S. Zelepoukine CMS Electronics 2003 1 Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ 28.3.2003.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
The Detector Control System for the ATLAS SemiConductor Tracker
Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
G. Dissertori ETH Zürich ECAL ESR - DCS 1 ECAL Detector Control System G. Dissertori Electronics System Review, Oct 9, 2003 Status report Trigger/DAQ.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Susanne Kersten, Wuppertal University November 21/22, 2013.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
G. Dissertori ETH Zürich ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Detector Control and Safety System for the Electromagnetic Calorimeter.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Tales and mysteries of PVSS in the land of ECAL Alison Lister ETHZ Alison Lister
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
Monitoring hardware for SVD (VXD) L.Lanceri, L.Vitale /INFN Trieste VXD Workshop, 01/10/2014 Slow Controls discussion session 1 1.Radiation & beam abort.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
DCS: Temperature Probes
CMS-ECAL DCS Prototype
CMS-ECAL Front-End monitoring Matteo Marone
TPC Detector Control System
Presentation transcript:

S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ

S. Zelepoukine CMS Electronics Outline Precision temperature monitoring Humidity monitoring Temperature safety system (TSS) Preshower Software (PVSS) H4 testbeam 2003 Bld.867, DCS lab, other activities Conclusions

S. Zelepoukine CMS Electronics Precision temperature monitoring monitor temperature stability (thermal screen, grid). precision required : at least 0.01 deg (relative). sensors: Betatherm Thermistors (NTC) — approx. 500 (EB+EE) sensor location (in a SM, similar in EE quadrant): grid — 1 sensor in each module; thermal screen — 1 sensor in each module; IN/OUT cooling pipes — 2 sensors per SM. Total: 10 sensors per SM (EE quadrant) readout (several options are considered): Keithley multimeter with/without a remote transducer; ELMB with/without a remote transducer (a backup solution).

S. Zelepoukine CMS Electronics Precision temperature monitoring Status — sensor probes: Exact sensor location is defined (symmetrical in SM). Sensor probe design is finalized (grid + thermal screen). Immersion probe for In/Out cooling pipes: OK for SM0 (F.Mossiere); To be defined for SMx. Sensor installation procedure: defined for the thermal screen; to be defined for the grid and In/Out pipes. Sensor cabling inside SM: use flat cable (or single twisted pairs); reconsider patch panel connector (crimped / IDC ?). Preliminary offers obtained : ~ 10 CHF per sensor (factory pre-calibrated!)

S. Zelepoukine CMS Electronics Precision temperature monitoring Sensor positioning on the thermal screen SM0 SM1,... SM0,... Sensor positioning on the grid

S. Zelepoukine CMS Electronics Precision temperature monitoring Sensor positioning on cooling pipes (immersion probes) F.Mossiere, EST/ME

S. Zelepoukine CMS Electronics Temperature probe (V.3) 10 mm 17 mm 10 mm 2x holes diameter = 3 mm Temperature probes to be installed on the thermal screen and on the grid. Material — aluminium alloy; therm.conductivity k = 170 W/m * K Screws (2.5mm) Alumin. plate 10 mm section

S. Zelepoukine CMS Electronics Temp.probe – finite element model Delta T = 1 K (plate – air) Delta T = 0.06 mK (sensor location) A.Riabov (IHEP, Protvino)

S. Zelepoukine CMS Electronics Precision temperature monitoring Status — readout: ELMB will still be used for the setup in H4 / Bld.867. In the meantime, Keithley [+ T-MUX] options are to be tested. Transducer (T-MUX) is under development: T-MUX = analog multiplexer + RBFE ASIC (LHC/ACR) Non rad-hard MUX (Maxim) irradiated at PSI (Dec.02), see CMS Int.note; Results are negative for high rad.doses (>10 years inside ECAL): parameters are not stable enough for required precision. Can still be considered if placed on the balcony and periodically replaced. Rad-hard MUX (EP/MIC) considered to be used for the second T-MUX version. For this I 2 C remote connection has to be implemented. Prototype PCB is produced at IHEP (Andrei Sidorov, IHEP); should now be assembled and tested in the lab — no irradiation testing required. Keithley tests in the lab (Alison Lister, ETHZ) long cables (~ 100m) — switching rate, noise effects; 2-wire / 4-wire sensor connection.

S. Zelepoukine CMS Electronics Precision temperature monitoring Switching_ 2_ point, integration time= 0. 5s Keithley measurements: 2-wire connection, long cable Alison Lister, ETHZ 0.01 Ohm

S. Zelepoukine CMS Electronics Humidity monitoring Collaboration with CMS Tracker DCS (A.Tsirou) for sensor study and selection. Also, sensor electronics. Several types of sensors being tested in the Tracker lab. New sensors from Hygrometrix at medium price (~ 15 CHF). Irradiation tests at PSI will start soon (in 1-2 weeks). Non rad-hard sensors will be used in H4 setup (to obtain experience; provide input for integration).

S. Zelepoukine CMS Electronics Temperature Safety System (TSS) TSS (VINCA, Belgrade): Preparing for SM0, SM1. (to be defined: exact sensor location, probe construction) The same functionality as at M0’ (interlocks). RBFE based board — testing is in progress in Belgrade.

S. Zelepoukine CMS Electronics Temperature Safety System (TSS) Prototype PCB is under test — RBFE + multiplexer for 8 channels

S. Zelepoukine CMS Electronics Preshower DCS for Preshower: Preshower DCS will not just cover cooling control and temperature monitoring, but also safety monitoring. NCU Taiwan will take up the DCS for preshower. Manpower: Apollo Go and Chia-Ming Kuo. Started to look into using PLC's (Apollo) and soon PVSS (Ming) Made some cost estimate (Dave Barney) Study of cabling (Piet Wertelaers) Will soon write a specification document (Apollo and Dave)

S. Zelepoukine CMS Electronics Software Software developments (Alison Lister, ETHZ): working on Supervisory System (FSM); HV application; Cooling system application; Plans to implement LV application; studying methods to access non-PVSS database. Igor Lobov just has started with PVSS at IHEP, Protvino.

S. Zelepoukine CMS Electronics Software PVSS Panel for Cooling Unit:

S. Zelepoukine CMS Electronics H4 testbeam 2003 Finishing sensor installation — SM0; testing in Bld.27 (?) Preparing sensor readout (ELMB + CANbus) and PC in H4 Integration of PVSS applications Provide the “PVSS — data acquisition system” interface Support the Endcap EE0’ tests in H4 — use same setup (?)

S. Zelepoukine CMS Electronics Bld.867, DCS lab, other activities A setup needs to be defined to support DCS related activities in Bld.867 (all sensors must be verified for proper operation after installation). PC/PVSS + ELMB ? DCS lab is now existing! Bld.892-R-B11 Concentrate all hardware related work there (probe production, testing, readout electronics testing, sensor calibration, etc.). Sensor database has to be created and maintained.

S. Zelepoukine CMS Electronics Conclusions Sensor installation is close to the final solution (sensor location, probes, cables, connectors) Temperature sensors/probes — preparing for production. Humidity sensors should be selected soon — based on irradiation tests at PSI. Sensor readout still to be defined from several options under consideration and testing (T-MUX, RBFE, Keithley, ELMB). Will concentrate on readout and CMS integration after the sensor installation work on SM0 is completed. Software developments — good progress.

S. Zelepoukine CMS Electronics Backup slides

S. Zelepoukine CMS Electronics Temp.probes in cooling pipes F.Mossiere, EST/ME

S. Zelepoukine CMS Electronics Temp.probes in cooling pipes F.Mossiere, EST/ME

S. Zelepoukine CMS Electronics Temp.probe : finite element model 0.06 mK

S. Zelepoukine CMS Electronics Temp.probe : finite element model