Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.

Slides:



Advertisements
Similar presentations
Project update: Dec 2009-June 2010 Sally Baden, Project Manager, June 28.
Advertisements

2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Constitution Revision Brian Dodd Brasov, Sept 2007.
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
PROJECT RISK MANAGEMENT
K-12 Obesity Prevention Grants Quarter 2 Grantee Webinar December 12, – 3:30 pm Lauren Kelsey School Grants Manager Alaska Obesity Prevention &
Action Plan Mr. Ahmed Zaki Uddin Mathematics O-Level.
1 What’s New in the Therapy Prior Authorization Review Process? December 2011 Therapy Clinical Webinars.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
Trust Programme Board 15 July Transforming Services Key Programme Status 2 Key Risks and Issues 4 Key Benefits & Measures 3 Summary status 1 Risk/IssueMitigating.
Portal User Group Meeting September 12, Agenda 1.Welcome 2. Updates on the Following: 1.Migration Status 2.Template 3.Disaster Recovery Exercise.
History/Government/Social Studies Update December 15, 2011 Don Gifford History/Government/Social Studies.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
CONNECT WITH CAEP | Timeline for Accreditation Handbook and Early Adopters Stevie Chepko, Sr., VP.
Your High-Level Overview of the Components Provided by ESP Solutions Group Disaster Prevention and Recovery.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
January 8, 2009 TAC Texas Nodal Program Implementation: P rogram Update Ron Hinsley.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
Haverford Honor Council Trial Procedure Flow Chart Written by: Zach Rosenthal ‘14 Honor Council Involvement 1.Honor Council is notified of a potential.
Serious Accident Investigation REPORTS. Lesson 12 Objectives Use a template to correctly fill out a 24-Hour Preliminary Report and list all the steps.
ASC X12 CHAIR REPORT Kendra L. Martin, ASC X12 Chair February 8, 1999.
Library Services CDRS Requirements Report February 9, 2001.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Three State Data Warehouse 1 Cassie Archuleta Tom Moore May 6, 2014 Progress Update for 3SDW Development.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Northeast Cumulative Effects Assessment and Management Pilot Project Introduction October 2013.
Text #ICANN51 GAC / GNSO Joint Meeting 12 October 2014.
Presentation on amendment of money bills National Treasury 6 August 2008.
Preparing for Winter 2011/12 Guidance Overview Stuart Low Planning Manager Scottish Govt NHSScotland Business & Performance Mgt Team.
Introducing Project Management Update December 2011.
The Family Institute Learning Community * Plans / Activities for Remainder of 2014 *
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
Segment 6: Provider Communication California ICD-10 Site Visit Training segments to assist the State of California with the ICD-10 Implementation June.
E-PRTR dataflow management Introduction and informal review process Eva Goossens Head of Industrial Pollution Group Air and Climate Change Programme.
Introduction to policy briefs What is a policy brief? What should be included in a policy brief? How can policy briefs be used? Getting started.
Text #ICANN51. Text #ICANN51 GNSO Briefing on Key Strategic Initiatives 12 October 2014.
Professional Learning Communities Board Update February 2012.
Web Advisory Committee Overview CMS Project Status Update Major work underway Timelines (high level) Blogging capability Events-calendar capability.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Northern Lincolnshire Healthy Lives Healthy Futures Programme Programme Update for North East Lincolnshire Partnership Board 12 September 2013.
Update on Chesapeake Bay Program Developments Briefing to the Water Resources Technical Committee October 9, 2009 (revised) Briefing to the Water Resources.
Update to NLAG board 22 nd December Sep Jan MCE Workforce and OD Oct Nov Dec IM&T Estates Finance In hospital Model Out of hospital Model Progress.
Jessica Whisher-Hehl. Goals for the video Share information regarding the draft NYSSLS Provide a shared understanding to facilitate collegial discussions.
NSDI Strategic Plan Update August NSDI Strategic Plan – Purpose/Scope Purpose: Develop a concise, updated strategic plan to guide the Federal government’s.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
UPDATE REGARDING PW ADMIN BUILDING NOVEMBER 2, 2015.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
Page 1 Enterprise Data Warehouse Project Executive: Barbara Chmielewski Project Manager: Anita Sharma.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Cathi Fredricks and Dr Ken Powell Canterbury Christ Church University
TeamBudget Update
Update from the Local Authority
M&E Task Force Meeting
IDN Variant TLDs Program Update
All Wales Safeguarding Procedures Review Project
Update to NLAG board 24th November 2015
Revised engagement approach for draft GTAC
Multi-server Namespace in NFSv4.x Previous and Pending Updates
Next Steps Advisory group debrief call Circulate meeting summary
TIBC Budget Formulation Improvement Project
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
Street Manager High-level roadmap
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Presentation transcript:

Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential impact on the timeline. We are currently proceeding on the original scenario for completing the draft for public release on Dec 1 (Scenario #1). There are several key points in the next two months to check on progress and allow for a decision to shift to timeline scenario two or three if needed. Request to the NCADAC: Delegation of authority to the Chairs, in consultation with the Executive Secretariat, to evaluate progress on the draft and decide (on behalf of the NCADAC) to shift to timeline scenario two or three as needed. Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential impact on the timeline. We are currently proceeding on the original scenario for completing the draft for public release on Dec 1 (Scenario #1). There are several key points in the next two months to check on progress and allow for a decision to shift to timeline scenario two or three if needed. Request to the NCADAC: Delegation of authority to the Chairs, in consultation with the Executive Secretariat, to evaluate progress on the draft and decide (on behalf of the NCADAC) to shift to timeline scenario two or three as needed Draft Report Completion Timeline

By Sept 27 New draft ready for review Many showstoppers are being addressed References near final, formatted Chapter linkages underway (within & between chapters) RIT issues addressed All traceable accounts in a consistent format By Sept 27 New draft ready for review Many showstoppers are being addressed References near final, formatted Chapter linkages underway (within & between chapters) RIT issues addressed All traceable accounts in a consistent format By Sept 5 New draft ready for review. All chapters have a passing grade. 15 chapters are in GOOD shape. Most RIT issues in most chapters are implemented Introduction is drafted Executive summary and report findings are drafted By Sept 5 New draft ready for review. All chapters have a passing grade. 15 chapters are in GOOD shape. Most RIT issues in most chapters are implemented Introduction is drafted Executive summary and report findings are drafted By Oct 29 New draft ready for review by NCADAC All first round showstoppers addressed Most 2 nd round showstoppers addressed preliminary copy edit References final Linkages across report complete Traceable accounts are edited and consistent By Oct 29 New draft ready for review by NCADAC All first round showstoppers addressed Most 2 nd round showstoppers addressed preliminary copy edit References final Linkages across report complete Traceable accounts are edited and consistent 2012 Draft Report Completion Timeline Scenario #1: draft sent to NRC and public Dec 1 NCADAC webinars Sept Sectoral focus Showstoppers are reasonable and implementable NCADAC webinars Oct 2-8 Regional focus Showstoppers are reasonable and implementable FINAL NCADAC webinars Nov 5-7 NCADAC meeting Nov consensus adoption of the draft No additional issues Remaining editing Nov 17 – Nov 29, minor copyediting and uploading to web review system. DEC 1 Release to NRC and Public DEC 1 Release to NRC and Public ✓✓ DECISION POINT: TIMELINE Co-chairs meet Sept Review showstoppers DECISION POINT: TIMELINE Co-chairs meet Oct Review showstoppers DECISION POINT: TIMELINE Co-chairs call Nov 8. Review status By Nov 9 Final report is available to NCADAC All issues addressed By Nov 9 Final report is available to NCADAC All issues addressed

By Sept 27 New draft ready for review Many showstoppers are being addressed References near final, formatted Chapter linkages underway (within & between chapters) RIT issues addressed All traceable accounts in a consistent format By Sept 27 New draft ready for review Many showstoppers are being addressed References near final, formatted Chapter linkages underway (within & between chapters) RIT issues addressed All traceable accounts in a consistent format By Sept 5 New draft ready for review. All chapters have a passing grade. 15 chapters are in GOOD shape. Most RIT issues in most chapters are implemented Introduction is drafted Executive summary and report findings are drafted By Sept 5 New draft ready for review. All chapters have a passing grade. 15 chapters are in GOOD shape. Most RIT issues in most chapters are implemented Introduction is drafted Executive summary and report findings are drafted By Oct 29 New draft ready for review by NCADAC MOST first round showstoppers addressed MANY 2 nd round showstoppers addressed preliminary copy edit References final Linkages across report complete Traceable accounts are edited and consistent By Oct 29 New draft ready for review by NCADAC MOST first round showstoppers addressed MANY 2 nd round showstoppers addressed preliminary copy edit References final Linkages across report complete Traceable accounts are edited and consistent 2012 Draft Report Completion Timeline Scenario #2: draft sent to NRC Dec 1, public Dec 20 NCADAC webinars Sept Sectoral focus DECISION POINT: TIMELINE Co-chairs meet Sept Review showstoppers NCADAC webinars Oct 2-8 Regional focus DECISION POINT: TIMELINE Co-chairs meet Oct Review showstoppers FINAL NCADAC webinars Nov 5-7 NCADAC meeting Nov Consensus adoption of the draft, PENDING MINOR EDITS No significant remaining issues But minor edits may still be needed Nov 17 - Dec 19. minor edits, copyediting and uploading to web review system. DEC 1 Release to NRC with note regarding minor remaining issues DEC 20 Release to public with all remaining minor issues addressed Update draft for NRC DEC 1 Release to NRC with note regarding minor remaining issues DEC 20 Release to public with all remaining minor issues addressed Update draft for NRC Showstoppers are difficult and/or numerous (preventing time spent on minor issues) ✓ DECISION POINT: TIMELINE Co-chairs call Nov 8. Review status By Nov 9 Near-Final Report is available to NCADAC By Nov 9 Near-Final Report is available to NCADAC Showstoppers are reasonable and implementable ✓

IMPACT OF SCENARIO 2: Pros: NRC review- 3 month review period still begins Dec 1. No schedule delays Consensus can still be requested at NCADAC meeting Nov 14 Allows non-showstopper minor edits to be undertaken in an extra 3 weeks before public release Cons: Following NCADAC meeting (Nov 14-15), public will not have access to public review system until late Dec Public review period will be condensed from 3 months to 2+ months Public engagement events in early Dec will not have access to online public review system until late in the month IMPACT OF SCENARIO 2: Pros: NRC review- 3 month review period still begins Dec 1. No schedule delays Consensus can still be requested at NCADAC meeting Nov 14 Allows non-showstopper minor edits to be undertaken in an extra 3 weeks before public release Cons: Following NCADAC meeting (Nov 14-15), public will not have access to public review system until late Dec Public review period will be condensed from 3 months to 2+ months Public engagement events in early Dec will not have access to online public review system until late in the month 2012 Draft Report Completion Timeline Scenario #2: draft sent to NRC Dec 1, public Dec 20

By Sept 27 New draft ready for review Many showstoppers are being addressed References near final, formatted Chapter linkages underway (within & between chapters) RIT issues addressed All traceable accounts in a consistent format By Sept 27 New draft ready for review Many showstoppers are being addressed References near final, formatted Chapter linkages underway (within & between chapters) RIT issues addressed All traceable accounts in a consistent format By Sept 5 New draft ready for review. All chapters have a passing grade. 15 chapters are in GOOD shape. Most RIT issues in most chapters are implemented Introduction is drafted Executive summary and report findings are drafted By Sept 5 New draft ready for review. All chapters have a passing grade. 15 chapters are in GOOD shape. Most RIT issues in most chapters are implemented Introduction is drafted Executive summary and report findings are drafted 2012 Draft Report Completion Timeline Scenario #3: draft delayed to NRC & public: Jan 5 NCADAC webinars Sept Sectoral focus NCADAC webinars Oct 2-8 Regional focus FINAL NCADAC webinars Nov 5-7 NCADAC call to request consensus Dec 19th Dec remaining copyedits, upload to web system Showstoppers are difficult and/or numerous Remaining showstopper issues (have not been dealt with or newly identified) Jan 5 Release to the NRC and public Jan 5 Release to the NRC and public NCADAC meeting Nov No consensus on the draft requested Further discussion on remaining issues DEC 12 Final draft available to NCADAC DEC 12 Final draft available to NCADAC ✓ DECISION POINT: TIMELINE Co-chairs meet Sept Review showstoppers DECISION POINT: TIMELINE Co-chairs meet Oct Review showstoppers DECISION POINT: TIMELINE Co-chairs call Nov 8. Review status By Oct 29 New draft ready for review by NCADAC MOST first round showstoppers addressed SOME 2 nd round showstoppers addressed preliminary copy edit References final Linkages across report complete Traceable accounts are edited and consistent By Oct 29 New draft ready for review by NCADAC MOST first round showstoppers addressed SOME 2 nd round showstoppers addressed preliminary copy edit References final Linkages across report complete Traceable accounts are edited and consistent Showstoppers are reasonable and implementable ✓

IMPACT OF SCENARIO 3: Pros: Major issues with draft are addressed Cons: Possible lack of staff availability over holidays for final work on draft Following NCADAC meeting (Dec 19), public will not have access to public review system until early Jan Public review period will be condensed from 3 months to 2+ months Overall timeline is shifted back a month or more. There may be an impact on the timing of release of NCA synthesis report in 2013 – may move to early 2014 Need to reschedule NRC meeting for early Jan Public engagement events in Dec will not have access to online public review system IMPACT OF SCENARIO 3: Pros: Major issues with draft are addressed Cons: Possible lack of staff availability over holidays for final work on draft Following NCADAC meeting (Dec 19), public will not have access to public review system until early Jan Public review period will be condensed from 3 months to 2+ months Overall timeline is shifted back a month or more. There may be an impact on the timing of release of NCA synthesis report in 2013 – may move to early 2014 Need to reschedule NRC meeting for early Jan Public engagement events in Dec will not have access to online public review system 2012 Draft Report Completion Timeline Scenario #3: draft delayed to NRC & public: Jan 5