Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
An introduction to Lean tools and methodologies
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
Just-In-Time “Eliminate Waste”.
JIT/Lean Production. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 15, Slide 2 Some.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
MANAGING INVENTORY, MRP AND JIT.  Inventory management is a system used to oversee the flow of products and services in and out of an organization. A.
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
How to Effectively Implement Set-up Reduction in Any Organization.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
The Seven Deadly Wastes Course Objectives Learn what the Seven Deadly Wastes are and how they affect our business. Identify the Waste in our business and.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
Value Analysis/ Flow Analysis
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Lean Basics Dewey Warden.
JIT – Just-In-Time Production
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Philosophy and Key Concepts
Lean Production (MUDA)
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
Lean Manufacturing Chapter 15 pp June 29, 2012.
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
“Without the Cost of Waste …”
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
Operations Fall 2015 Bruce Duggan Providence University College.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Lean Manufacturing. Why do this? Lets look at jobs on Monster.com that refer to Lean - ployer/?WT_srch=1&s_kwcid=job%20ope.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Standard Work (Sample Slides) Superfactory Manufacturing Excellence Series Lean Overview 5S & Visual Factory Cellular Manufacturing Jidoka Kaizen Poka.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
A SEMINAR ON “LEAN MANUFACTURING”. What is Lean Manufacturing? Lean manufacturing is a comprehensive term referring to manufacturing methodologies based.
Lean Production Strategy Lean Manufacturing Strategy
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Mel Wendell – Mountain Pointe High School
Lean operations and JIT
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Lean Manufacturing Basic Overview XYZ Company.
Inputs and Outputs to Aggregate Production Planning
Introduction to Lean Emily Varnado.
Pricing your Products to be Profitable
Welcome to my presentation
Just-In-Time and Lean Production
Just In Time.
Inputs and Outputs to APP
Presentation transcript:

Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means they don’t have to accept anything less. Toyota Motor CorporationToyota Motor Corporation Sign in the Toyota Factory in Japan

The 5 Principles of Lean Identify the Value Stream –Defined from the customer’s perspective – Document so your organization understands in both a high and detail level your value streams Make Value Flow –Reduce all forms of Waste Wait time or “Que” time Non value-adding steps value- –The objective is continuous flow Pull from External and Internal Customers Provide only when needed

Optimize the Value Stream Remember, you are just a piece of that entire value stream Strive for Perfection Have the courage, wisdom, to continuously pursue and implement improvement opportunities The 5 Principles of Lean

Principles of Lean Resolute focus on the customer by providing: –Right parts –Right time –Right quantities …while reducing non-value added time in a team-based environment of continuous improvement

LEAN MANUFACTURING HOUSE GOAL : Continuously Reduce Cost Highlight Problem Area Build Quality Into Process Produce JIT Flexible Manufacturing Standardized Quality System Level Production Schedules Level Production Processes Level Manpower Requirements Machine Reliability What Is Needed When Needed Amount Needed Pass No Defects To The Next Customer Easy To Do It Right - Hard To Do It Wrong Build Quality Into The Process JIT JIDOKA HEIJUNKA No Value Added Value Added Necessary But No Value Added Production System Philosophy

Lean Thinking What does “Value Added” and “Non- Value Added” Mean?What does “Value Added” and “Non- Value Added” Mean? Well, lets ask ourselves the following: 1.What are our customers expecting from us… 2.What do we expect when we are the customer…

Lean Thinking A systematic approach to the elimination of Waste within the process… …by minimizing non-value added activities while standardizing value- added activities… …through the use of such concepts as: Cellular manufacturing, pull production to assembly lines, robust processes, quick set-up techniques,

Work vs. Waste Work Adds value Moves the process forward Waste Adds delay Adds cost

Waste 1.Overproduction - producing product ahead of schedule. 2.Waiting - workers or product waiting to be processed. 3.Transport - the movement of materials from one location to another. 4.Over processing - as a result of poor tool or product design. 5.Inventories - more material than the absolute minimum. 6.Movement - unnecessary movement by the workers. 7.Defects - scrap or rework. people 8.Untapped creativity, either forgotten or intentional, of the people in the workforce. Eliminate Sources of Waste

Over- Production u Producing over customer requirements, producing unnecessary materials, products.

Waste of Overproduction Value to Customer? Customer is not ready to pay or may never pay for the work done. See the signs: Stacks of Work in Process Old inventory To eliminate this type of waste –Establish a work flow sequence to satisfy the downstream customer –Create workplace norms and standards for each process –Create signal devices to prevent early processing

Waiting u Time delays, idle time. (Non value-added time)

Waste in Waiting (Time) Value to Customer? Customer does not pay us for time when no work is being done. See the signs: Workflow stoppages. Leaving the work area to go get someone or something. To eliminate this type of waste –Make sure that equipment and supplies are available. –Use Kanban to maintain the right level of supplies in the work area. –Do maintenance and setup external to process worktime. –Make sure resources are available for quick approval or eliminate redundant approvals and signatures. –Use man/machine charting to ensure optimization of operator’s time.

Transportation u Multiple, unnecessary and delay in handling.

Waste in Material Movement Value to Customer? Customer pays us to ship but pays us the same if we move it ten times back and forth across the warehouse or only once straight into the truck. Moving material is a IAC cost. To eliminate this type of waste –Make the distance over which something is moved as short as possible. –Eliminate temporary storage or staging locations. See the signs: Temporary stocking and staging locations Material movement without any value added step occurring in between

Over- Processing u Unnecessary processing steps or work elements, procedures. (Non value-added work)

Waste in Processing Value to Customer: Customer will not pay us to do work not included in his requirements. To eliminate this type of waste –Know customer requirements –Create workplace norms and standards that consistently meet customer requirements –Review processes and streamline or eliminate non value added steps whenever possible. See the signs: Repeating and verifying to make sure it is correct. Making it better than required. Example..Customer requires three wraps of tape but using four.

Inventory u Holding or purchasing unnecessary raw supplies, work-in-process and finished goods.

Waste of Inventory Value to Customer: Customer is not ready to pay or may never pay for the inventory. See the signs: Old or obsolete parts Supplies that never got used To eliminate this type of waste –Produce only enough to satisfy the requirements of the customer –Standardize work locations and the number of units per location (Kanban) –Ensure that Work In Process is used before more units are created (Kanban) –Use 5S to organize Note: Extra inventory can be process or personal. People keep extra supplies as a safety net. You may be purchasing items that are hidden throughout the facility. Extra inventory means you have more to manage. If you are looking for an item, you have to move extra inventory to find it.

Motion u Actions of people or equipment that do not add-value to the product.

Waste of Motion Value to Customer: Customer’s do not pay us for movement and handling that do not add value. All motion should add value. To eliminate this type of waste –Flow work processes in a way that reduces motion. –Arrange materials to be accessible at the point of use. –Simplify standardized work sequence to eliminate unnecessary movements –Apply ergonomics. See the signs: Lots of walking or reaching Going to get things

Correction u Producing a part that is scrapped or requires rework.

Waste of Correction Rework!!!! Value to Customer: Customers only pay for product meeting their requirements. Even worse, if these defects escape, it greatly dissatisfies our customer. To eliminate this type of waste –Establish standard work procedures –Create and post job aids –Mistake Proof processes See the signs: Hold material Scrap Double or triple verification steps

Lean Implementation Requires these basics… Document the process Understand the process Manage the process Improve the process Monitor the process

A Toyota view: “We get brilliant results from average people managing brilliant processes. We observe that our competitors often get average (or worse) results from brilliant people managing broken processes.”