Agata Week – LNL 14 November 2007 Global Readout System for the AGATA experiment M. Bellato a a INFN Sez. di Padova, Padova, Italy.

Slides:



Advertisements
Similar presentations
ATCA LLP CARRIER BLOCK DIAGRAMS LAST UPDATE 09/05/2007.
Advertisements

ATCA LLP CARRIER BLOCK DIAGRAMS LAST UPDATE 09/05/2007.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
ESODAC Study for a new ESO Detector Array Controller.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Coupling an array of Neutron detectors with AGATA The phases of AGATA The AGATA GTS and data acquisition.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
Trigger-less and reconfigurable data acquisition system for J-PET
Shelf Management & IPMI SRS related activities
Uli Schäfer 1 FPGAs for high performance – high density applications Intro Requirements of future trigger systems Features of recent FPGA families 9U *
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
PCIe based readout U. Marconi, INFN Bologna CERN, May 2013.
5 Feb 2002Alternative Ideas for the CALICE Backend System 1 Alternative Ideas for the CALICE Back-End System Matthew Warren and Gordon Crone University.
K. Honscheid RT-2003 The BTeV Data Acquisition System RT-2003 May 22, 2002 Klaus Honscheid, OSU  The BTeV Challenge  The Project  Readout and Controls.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
Silicon Building Blocks for Blade Server Designs accelerate your Innovation.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
AGATA Pre-processing team report AGATA Week, July 2008.
SLAC Particle Physics & Astrophysics The Cluster Interconnect Module (CIM) – Networking RCEs RCE Training Workshop Matt Weaver,
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
Ancillary Detectors Working Group Agata Week/GSI, 23 Feb Integration of ancillaries with DAQ Goal Context Specifications, modes Design Schedule &
Pulsar II Hardware Overview Jamieson Olsen, Fermilab 14 April 2014
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
Wolfram KORTEN, JRA-02 AGATAEURONS PCC-Meeting, Mainz (Germany), April 2006 Status of the AGATA project Recent developments Milestones and deliverables.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Communication in ATCA-LLRF System LLRF Review, DESY, December 3rd, 2007 Communication in.
CKM Data Source System CKM Electronics Group July 2003.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Communication in ATCA-LLRF System Presenter:
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Latest ideas in DAQ development for LHC B. Gorini - CERN 1.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
DATA PROCESSING Working Group Digitisation P. Medina Pre-processing hardware I. Lazarus Pre-processing algorithms W. Gast Global Trigger and SynchronisationM.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Agata Week – LNL 14 November 2007 LLP ATCA Carrier Status M. Bellato on behalf of the LLP Carrier Working Group.
 Digitisation P.Medina  Pre-processing I.Lazarus GTSM.Bellato GTSM.Bellato  PSA P.Desesquelle R.Gernhäuser 7 th AGATA Week, Uppsala, July 8-11, 2008.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
XLV INTERNATIONAL WINTER MEETING ON NUCLEAR PHYSICS Tiago Pérez II Physikalisches Institut For the PANDA collaboration FPGA Compute node for the PANDA.
TPC electronics Status, Plans, Needs Marcus Larwill April
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ROM. ROM functionalities. ROM boards has to provide data format conversion. – Event fragments, from the FE electronics, enter the ROM as serial data stream;
Consideration of the LAr LDPS for the MM Trigger Processor Kenneth Johns University of Arizona Block diagrams and some slides are edited from those of.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
ROD Activities at Dresden Andreas Glatte, Andreas Meyer, Andy Kielburg-Jeka, Arno Straessner LAr Electronics Upgrade Meeting – LAr Week September 2009.
ATCA LLP CARRIER BLOCK DIAGRAMS LAST UPDATE 20/12/2006 ISOCRATE R.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
M. Bellato INFN Padova and U. Marconi INFN Bologna
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
Future Hardware Development for discussion with JLU Giessen
TELL1 A common data acquisition board for LHCb
Large Area Endplate Prototype for the LC TPC
uTCA A Common Hardware Platform for CMS Trigger Upgrades
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
VELO readout On detector electronics Off detector electronics to DAQ
ATCA carrier layout 10/100 GTS /SEGMENT Config PLD CORE /SEGMENT
TELL1 A common data acquisition board for LHCb
Presentation transcript:

Agata Week – LNL 14 November 2007 Global Readout System for the AGATA experiment M. Bellato a a INFN Sez. di Padova, Padova, Italy

Agata Week – LNL 14 November 2007 AGATA Experiment: 4  array of HPGe detectors for in-beam  -ray spectroscopy 36 fold segmented crystal + central core contact x 180 Digital electronics and sophisticated Pulse Shape Analysis algorithms Operation of Ge detectors in position sensitive mode  -ray tracking

Agata Week – LNL 14 November 2007 AGATA Readout: Channel per crystal: per crystal Total channel: 6660 Local Level Trigger Central core processing Central trigger processor Global Trigger Global Trigger and Synchronization control system (GTS) Global time reference The design of FE readout and L1 trigger follows a synchronous pipeline model: the data are collected at 100 MS/s and stored in pipeline buffers at the global AGATA frequency waiting the L1 decision

Agata Week – LNL 14 November 2007 Agata Front-end Model

Agata Week – LNL 14 November 2007 Choice of Readout Standard Candidates VME/VXI Past Experience with older detectors Bandwidth limited CompactPCI First version of AGATA Readout electronics Advanced TCA Present version

Agata Week – LNL 14 November 2007 Pros –Very stable –Huge choice of commercial boards –Slave implementation very simple –Wide ecosystem in HEP –Recently extended with serial switched capabilities Cons –Slow readout (max 40-80) Mbytes/s Enhancements (CBLT) not fully standard –Limited power dissipation per slot –Master implementation not trivial –If large estate needed then 9U crates expensive –Limited customizability on the bus –Crate control not standard –No power redundancy -> limited availability VME

Agata Week – LNL 14 November 2007 Pros –Fast ( > 500 Mbytes/s) –Huge choice of commercial boards –Low cost (Telecom standard) –Wide choice of IP cores available for interfacing (both initiator/target) –Extended to serial switched with CPCIExpress –Highly customizable through user reserved backplane connectors Cons –Small estate –Low power dissipation per slot –Low no. of slots per bus without bridging –No standard crate control CompactPCI

Agata Week – LNL 14 November 2007 Pros –Ultra high speed –Multi standard –Big estate / high power per slot –Choice of star or full mesh backplane –Redundant power supply –Standard crate control –Fits perfectly with modern FPGAs/ ASSPs –Gaining momentum in HEP community –Custom deployments can co-exist with standards Cons –Moderate choice of COTS cards on the market –Commercial switches exist only for 1G/10G ethernet Telecom driven Advanced TCA

Agata Week – LNL 14 November 2007 Carrier Readout (1): Main FPGA DP RAM Segment Dual star ATCA network Gigabit Ethernet Switch LLP Carrier PSA Farm

Agata Week – LNL 14 November 2007 Carrier Readout (2): Main FPGA DP RAM Segments Full mesh ATCA network Optical Transceiver PCI Express 2.5 Gbps PCI Express Endpoint LLP Carrier PCI Express optical translator Virtual I/O multiprocessor system

Agata Week – LNL 14 November 2007

Clock Distribution From GTS Tree

Agata Week – LNL 14 November 2007 MGT Clocking Layout RocketIO 101 RocketIO 101 MUX RocketIO 102 RocketIO 102 MUX RocketIO 103 RocketIO 103 MUX RocketIO 105 RocketIO 105 MUX MGTclk M34/N34 MGTclk M34/N34 MGTclk AP28/AP29 MGTclk AP28/AP29 RocketIO 106 RocketIO 106 MUX RocketIO 109 RocketIO 109 MUX RocketIO 110 RocketIO 110 MUX RocketIO 112 RocketIO 112 MUX RocketIO 113 RocketIO 113 MUX MGTclk AP3/AP4 MGTclk AP3/AP4 MGTclk J1/K1 MGTclk J1/K1 RocketIO 114 RocketIO 114 MUX ATCA FABRIC CH1-CH2 ATCA FABRIC CH3-CH4 ATCA FABRIC CH5-CH6 ATCA FABRIC CH7-CH8 ATCA FABRIC CH9-CH10 ATCA FABRIC CH11-CH12 USER SFP TRANSCEIVER RTM PCI EXPRESS LANE0 RTM PCI EXPRESS LANE5 RTM PCI EXPRESS LANE1 RTM PCI EXPRESS LANE2 100  250MHz PCI Express JITTER ATTENUATOR 100  250MHz PCI Express JITTER ATTENUATOR 200MHz GTS Clock 200MHz GTS Clock (**) The ATCA FABRIC channels are routed from CHANNEL1 to CHANNEL12 by switches (***) User SFP could be used as 1GEnet or PCIExpress DAQ without FABRIC RTM PCI EXPRESS LANE3 RTM PCI EXPRESS LANE4 ABAB ABAB ABAB ABAB ABAB ABAB ABAB ABAB ABAB ABAB INSPECTION PADS 100MHz GTS Clock 100MHz GTS Clock OPTICAL SFP OPTICAL SFP INSPECTION PADS LOCAL 100MHz (EPSON ) LOCAL 100MHz (EPSON ) PHASE LOCKED MGT clocking layout

Agata Week – LNL 14 November V DC ENABLE P3V3-5A 16.5W MEZZANINE 1 MEZZANINE 2 MEZZANINE 3 MEZZANINE 4 MAIN BOARD P3V3-7A 23.1W MAIN BOARD P2V5-7A 17.5W FPGAs CORE P1V2-7A 8.4W FPGA MGT P1V2-4A 4.8W P2V5-1.5A P1V8-0.5A PROMS VCCAUX Fpga 1 VCCAUX MGT P2V5-1.5AVCCAUX Fpga 2 P1V2-0.5A VTTTXs P1V2-0.5AVTTRXs MGT BUFFERSP1V8-6A 10.8W P12V-14.7A 176.7(160.6)W P3V3-5A 16.5W M48V-4.0A 194.4(176.7)W DC-DC Efficency is estimated at least 90% ATC210 (210W) P3V3_BOOT 4x LTM W 6x LTM W P5V0-6A 30W Carrier Power Supply

Agata Week – LNL 14 November M x 18 true dual port 100/200 MHZ 800Mb/s LVDS streaming on data channels Equalized and filtered distribution of 200MHZ GTS clock 1 PCI Express/ GE optical link 15 x Full mesh connectivity on the backplane Pervasive I2C bus for slow controls 200W power supply Multiple options for data readout Carrier main features

Agata Week – LNL 14 November 2007 Final Routing (as of april 07)

Agata Week – LNL 14 November 2007 Power and Signal Integrity Simulations

Agata Week – LNL 14 November 2007 Example Resonant mode between L6pwr/L11gnd

Agata Week – LNL 14 November 2007

CH-15 Eye Diagram with Equalization

Agata Week – LNL 14 November 2007 Int *ATCA0 = 0xfe001000; // DPRAM on board 0 Int *ATCA1 = 0xfe002000; // DPRAM on board 1 …. Fragment0 = memcpy(buffer0, ATCA0); Fragment1= memcpy(buffer1, ATCA1); PCI Express Readout Test