group19 Potential New API Task Group Work Brainstorm on other possible new API 11V RP’s –If there is interest, would someone be willing to take the lead?