H.TauregTB December 20041 B-Field Mapping. H.TauregTB December 20042 Schedule Install equipment: May 2005 Start mapping: mid June 2005 Finish mapping:

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

1 1 Slide © 2006 Thomson South-Western. All Rights Reserved. Slides prepared by JOHN LOUCKS St. Edwards University.
Chapter 13 Project Scheduling: PERT/CPM
Chapter 9 Project Scheduling: PERT/CPM
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edwards University.
First Floor Plan Description – First Floor: Library - Two story plus mezzanine Main library on the second floor Office/support spaces on the first fl.
1 1 Slide © 2004 Thomson/South-Western Chapter 12 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 1 Slide © 2009 South-Western, a part of Cengage Learning Slides by John Loucks St. Edward’s University.
Example: Frank’s Fine Floats
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
The CERN-JINR Collaboration J. Engelen March 27, 2006.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Chapter 10 Project Scheduling: PERT/CPM
1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM Project Scheduling with Known Activity Times Project Scheduling with Known.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
MONALISA installation at the ATF2 ATF2 weekly meeting.
12 th U.S. & North America Ventilation Symposium June 2008 Ventilation On Demand (VOD) Auxiliary Fan Project Auxiliary Fan Project D. O’Connor, Sr. Ventilation.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
R.O.M.P Robot Orientation Mapping Project Team Evolution Peri Subrahmanya: Lead Designer Michael Lazar: Project Manager Sean Hogan: Lead Designer Joe Hackstadt:
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Earthquake Recovery Programme Pre-Synod Archdeaconry Meetings June – August 2015.
1 1 Project Scheduling PERT/CPM Networks. 2 2 Originated by H.L.Gantt in 1918 GANTT CHART Advantages - Gantt charts are quite commonly used. They provide.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
1 1 Slide © 2005 Thomson/South-Western Chapter 10 Project Scheduling: PERT/CPM n Project Scheduling with Known Activity Times n Project Scheduling with.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Compressor status AWAKE Technical Board meeting 19 August 2015.
Folder Map Project A semester-long project.. Get Started 1. Some of the folders come with a label. If your folder has a label, refold the label so it.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
PPT - 1 Microscope Skills.
H.TauregTechnical Forum June B and T monitoring News on B field mapping B field monitoring Temperature monitoring.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Project Management Planning Techniques
Resource Loading and Leveling Kathy S. Schwaig. A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze.
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Part II Lecture 11B.
MATERIAL PRICE EXAMPLES – US Distributor only SoundScapes  Shapes US DST Material Price 4x4 White: $204 4x4 Color: $262 US DST Material Price 4x6 White:
Managing Overflow Work There is always work to be done in a law firm. Just ask your full-time paralegals! Maybe your budget will not support hiring another.
Studying Perceptual Interactions among Visualization Methods … in the snow!
8-1 Example: Frank’s Fine Floats Frank’s Fine Floats is in the business of building elaborate parade floats. Frank and his crew have a new float to build.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
The reading is 7.38 mm. The reading is 7.72 mm.
Welcome to The Learning Grid Open 24 / 7 over the vacation period Welcome to The Learning Grid Open 24 / 7 over the vacation period.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
Bond Oversight Committee
The LHCb Installation Story
AWAKE e-spectro update
CLEX* Status and Plans CTF3 complex CLEX
Expedition and Route Planning.
Hire Toyota Innova in Delhi for Outstation Tour
Sally K. Ride By: Alaxandria Lackey.
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Searching for GRB-GWB coincidence during LIGO science runs
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Minuteman Vocational Technical Regional High School Progress
ERE653 Final Project Saratoga State Parks Comfort Stations December 2, 2008 Kalpesh Parikh Process The bid and schedule for this project were created utilizing.

Period 2 Question 1.
Naval Complexes Meeting August 20, 2018
Team:Med Nepal Trip 2012.
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Using Data to Understand How Computer Labs Are Used Across Campus
Operational Update 1.
2015 January February March April May June July August September
Presentation transcript:

H.TauregTB December B-Field Mapping

H.TauregTB December Schedule Install equipment: May 2005 Start mapping: mid June 2005 Finish mapping: August 2005, latest

H.TauregTB December Mapping programme L3 and dipole at two polarities –Only ++ and -- combination L3 at 0.2 and 0.5 Tesla –Dipole powered always at same level L3 alone –At 0.2 and 0.5 Tesla and both polarities In L3 –Space Frame volume –EMC, HMPID, PHOS volume

H.TauregTB December Grid size Dipole –80 mm in x, y, z L3 –100 mm in r and z –2° in φ for r > 2 m –4° in φ for r < 2 m

H.TauregTB December Grid size Fine grid as above Coarse grid –Increase step size by factor 3 In φ and z for L3 In z for dipole

H.TauregTB December Mapping scheme

H.TauregTB December Mapping work Continuous, 24 h / 24 h Team of at least 3 Set up changes during normal working hours Time estimate to be worked out

H.TauregTB December Hardware Support structure to be adapted for dipole Support structure to be adapted for L3 Measuring arms to be constructed for L3