UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Assessing Transition of Security Operations in Afghanistan Project Proposal 11 February 2010 1.

Slides:



Advertisements
Similar presentations
Understanding Student Learning Objectives (S.L.O.s)
Advertisements

Advanced Health Models and Meaningful Use Workgroup: Roadmap Charge Overview Paul Tang, chair Joe Kimura, co-chair.
UNCLASSIFIED The Overall Classification of this Briefing is UNCLASSIFIED For Additional Assistance with this briefing or for release authority outside.
[Insert Project Name] Detailed Design Review (DDR) [Insert Date of DDR] Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC)
Regional Trajectories to the Knowledge Economy: A Dynamic Model IKINET-EURODITE Joint Conference Warsaw, May 2006.
California Child Welfare Co-Investment Partnership Children’s Conference Monterey, California May 29, 2008.
Maine SIM Evaluation: Presentation to Steering Committee December 10, 2014.
SAFER CITIES MODEL. SAFER CITIES TOOLS SAFER CITIES TRAINING MANUAL AND TOOLKIT Overall development objective is to facilitate effective strategy development.
Houston Independent School Technology Plan for
Maturing the ANSF Training Mission for 2012 & Beyond 30 Jan 2012 CAPT Philip Blaine, MSC, USN The MHS: Healthcare to Health NMT-A / CSTC-A.
Basic guidelines for the creation of a DW Create corporate sponsors and plan thoroughly Determine a scalable architectural framework for the DW Identify.
Lesson-11 Information System Development
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
IS&T Project Management: Project Management 101 June, 2006.
Learning Objectives Describe an overall framework for project integration management as it relates to the other PM knowledge areas and the project life.
Evaluating Physical Activity Intervention Programs Thomas Schmid, PhD Physical Activity and Health Branch CDC Atlanta, Georgia, USA.
Our recommendations were informed by an initial screen of all schools, community feedback and impact analyses, building walkthroughs, program assessments.
Ontario Psychological Association (OPA) Student Assessment Project “Designing a Project for Success” Date: February 6, 2009 Presented by: Marg Peppler,
Working Plan of US-China Bilateral cooperation on biomedical data sharing.
CDT Samantha Dorminey CDT Daniel Lasche CDT Angel Santiago CDT Milton Washington 10 DEC 2014.
Student Learning Objectives 1 Phase 3 Regional Training April 2013.
Don Von Dollen Senior Program Manager, Data Integration & Communications Grid Interop December 4, 2012 A Utility Standards and Technology Adoption Framework.
Do it pro bono. Strategic Scorecard Service Grant The Strategy Management Practice is presented by Wells Fargo. The design of the Strategic Scorecard Service.
Project Progress Document Optimization 5 April 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.
1 Early Childhood and Accountability OSEP’s Project Director’s Meeting August 2006.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Green Partnerships Local Partnerships for Greener Cities and Region Stavroula Tournaki, Chemical Engineer MSc, ΕU Projects Manager Konstantinos Voumvourakis,
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
Measuring the Quality of Decisionmaking and Planning Framed in the Context of IBC Experimentation February 9, 2007 Evidence Based Research, Inc.
Development of Counter Improvised Explosive Device (C-IED) Metrics Simon Crabtree Counter-IED Effects Team ISMOR 2011.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
A Mission of Restoration
UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Assessing Transition of Security Operations in Afghanistan Status Report 18 March
United Nations Regional Seminar on Census Data Dissemination and Spatial Analysis September, Nairobi, Kenya 1/18 Consultations with users in preparing.
UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Assessing Transition of Security Operations in Afghanistan Formal Progress Report 1 April
[ADD TITLE] Field Experience Culminating Presentation [ADD YOUR NANE] [ADD DATE]
Measuring Risk, Vulnerability and Impact in Conflict: Doing Better Through Data Collaboration What is DFID doing in Afghanistan?
MPE – Enabling ALL to securely SEE, DECIDE, ACT MPE - Highlights  Establish Core Implementation Working Group  Build Joining, Membership, and Exiting.
UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Assessing Transition of Security Operations in Afghanistan Progress Report 4 March
Peer Review of E-Government in Arab countries by Marco Daglio, Administrator, Public Governance and Territorial Development Directorate.
Proposed Preliminary Statewide Full Service Partnership Classification System BASED ON STAKEHOLDER FEEDBACK THIS REPORT IS THE MENTAL HEALTH SERVICES OVERSIGHT.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Status Reports: Measuring against Mission National Institute of Standards and Technology U.S. Department of Commerce 1 Technology Program Evaluation: Methodologies.
Software Engineering Lecture 10: System Engineering.
Update on Throughput Initiative & Tracking System Presented at the Extended Management Committee 2 February 2010 Professor George Subotzky Executive Director:
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
CSBG ROMA NEXT GENERATION
[School Name]’s Student Perception Survey Results This presentation is a template and should be customized to reflect the needs and context of your school.
North Carolina Student Growth Portfolio Spring 2013 Pilot Arts Education, Healthful Living, World Languages February 25, 2013.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
Note: In 2009, this survey replaced the NCA/Baldrige Quality Standards Assessment that was administered from Also, 2010 was the first time.
ISAF – The Operational Level View ISAF – The Operational Level View.
1 1 Assessment and Accountability Tuesday, November 1, 2011 Draft - July 13, 2011.
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Development of Counter Improvised Explosive Device (C-IED) Metrics
SOAR 3.0 Science ownership of accelerated research
College of Public Health and Human Sciences
ITSM Governance is Imperative to Succeed
Assessing Transition of Security Operations in Afghanistan
CIS12-3 IT Project Management
WG ESA meeting 9th of March 2015
Portfolio, Programme and Project
Project Name Here Kick-off Date
Special Education Maintenance of Effort Project
Presentation transcript:

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Assessing Transition of Security Operations in Afghanistan Project Proposal 11 February

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Agenda Background Problem Description Preliminary Requirements Technical Approach Expected Results Project Plan and Deliverables 2

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Background September 11 terrorist attacks 7 Oct 01: Coalition forces begin campaign in Afghanistan Goal of Current Coalition – Rebuild Afghanistan (self-gov’t, self-defense, care for citizens) Goal of International Security Assistance Force (ISAF) – Transfer lead for security operations to Afghan government Goal of Combined Security Transition Command-Afghanistan (CSTC-A) – Field effective Afghanistan National Security Forces (ANSF) 3

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Problem Description Deputy Director, Force Integration and Training (CJ7) / CSTC-A defined five lines of operation (LOOs) that support the goal of transferring security operations – Accelerate ANSF growth – Achieve security for the Afghan population – Marginalize malign actors – Achieve legitimate, responsive, and accountable governance – Facilitate community development Develop metrics and an accompanying decision support tool to measure progress against the five LOOs Stakeholders – Force Integration and Training cell of NTM-A/CSTC-A (sponsor) – NTM-A/CSTC-A – Coalition military leadership – U.S. government leadership 4

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Preliminary Requirements Majority of system must be compatible with software already owned and operated by the U.S. military Research focused on Afghanistan including but not limited to ANSF, civilian population, economy, and political organization Project group organization into two subgroups – Values and Metrics: development of value model – System Design: development of decision analysis tool 5

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Technical Approach – Value Model Qualitative Value Model: the identification of an objective hierarchy relating fundamental and means objectives Quantitative Value Model: the articulation of the decision maker’s preferences towards the attributes, and the means of measuring each attribute V(x) = ∑ w i v i (x i ) where w i = weight of attribute i v i = value of attribute i at score x i 6

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Technical Approach – System Design System Input: the quantitative portion of the value model in a standardized survey format, completed by military units System Processing and Storage: completed survey templates are configuration controlled and ingested into data storage. User querying capabilities allow the retrieval of data (by unit and/or AOR and/or date range) to research trends Analysis Output: Condensed and easily understood presentation for decision makers 7

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Expected Results The value model (both quantitative and qualitative portions) Survey template implementation of the quantitative portion of the value model Decision analysis environment consisting of: – Input function for survey template with completed unit observations – Data storage and analysis portion – Analysis presentation portion 8

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Project Plan and Deliverables 9 11 Feb: Project Proposal31 Mar: Initial System 18 Feb: Status Report, Model Requirements1 Apr: Formal IPR 25 Feb: Value and Metric Structure5 Apr: Finalized Model 4 Mar: Progress Report29 Apr: Written Report 18 Mar: Status Report7 May: Final Presentation/Website

UNCLASSIFIED – FOR INSTRUCTIONAL USE ONLY Questions? 10