RAD hardening Half of dual HV supply or quarter of quad HV supply w breakout Output connector Input connector Ion Pump: RAD area Standard cable RAD-hard.

Slides:



Advertisements
Similar presentations
Mechanical advantage, Efficiency and WO WI
Advertisements

Rest Duration Ms. Delgados Music Class. Rest Duration A Whole Rest receives four full beats.
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
TM Revision 0.2 Hilmi Ortadeveci Custom Engineering January 31, 2000 MTD Project.
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Voltage divider HV - 2Kv supply HX Nozzle Turbo Pump TOF Tube Focus lens MCP Detector Oscilloscope Computer EXT Excimer Laser One Shot Cycle Input Output.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
ION PUMP HVFT / Connectors
Comparison of cooling services at barrel end Description SCT Barrel Upgrade ID barrel one end one end Total number of staves/rows 176 Staves/rows serviced.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
Try describing the angle of the shaded areas without using degrees.
Operational Amplifier (op-amp) Positive power supply (+12V) Negative power supply (-12V) Inverting input Non-inverting input Non-inverting input (V+)
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
DOM MB Status October 14, 2003 Gerald Przybylski Lawerence Berkeley National Laboratory GTPrzybylski 20/14/03 LBNL.
University of Minnesota Unmanned Aerial Vehicle Research Lab Common Harness Wiring Instructions.
Photos of Rig. The FRB Stack The FRBs The SiPMs The PotentiometersDry Air Tube Cooling Pad Fixel Trigger Board FRB to BBB Ribbon Cables.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Itzhak Tserruya, BNL, Aug. 11, Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.
LUCID services G Avoni - D. Caforio LUCID BOLOGNA meeting1 Main topics: HV scheme (additional connections in pocket) Temperature probes New.
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
ION PUMPS By: Nima Moghimian. Why pump? Why vacuum? What is a good vacuum?
Math – What is a Function? 1. 2 input output function.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
January 15, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
ISUAL HIGH VOLTAGE SUPPLIES P.BERG. CDR 9 JULY 20012NCKU UCB Tohoku High Voltage Supplies P. Berg HIGH VOLTAGE P0WER SYSTEM OVERVIEW HIGH VOLTAGE IS REQUIRED.
1/12/2010 R. CIARANFI 1 NEW NINO BOARD FOR RICH OLD AND NEW LOGISTIC NEW BOARD DESCRIPTION NEW MODULARITY 32 CH NEW FORM FACTOR FRONT END AREA AND DAQ.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Move 2 racks G16-RR2-4 G16-RR2-3. G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT 8 G15-PP-01 CKT Power Feed.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Telecommunications JBCardenas © 1982 Com3 4Q1516 Antenna Design JBC © 198 v A2,2 Key design requirements 1.Undertake the theoretical computations of shapes.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Application Examples – (C)WDM Fiber Accessories Riedel solutions for broadcast applications 1 Application Examples – (C)WDM Fiber Accessories.
I/O INTERFACES DL 153 MIDAS NAME MODEL 제조사
I/O Interfaces DL 32 MIDAS NAME MODEL 제조사 I/O Interfaces
Rectifiers, Filters and Regulator
Battery concept Single battery electrical system
SMPS.
ECAL Front-end development
STAGE I/O BOX DL 16 MIDAS NAME MODEL 제조사 I/O Interfaces
Construction and Commissioning of Electronic Test Benches
Business Process Modelling
Electronics for RPC Upscope
Products.pdf Karatsuba, Toom-Cook not used much
Introduction to the OP AMP
Tutorial on the Ortec 935 Quad Constant Fraction Discriminator
LST Module Installation
Common Diode Applications
Наташа Ћирић.
Introduction to the OP AMP
مدل زنجیره ای در برنامه های سلامت
فرق بین خوب وعالی فقط اندکی تلاش بیشتر است
HCAL HV splice box.
Testing of the EMCO Prototype Boards
Function Notation “f of x” Input = x Output = f(x) = y.
Number Systems and Circuits for Addition
Digital and Analogue Sensing
One quarter of RFQ vessel + vacuum pumps and supports
UXC55 ME Muon Endcap On Detector Layout
Ms. Delgado’s Music Class
Digital and Analogue Sensing
Emergency Communications Portable J-Pole Construction
Functions What is a function? What are the different ways to represent a function?
Presentation transcript:

RAD hardening Half of dual HV supply or quarter of quad HV supply w breakout Output connector Input connector Ion Pump: RAD area Standard cable RAD-hard cable Ion Pump: non- RAD area

Notes 1.The Standard cable is the long cable from the rack-mounted HV supply to the area near the ion pump; it is plenum rated. 2.Where RAD-hard is not a requirement, the short segment is not used; alternatively, a full length RAD-hard cable can be used.

Break-out Half of dual HV supply or quarter of quad HV supply w breakout Ion Pump Standard HV cable Direct-to-pump using controller-provided break-out

Break-out Half of dual HV supply or quarter of quad HV supply w/o breakout Ion Pump Standard HV cable 1:2 Breakout Box Indirect-to-pump using inline break-out box