Deployed Financial Management MNF-W Iraq 2005-2006 CJTF-HOA Africa 2003-2004 2d MarDiv Iraq 2005-2006 20060410v1.

Slides:



Advertisements
Similar presentations
Bulk Petroleum Executive Agent Cynthia F. Smith PETRO May 30, 2012.
Advertisements

Joint Contingency Contracting
Massachusetts Department of Elementary & Secondary Education
Cooperative Agreement Training STATE – FEDERAL PERSPECTIVES
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Silver Flag Exercise Site 1 Deployed Contracting Support Pat Procurement Contracting Team Lead.
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
1 INTERNAL CONTROLS Thomas Chin October 5, Presentation Topics Requirements – Internal Control Time and Effort Reporting Statistics on Single.
PURPOSE AND LEGAL AUTHORITY FOR COOPERATIVE AGREEMENTS
MCIEAST-MCB CAMP LEJEUNE REGIONAL EMERGENCY MANAGEMENT
2010 IERC Conference LEPC Funding Source, Appropriation, Allocation, and Usage IC By Ian Ewusi IERC Field Representative.
Standard Financial Information Structure (SFIS) Overview Presented by: Ray Bombac Business Transformation Agency.
August 6, AM General Actions to Ensure Future Restructured business: –Renegotiated labor agreement –Renegotiated supply base pricing, focus on small.
The Acquisition Gateway
Maintenance of Effort (MOE) Excess Cost Presenter Patricia Holcomb-Gray Office of Special Education Programs NJ Department of Education June 3, 2015.
ARRA Grants & Procurements American Recovery Reinvestment Act Training.
Public Procurement in The Rep. of Maldives
ZHRC/HTI Financial Management Training
1 SILVER FLAG BPA ORDERING OFFICIAL TRAINING. 2 Purpose Is to provide you, our customer, the information and knowledge to perform as an Ordering Official.
CONTRACTOR MANPOWER REPORTING
1 Army Policy and Procedures for Proper Use of Non-DoD Contracts Ed Cornett Procurement Policy and Support July 13 & 19, 2005 Presented to: Army Requiring.
1 How the AT&L Direct Budget System aka budgeOmatic and the Executive Information System aka zoomOrama fit into OSD management Presentation outline: Scope.
United States Foreign Military Fund Execution in Bulgaria Defense Security Cooperation Agency.
1 WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY.
Company Commander Course- Fiscal Law Fiscal Law for the Company Commander & 1SG.
Grant Requirement Reminders Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
Government Furnished Equipment (GFE) Overview
1 INTERNAL CONTROLS Matthew Pakos School Improvement Grant Programs May 23, 2011.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT Alan Chvotkin Senior Vice President and Counsel Professional Services Council DEFENSE ACQUISITION.
Budget Committee Workshop February16, Oregon’s local budget law is a group of statutes that require local governments to prepare and adopt annual.
ASA (FM&C) 1 Department of the Army Mass Transportation Benefit Program (MTBP) Outside the National Capital Region (NCR) Guidance for Program Points of.
FISCAL RESPONSIBILITY IN TITLE III AND OTHER SPONSORED PROGRAMS AND GRANTS ADMINISTRATION Presented by Sharon S. Crews, M.Ac., CPA Vice President for Administrative.
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
The Use of Public Procurement to Effect Economic Recovery: The Case of the United States Christopher Yukins George Washington University Law School Washington,
By Phillip Hamrock For BA 516 Marketing & Management August 5, 2008.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
Department of Defense Priorities and Challenges John P. Roth Deputy Comptroller (Program/Budget) 7 March 2005.
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
Webinar for FY 2011 i3 Grantees February 9, 2012 Fiscal Oversight of i3 Grants Erin McHughJames Evans, CPA, CGFM, CGMA Office of Innovation and Improvement.
Crisis Action Planning Process پروسه پلان گذاری عملکرد بحران Situation Development Crisis Assessment COA Development COA Selection Execution Planning Execution.
Application Amendments and Budget Transfers (Part 1) Virginia Department of Education Office of Program Administration and Accountability Title I University,
Visual 2.1 G191: ICS/EOC Interface Workshop Unit 2: Incident Command System (ICS) Review.
Contract Management Body of Knowledge Pre-Award Competencies Section 1.1 Laws and Regulations Part 2 Pre-Award Competencies Section 1.1 Laws and Regulations.
1 Humanitarian Mine Action (HMA) Colombia Assistance Plan 9 – 12 June 2009 Mr. José M. Matos Stability Directorate Humanitarian Assistance Division
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Fax: (703) DoD BIOMETRICS PROGRAM DoD Biometrics Management Office Phone: (703)
Event 1 Prefectural Government, FDMA, MOFA AMEMB components USFJ PACOM USAID/OFDA, DOS OSD, DOD, JCS Local Responders
Agency and Enterprise-wide Procurement Strategies 2015 SEWP Acquisition Summit and Training December 8-10, 2015.
Operations 104 Class 7—Finance Policy. Class 6—Financial Policy Most churches have some sort of collection of policies on Finances. Often these come from.
Privacy Act United States Army (Managerial Training)
DOD Non- Standard Equipment Review Panel (NSERP)
Small Business Programs Tatia Evelyn-Bellamy Director Small Business Division Small Business Center February 2016.
04/14/08 Implementation Execution & Closure DISAM web slides 3/2/11.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
Resources and Funding FRGs. Objectives of FRG Funding  To identify resources FRGs need  To review new Army regulation on funding for FRG operations.
ATA Purchasing Jeff Foster. Aerospace Testing Alliance  Joint venture between Jacobs Engineering, Computer Sciences Corporation, and General Physics.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
LEPC Funding Source, Appropriation, Allocation, and Usage IC
Office of the Chief of Chaplains Sustainment & Information Directorate
Asset Forfeiture Reporting
Session #2: Local Board Review of AEFLA Applications
Commercial Item Group Overview.
Asset Forfeiture Reporting
BYU-IDAHO Contracts, Negotiations & Signing Authority
SCD Grants & Contracts Policy & Procedure 670.
Financial Management Modernization Program
LTC Galgano / MAJ Lashley/ SFC Waggoner
Workshop Session I.
Transformation in Iraq
Financial Management Resource Analyst 3451
Presentation transcript:

Deployed Financial Management MNF-W Iraq CJTF-HOA Africa d MarDiv Iraq v1

Multi-National Force-West O&MMC Funding Process  Consolidated comptroller with all O&M funding held at the MEF ( approx $1B annually)  Units submit Open Purchase Requests via the Warfighter Open Purchase Request Router (WOPRR)  Expenditures over $50K required approval of the Marine Acquisition Review Board (MARB).

Warfighter Open Purchase Request Router (WOPPR)  Alternative to PR Builder Seamless transition from requisition to contracting. Customer visibility throughout process, holding those involved accountable.  Facilitates proper accounting Provides manageable interface for Account Managers Reduces Commitments>Obligations, NULOS, ULOS  Available wherever internet connectivity exists Minimum Bandwidth requirements No “downloads” or software required.

Commander’s Emergency Response Program (CERP)  Appropriated funding for humanitarian relief and reconstruction projects (approx $125M spent)  Equated to 40% to 50% of comptroller workload  Funding received from Multi-National Corps-Iraq (MNC-I)  Monthly reporting requirements for over 20,000 projects

Rewards Funding  Provided rewards for information and other non-lethal assistance beneficial to force protection or operations against international terrorism.  Funding provided by MNC-I

Joint Funding Process  Logistics Civil Augmentation Program (LOGCAP)  Joint Acquisition Review Board for validation/approval of purchases for supplies/services/equipment over $200K or LOGCAP expenditures over $50K  Joint Facilities Utilization Board validation/approval of construction projects  Monthly spend plan to MNC-I C-8 each month to leverage Army funding for executive agent funding issues

Iraqi Relief and Reconstruction Funds (IRRF) Iraqi Security Forces Funds (ISFF)  IRRF/ISSF- funding to support reconstruction efforts and to train, equip, and maintain the Iraqi Security Forces (ISF)  Ministry of Defense (MOD) & Ministry of Interior (MOI) responsible for the funding of the ISF, but…  Multi-National Security Transition Command – Iraq (MNSTC-I) Quick Reaction Funds ISF Base Camp Construction

Iraqi Security Forces Funding  MNC-I Training Team Integration Funds (TTIF)  Comprised of Military Training Teams (MiTTs), Border Training Teams (BTTs), Special Police Training Teams (SPTTs), and Police Partnership Program (P3).  Purpose is to provide transition teams funding to procure small, one-time items for the ISF.

You asked for what?

R U Speaking English?  COCOM – Designate EA’s  OPCON – Operators think this = $  TACON  ADCON – Traditional Title 10 Component responsibilities  Supported / Supporting  Executive Agent Common User Logistics Manager  Supply Classes I; III; IV  LOGCAP  BOS – I  ACSA JP 1-02 JP 4-0 JP 4-07 DoDD DoDD

CJTF-HOA Comptroller Office turnover was 320% for FY 04 Who are you?

Multiple spreadsheet and database interfaces resulted in a $156M reporting discrepancy for FY05 CERP Enterprise Financial Reporting

OSD CERP Policy Memo  USD Comptroller, dtd February 15, 2005 IV.H. Contracts and Grants. U.S. appropriations and other funds made available for the CERP may be expended through contracts and grants that are prepared and executed in accordance with regulations designed to ensure transparency, fairness and accountability. To the maximum extent practicable, these regulations shall be consistent with Coalition Provisional Authority Memorandum Number 4, Contract and Grant Procedures Applicable to Vested and Seized Iraqi property and the Development Fund for Iraq, dated August 19, 2003

CPA Memo 4  Section 2, Applicability This Memorandum does not apply to:  2) Coalition Forces commanders carrying out the Commanders’ Emergency Response Program. The Commanders’ Emergency Response Program will use the procedures contained in FRAGO 89 (Appendix E) or any subsequent amended guidance to FRAGO 89.

Internal Control Scenario  Maj Rick Crocker 30 active CERP reconstruction projects $657K value in obligated funds KIA in Hit, Iraq  How does the comptroller facilitate continuity of ops and prevent overpayments?  3 other PPO casualties occurred

Col Thomas Fuhrer Maj Thomas Osterhoudt HQMC, P&R Pentagon, 4C349