MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine.

Slides:



Advertisements
Similar presentations
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
General idea of a couple of check rod system and adjustments
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
MICE – Moving Platform Engineering solution –A proposal 16/02/2011Norbert Collomb1.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MOM Report Galina Vankova RAL, MICE Video Conference.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
PRY Implementation - Contents l Fit with Experimental Devices (& services connections) l Fit with Tracker Cryo l Fit with Floor & Trench l Fit with Mezzanine.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
Staircase Civil Engineering Drawing Department of Civil Engineering
MICE CM28 Engineering Session Summary (On behalf of Wing)
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Outcome of the Review and Response to Recommendations
Solenoid Yoke Door-Barrel Connection
MICE Partial Return Yoke Mechanical Design
Step IV PRY Preparation - Contents
MICE CM31 Schedule summary
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Senad Kudumovic Design engineer
Presentation transcript:

MICE Integration Engineering Jason Tarrant - STFC l Contents »Device Interfaces – General »AFC »Spectrometer Solenoids »RFCC »EMR / KL »South Mezzanine (summary)

MICE Integration Engineering l Device Interfaces - General MICE centre to grouted in plate = 1649 mm -120 mm, rolling platform mm, base to centre = 14 mm min shim Shim to take up height and clocking (rotation) deviations

MICE Integration Engineering l AFC »Geometry –Tesla support system modifications = suspension system turrets changed (model received 3/7/11) 1534! Asked to change back to 1515

MICE Integration Engineering l AFC »Geometry –Hydrogen Safety Vacuum Line clash with South Mezzanine Old floor height Raised floor height

MICE Integration Engineering Clash with rails Clash with support leg AFCs not shown so vacuum pipe run can be seen

MICE Integration Engineering Beams cut back Support leg moved to next beam Raised & narrowed floor section (removable but H system parts temporarily moved) Cut required in floor panel around vacuum pipe

MICE Integration Engineering l Spectrometer Solenoid »Interface with rolling platforms Mismatch with latest model

MICE Integration Engineering l Spectrometer Solenoid »Interface with rolling platforms Bolted Interface with adjustment?

MICE Integration Engineering l Spectrometer Solenoid »Geometry Rotate for convenience? Port close to mezzanine

MICE Integration Engineering l Spectrometer Solenoid »Geometry Brackets not align with latest model

MICE Integration Engineering l RFCC Ports to be moved? Services tray to be moved Mezzanine to be shortened locally & raised (poss. whole length to prevent trip hazard? 1m walkway (0.8m min)

MICE Integration Engineering l RFCC Ports to be moved to opposite side Services tray replacement (need water pipe move) Mezzanine narrowed & raised at front Width of walkway < 800mm (localised) Gas panel

MICE Integration Engineering l RFCC

MICE Integration Engineering l EMR

MICE Integration Engineering l Mezzanine & EMR Beams cut back Floor plates removed Hydrogen frame clash (work postponed)

MICE Integration Engineering l Mezzanine & EMR Potential clash With support pillars June 2011 Step V Step VI Step IV Support legs moved Beams cut back Removable floor section

MICE Integration Engineering l South Mezzanine change summary »Move 4 of 5 support legs to another beam »Fit cross beam between support legs to support intermediate beams before cutting intermediates »Fit removable platform sections spanning between support leg beams –Higher & narrower than current mezzanine (avoids RFCC & AFC pipe line) –Outer beam = kick plate –Rail with dog leg fitted to outer beam

MICE Integration Engineering l South Mezzanine change summary

MICE Integration Engineering l South Mezzanine change summary Hydrogen supply Existing mezzanine Moved supports Cut beams Removable sections Fixed cross beam (supports Intermediate beams)

MICE Integration Engineering l South Mezzanine change summary

MICE Integration Engineering l South Mezzanine – Before change! »Is the narrow walkway acceptable for safety? »Can the H system frame & pipes be raised to give headroom? » »Is the raised floor compatible with the hydrogen racks? »What needs to be installed / moved along the mezzanine walkway? Is it compatible? »Structurally OK? Can H system frame / pipes be temporarily re- moved to move platforms?