WELL DRILLING AND CONSTRUCTION Ken Bousfield, P.E. Utah Division of Drinking Water
BASIS FOR RULES: – Same as for springs: n Plan review (Primacy) n Engineering principles n Experience
PLAN REVIEW PROCESS: – Prior to Drilling n Drilling Specifications – After Drilling n Chemical Analysis n Source Capacity n Source Protection n Equipping Specifications
WELL DRILLING SPECS: – Drilling Method – Surface Seal – Plumbness and Alignment – Construction Materials
WELL EQUIPPING: – Type of Pumps – Pitless Adaptors – Pump Capacity – Appurtenant Equipping – Well House Construction
Well System
WELL GROUTING:
SUBMERGED WELL:
PITLESS ADAPTOR:
CONVERTED SUBMERGED WELL:
WELL HOUSE PIPING:
WELL HOUSE CONSTRUCTION: – Heating – Ventilation – Drainage – Treatment
STORAGE CAPACITY ISSUES: – Average Day Use in gallons (gal) n Residence: 400gal n Picnic/Park: 5gal/person n Visitor’s Center: 5gal/person n Campground Hydrant: 35gal/person – ADD FIRE FLOW TO VOLUMES
DISTRIBUTION CAPACITY ISSUES: – Peak Instantaneous Use n Engineering Hydraulic Network Analysis n 20 psi minimum pressure under all conditions