RHIC present status, and plans Wolfram Fischer 12 May 2011 Opportunities for Drell-Yan Physics at RHIC, BNL.

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
The Relativistic Heavy Ion Collider high-intensity polarized H - ion source The Relativistic Heavy Ion Collider high-intensity polarized H - ion source.
Thomas Roser 2 nd Electron-Ion Collider Workshop March 15-17, 2004 Ion Polarization in RHIC/eRHIC M. Bai, W. MacKay, V. Ptitsyn, T. Roser, A. Zelenski.
Polarized deuterons and protons at NICA А.Коваленко NICA-SPIN_PRAGUE 2013 Charles University, Prague, July 7-12, 2013.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
ERHIC design status V.Ptitsyn for the eRHIC design team.
BROOKHAVEN SCIENCE ASSOCIATES Electron Cooling at RHIC Enhancement of Average Luminosity for Heavy Ion Collisions at RHIC R&D Plans and Simulation Studies.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
RHIC polarized source upgrade. A.Zelenski, BNL. Workshop on high–energy spin physics, IHEP, Protvino, September 1983 Workshop on high–energy spin physics,
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Thomas Roser SPIN 2006 October 3, 2006 A Study of Polarized Proton Acceleration in J-PARC A.U.Luccio, M.Bai, T.Roser Brookhaven National Laboratory, Upton,
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Large Booster and Collider Ring
Acceleration of Polarized Protons and Deuterons at HESR/FAIR
eRHIC with Self-Polarizing Electron Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
LHC (SSC) Byung Yunn CASA.
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Presentation transcript:

RHIC present status, and plans Wolfram Fischer 12 May 2011 Opportunities for Drell-Yan Physics at RHIC, BNL

Wolfram Fischer2 2 superconducting 3.8 km rings 2 large experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity L 2. Proton polarization P 3. Versatility Au-Au, d-Au, Cu-Cu, polarized p-p (so far) 12 different energies (so far) Relativistic Heavy Ion Collider 1 of 2 ion colliders (other is LHC), only polarized p-p collider

Content 1.Run-11 polarized proton performance Impact of A n DY, future operation 2.Future developments for polarized protons 3.Asymmetric collisions (d-Au and p-Au) 4.Energy upgrade 5.Polarized 3 He (p- 3 He, 3 He- 3 He) Wolfram Fischer3

Run GeV store overview – polarization and luminosity Wolfram Fischer4 Run Coordinator: Haixin Huang Run-9 peak Run-9 avg.

Run-11 polarized proton luminosity √s = 500 GeV Wolfram Fischer5 Run-9 PHENIX STAR AnDY (x30) Refrigerator off & AGS power cable failure 2 weeks 9 MHz rf system failure limits intensity Run Coordinator: Haixin Huang

Run-11 polarized proton time-in-store (% of calendar time) Wolfram Fischer6 Time-in-store lower than in previous runs No common reason identified for reduced time-in-store 2 largest events (refrigerator off, AGS power cable) account for 9% Effect on performance stronger than linear (scheduling difficult, less time for implementation of improvements, more time re-establishing machine) 60%

Unusual events in 250 GeV polarized proton Run-11 Total of 6 snow days during start-up (>20 h excused time in January) Fast emittance growth in Blue ring (intermittently observed in 2007 and 2009, tracked down to loose wire in dump kicker thyratron module B), delayed physics by about ½ week Breaker trip on 03/07/11 leads to refrigerator shut-off and helium venting in 2:00 and 6:00 service buildings, loss of about 3.5 tons of He, after repair encounter difficulties in purchasing replacement He, operation re-established on 03/17/11 – 219h downtime Power cable failure shut-down most of AGS equipment and part of building 911 – 78h downtime New 9 MHz RF system breaks 1 week before run end (current shield for bellows failing leading to overheating), cutting luminosity in half Wolfram Fischer7

Run-11 peak polarization and luminosity Wolfram Fischer8 Run-9 achieved Run-11 achieved Run-11 projections Polarization P%35 ★ 46 ★ 35−50 ★ Peak luminosity L peak cm -2 s * 85−170 Avg. store luminosty L avg cm -2 s * 55−100 Luminosity per week L week pb −35 Time-in-store%53 37 (46 ** ) 55 ★ Online H-jet measurement (average over transverse profile) * Average of 6 best stores. ** Excluding down time due to refrigerator and AGS power cable failure. Good progress with peak performance Overall performance held back by reduced reliability Established operation of A n DY with small impact on STAR/PHENIX Run Coordinator: Haixin Huang

Main improvements for polarized protons in Run-11 AGS Magnets surveyed and adjusted horizontally (P+) Horizontal tune jump quads operational (reduced P profiles, P +5%) Access Control System rebuild after fire on 11/09/11 RHIC Magnets surveyed and adjusted vertically (P+) New auto-transformer in Blue to reduce flattop-to-ramp MMPS transients (needed for 9 MHz rf, had done Yellow previously) (P+) Yellow snake installed in sector 9 after repair Inserts installed in beam dump (19 pieces, 12.7 cm long), allowed for higher intensity, at limit in Run-9 (Q4 quench without) (L+) 2 common storage cavities moved to sector 3, 2 more cavities installed => allows for permanent 9 MHz cavity (L+) Wolfram Fischer9

Main improvements for polarized protons in Run-11 RHIC 2 storage cavities permanently converted to 9 MHz, 1 bouncer cavity install in each ring (9 MHz) (P+, L+) Current limit for tq increased from 100 A to 140A IR6 to IR8 (L+) Collimation on ramp with continuous set point changes (L+) RHIC CNI polarimeters with new electronics (mitigates rate dependence) First H-jet polarization measurement at injection RHIC beam and optics control All ramps with orbit, tune, and coupling feedback (P+, L+) Ramps Q v = (near low order resonance) (P+) Radial loop control via all BPMs (previously only 2) (P+, L+) Octupoles on ramp to suppress instabilities (L+) Operational use of 10 Hz orbit feedback in store (L+) First use of beta-beat correction in operation (L+) Wolfram Fischer10 [ Note: also have upgrade for heavy ions, particularly for stochastic cooling. ]

Down ramp with polarized protons in Run-11 Wolfram Fischer11 Setup and 3 up and down ramps with up to 109x109 bunches in only 2 shifts (simultaneous orbit/tune/coupling/chromaticity feedback essential) 100 GeV 250 GeV Main dipole current 100 GeV 250 GeV 56x56 bunches 109x109 bunches

Down ramp with polarized protons in Run-11 Wolfram Fischer GeV: R up /R down = 0.80 ± 0.02 Pol. trans. on up ramp: 0.89 ± 0.01 If P(250) = 46 % then P(100) ~ P(24) = 52% ?? If P(24) ~ P(100) = 65% then P(250) = 58% From H-jet calibration of pC polarimeter at 100 GeV and 250 GeV there is ~30% (relative) loss of polarization between 100 GeV and 250 GeV (~65% -> 45%) Varying many parameter on energy ramp that should change polarization if there is a polarization loss had no effect on polarization (snake currents, vertical tune, horizontal tune, vertical chromaticity, momentum spread, blue vs. yellow) Up/down ramp will independently measure polarization loss between 100 GeV and 250 GeV Summary T. Roser

A n DY in Run-11 (250 GeV pp) Beam envelope function  * = 3.0 m at IP2 Reduced IP2 crossing angle from initially 2.0 mrad to zero Added 3 rd collision with following criteria (last instruction) : 1. N b ≤ 1.5x Beam loss rate <15%/h in both beams 3.Not before first polarization measurement 3h into store Wolfram Fischer13 PHENIX STAR AnDY small impact visible impact, few percent loss to STAR/PHENIX loss rates  /IP =  /IP = 0.005

Future operation of A n DY Can reduce  * at IP2 have run with  * = 2.0 m previously for BRAHMS  * = 1.5 m probably ok, needs to be tested Longer stores 10h instead of 8h in Run-11 (depends on luminosity lifetime and store-to-store time) Collide earlier in store when conditions are met needs coordination with polarization measurement, PHENIX and STAR Electron lenses (see later) if A n DY runs beyond Run-13 increases max beam-beam tune spread, currently  Q max,bb ≈ can be used for to increase  ~N b /  and/or number of collisions Wolfram Fischer14 pp in Run-4 (100 GeV) Run-11 luminosity at A n DY: max ~0.3 pb -1 /store With improvements: ~3x increase, ~10 pb -1 /week [all preliminary]

Future upgrades for polarized protons Power supplies upgrades/replacements (T) Reliability upgrades in other areas (T) 9 MHz upgrade for more intensity (L) Different tunes (P,L) (near-integer tune is option since 10 Hz feedback operational) Spin flipper (P) Lower  * (L) (requires  and Q’’/Q’’’ correction) Polarized source upgrade (P, L) [Run-13] Electron lenses, partial head-on beam-beam compensation (L) [Run-13] 56 MHz SRF (L) [Run-14] Instrumentation upgrades (L,P) In-situ beam pipe-coating coating (L) Wolfram Fischer15 Focus of this year’s RHIC Retreat

Optically Pumped Polarized H – source (OPPIS) Wolfram Fischer16 Current OPPIS ECR Rb-cell Sona Na-jet (H + ) (H 0 ) (H − ) RHIC OPPIS produces reliably mA polarized H - ion current. Polarization at 200 MeV: P = 80-85%. Beam intensity (ion/pulse) routine operation: Source H - /pulse Linac - 5x10 11 AGS x10 11 RHIC - 1.8x10 11 /bunch A. Zelenski, PST GHz ECR source used for primary H + generation source was originally developed for dc operation sc solenoid

Optically Pumped Polarized H – source (OPPIS) – A. Zelenski Wolfram Fischer17 10x intensity increase was demonstrated in a pulsed operation by using a very high-brightness Fast Atomic Beam Source instead of the ECR source Goals: 1. H − beam current increase to 10mA (order of magnitude) 2. Polarization to % (~5% increase) Upgrade components: 1. Atomic hydrogen injector (collaboration with BINP Novosibirsk) 2. Superconducting solenoid (3 T) 3. Beam diagnostics and polarimetry Upgraded OPPIS (Run-13) Source Neutralizer Ionizer Rb-cell Sona Na-jet (H + ) (H 0 ) (H + ) (H 0 ) (H − ) sc solenoid

Electron lenses – partial head-on beam-beam compensation Wolfram Fischer18 Polarized proton luminosity limited by head-on beam-beam effect (  Q bb,max ~ 0.02) Basic idea: In addition to 2(3) beam-beam collisions with positively charged beam have another collision with a negatively charged beam with the same amplitude dependence. Exact compensation for: short bunches  x,y = k  between p-p and p-e collision no nonlinearities between p-p and p-e same amplitude dependent kick from p-p, p-e only approximate realization possible Expect up to 2x more luminosity with OPPIS upgrade Commissioning planned for Run-13 e-gun e-collector main solenoid manufacturing in SMD GS1 manufacturing in industry

Wolfram Fischer19 Summary – RHIC luminosity and polarization goals ParameterUnit AchievedUpgraded Au-Au operation (2010)(>=2012) Energy GeV/nucleon 100 No of bunches … 111 Bunch intensity Average L cm -2 s p  - p  operation (2011)(>=2012)(>=2014) Energy GeV 100 / No of bunches … 109 Bunch intensity / / Average L cm -2 s / 9030 / / 300 Polarization P % 55 / 4670

Polarized proton projections Run-12 to Run-14 Wolfram Fischer20 [Assume 12 weeks of physics per run, 8 weeks linear luminosity ramp up.] OPPIS Electron lens 56 MHz SRF 9 MHz upgrade

Asymmetric collisions (d-Au) Operated d-Au in Run-3 (2002/03) and Run-8 (2007/08) at full energy GeV/nucleon d on GeV/nucleon Au (  d =  Au = 107.4) Future gains in d-Au operation from 3-D stochastic cooling of Au beam reduction in  *, increase in bunch intensity and number of bunches For energy scan need to match Lorentz factor  of both beams Wolfram Fischer21 Run-8 achieved ≥ Run-12 Max projections Peak luminosty L peak cm -2 s Avg. store luminosty L avg cm -2 s Luminosity per week L week nb Time-in-store%5855

Asymmetric collisions (p-Au) p-Au was considered in RHIC design (D. Trbojevic), no operation yet GeV p on GeV/nucleon Au (  p =  Au = 107.4) Need to translate DX magnets horizontally by 4.33 cm p are bent stronger than Au 79+ For energy scan need to match Lorentz factor  of both beams Wolfram Fischer22

Energy upgrade – W. MacKay, BNL C-A/AP/422 Motivations: 1.Increase in W production cross section 2.eRHIC Main issues: Quench performance of magnets (DX, arc dipoles and quads, IR quads) Crossing angles at IPs and luminosity Polarization Current feedthroughs Power supplies and transformers Dump kicker (strength, pre-fires) Reliability generally reduced at higher energies Wolfram Fischer23

Energy upgrade – W. MacKay, C-A/AP/422 Conclusion: 10% increase to 275 GeV (+45% in  W ) feasible with current magnets about 20 DX, 10 other training quenches, more cooling at some current leads Requires some hardware upgrades (dump kicker, power supplies) Effect on polarization still needs study Energies >275 GeV require too many training quenches hundreds of arc dipole training quenches alone for 325 GeV Wolfram Fischer24 estimated # of training quenches observed quenches in arc dipoles acceptance test, 62 DRG

Polarized d Polarized neutrons for RHIC and eRHIC could be in deuterons (d = 2 H 1+ ) or 3 He 2+ d very difficult at high energy (i.e. RHIC) Currently no technical solution for maintaining and rotating polarized deuterons (G = −0.14) in RHIC Siberian snake with B out = 33.5 T, B in = T Wolfram Fischer25 Orbit excursion in snake for deuterons  [W. MacKay, CAD MAC-05, 09/15/2010]

Polarized 3 He Wolfram Fischer26 [Summary W. MacKay, CAD MAC-05, 09/15/2010]

Polarized 3 He source R&D Plans to start working on 3 He source (MIT – R. Milner, Mainz) 3 possibilities discussed to use EBIS (A. Zelenski, J. Alessi et al.): 1. 3 He production outside EBIS limits on field gradients 2. 3 He production inside EBIS space and maintenance issues, P source measurement 3.Injection of 3 He + into EBIS In all cases EBIS ionizes to 3 H 2+ Aim for 2.5x10 11 ions from EBIS, 1x10 11 /bunch in RHIC Could collide 3 He- 3 He or p- 3 He at  max = 178 ( 3 He with GeV/nucleon, p with GeV) Wolfram Fischer27

Summary – RHIC performance Run-11 p ⌃ p ⌃ results: P > 46%, L peak = 150x10 30 cm -2 s -1, L avg = 85x10 30 cm -2 s -1 (all new records for peak performance, and all within Run-11 projections) Integrated luminosity below expectation due to down time A n DY tested, ran with relatively small impact on STAR/PHENIX Main hardware upgrades for p ⌃ p ⌃ (commissioning planned for Run-13) Polarized source: P +5%, intensity +order of magnitude Electron lenses : up to 2x more luminosity with source upgrade Asymmetric collisions (d-Au and p-Au) Expect up 2x more luminosity for future d-Au operation rel. to Run-8 p-Au possible with change of DX location (  p =  Au = 107.4) Limited energy upgrade possible, 10% to 275 GeV protons Effect on polarization still needs study, requires hardware upgrades Polarized 3 He (p- 3 He, 3 He- 3 He) Polarized 3 He source R&D has started (with MIT, using EBIS) Acceleration and storage in RHIC should be possible 3 He polarimetry at high (esp. absolute) needs R&D Wolfram Fischer28