24-28.09.2007,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V.

Slides:



Advertisements
Similar presentations
WP 5 Safety and Transient Analysis Task 5.6 Containment and source term assessment for the ETDR LEADER Lead-cooled European Advanced DEmonstration Reactor.
Advertisements

11-Apr ISOE International ALARA Symposium JNES, Tokyo, JAPAN, August,2013 Presentation on: Dose Reduction and Management during Overhauling.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Primary Water Chemistry
TECHNIQUES AND RESULTS OF EXAMINATION OF FISSION PRODUCT RELEASE FROM VVER FUEL RODS WITH ARTIFICIAL DEFECTS AND A BURNUP OF ~60 MWd/kgU AT THE MIR LOOP.
Lesson 18 - Decay Heat DEFINE the term decay heat. Given the operating conditions of a reactor core and the necessary formulas, CALCULATE the core decay.
Exemption, Clearance, Discharges
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
May 2010 FEDERAL SCIENTIFIC PRODUCTION CENTER JSC “Afrikantov OKBM” EFFECTIVENESS EVALUATION FOR THE FAST SODIUM- COOLED REACTOR DESIGN SOLUTIONS AND THEIR.
ACADs (08-006) Covered Keywords Description Supporting Material Accident Analysis
1 WASTE CHARACTERIZATION METHODS S. Vanderperre Belgatom Vanderperre, Belgatom, chapter 7.
Outlook for the Requirements of the Nuclear Power Plant Irradiation Test in China SONG DANRONG Nuclear Power Institute of China.
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
NUCLEAR SAFETY Barbora Svobodová Angličtina-odborná II.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
EPR-Public Communications L-03 Types of Radiation Emergencies and Communicating Safety.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
FAST NEUTRON FLUX EFFECT ON VVER RPV’s LIFETIME ASSESSMENT
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
1 17 th Symposium of AER on VVER Reactor Physics and Reactor Safety September 24-29, 2007, Yalta, Crimea, Ukraine FUEL PERFORMANCE AND OPERATION EXPERIENCE.
Complex Approach to Study Physical Features of Uranium Multiple Recycling in Light Water Reactors A.A. Dudnikov, V.A. Nevinitsa, A.V. Chibinyaev, V.N.
MODULE “PROJECT MANAGEMENT AND CONTROL” RADIATION PROTECTION SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
MANAGEMENT OF DAMAGED SNF HANDLING OPERATIONS AT PAKS NPP Е.А. Zvir, V.P. Smirnov Research and Development Company “Sosny”, Moscow, Russian Federation.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Priority Programs of the Nuclear Power Industry Branch of Russia Vladimir Asmolov 17 th Symposium of AER on VVER Reactor Physics and Reactor Safety
Experience of fuel operation at Russian NPPs N.M. Sorokin, Yu.V. Kopyov, V.E. Khlentsevich, А.К. Egorov N.M. Sorokin, Yu.V. Kopyov, V.E. Khlentsevich,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Regulatory Approach to Radioactive Waste Management and Remediation in Central Asia Tamara Zhunussova Vienna, IAEA, 6-8 November, 2012.
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
1 RRC KI Reduced leakage 17th Symposium of AER on VVER Reactor Physics and Reactor Safety September 24-29, 2007, Yalta, Crimea, Ukraine ADVANCED FUEL CYCLES.
USE OF THE AXIAL BURNUP PROFILE AT THE NUCLEAR SAFETY ANALYSIS OF THE VVER-1000 SPENT FUEL STORAGE FACILITY IN UKRAINE Olena Dudka, Yevgen Bilodid, Iurii.
KFKI Atomic Energy Research Institute Statistical evaluation of the on line core monitoring effectiveness for limiting the consequences of the fuel assembly.
Natural Convection as a Passive Safety Design in Nuclear Reactors
17th Symposium of AER on VVER Reactor Physics and Reactor Safety, September 2007, Yalta, Crimea, Ukraine INNOVATIONS IN MOBY-DICK CODE Šůstek J.,Krýsl.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
1 State Scientific and Technical Center on Nuclear and Radiation Safety THE THERMAL-MECHANICAL BEHAVIOR OF FUEL PINS DURING POWER'S MANEUVERING REGIME.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Expert Review of the Licensing Documentation of the Centralized Facility for Long-Term Storage of Disused Sealed Radiation Sources Oleksii Tokarevskyi.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
HOW MUCH RADIOACTIVE WASTE COULD POTENTIALLY BE IMPORTED INTO TEXAS
Radiological impacts from nuclear industrial facilities on the public and the environment : Their magnitude and the next 50 years forecast Sylvain Saint-Pierre.
BASIC PROFESSIONAL TRAINING COURSE Module XI Operational limits and conditions Case studies Version 1.0, May 2015 This material was prepared.
2013 ISOE International ALARA Symposium
Module Planned exposure situations Public exposure (GSR Part 3)
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
Pressurized Water Reactor
SAFETY AND SITTING ASSESSMENT FOR NPPs DEPLOYMENT IN INDONESIA
NRC Event Number – Event Date
BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components Version 1.0, May 2015 This material was.
4th ISOE European Workshop on Occupational Exposure Management at NPPs Lyon, France, March 2004 Kirsi Alm-Lytz Radiation and Nuclear Safety Authority.
BASIC PROFESSIONAL TRAINING COURSE Module XIV Surveillance programmes
Current Radiation Protection Legislation in Slovakia
Version 1.0, May 2015 SHORT COURSE
Approaches and measures aimed at ensuring safety, preventing severe accidents in new RF NPP designs Gutsalov N.A. 10/03/2016.
A study on Loviisa NPP (VVER-440) dose rate measurement's ability to detect small primary-to-secondary coolant leaks A. Ketolainen ISOE European Symposium.
XI Конференция по реакторному материаловедению
State Scientific Center– Research Institute of Atomic Reactors
Approaches to Evaluation of Spent Nuclear
Presentation transcript:

,Yalta,17-th Symposium of AER1 IMPACT OF CHANGED FUEL PERFORMANCES ON SAFETY BARRIER EFFECTIVENESS AT NORMAL OPERATION OF NPP WITH VVER A.V. Zhurbenko, Y.M. Semchenkov, P.D. Slavyagin RRC “Kurchatov Institute”

,Yalta,17-th Symposium of AER2 CONTENTS 1. Defence-in-Depth Concept 2. System of Barriers as the Basis for Radiation Safety 3. Factors have influencing on the Barriers Efficiency 4. Barriers Status Monitoring

,Yalta,17-th Symposium of AER3 DEFENCE-IN-DEPTH CONCEPT prevention of anticipated operational occurences prevention of design accidents by means of normal operation systems prevention of beyond design basis accidents by means of safety systems management of beyond design basis accidents emergency planning

,Yalta,17-th Symposium of AER4 BARRIERS fuel matrix (barrier 1) fuel pin cladding (barrier 2) boundary of the primary coolant system (barrier 3) containment system (barrier 4)

,Yalta,17-th Symposium of AER5 BARRIER 1 Has been substantiated:  for a 3-year fuel cycle of VVER-1000  for a 4-year fuel cycle of VVER-440 FP designed retention in fuel matrix makes approximately 99% (for fuel burnups MWd/kgU)

,Yalta,17-th Symposium of AER6 BARRIER 2 The adopted fabrication processes and proven pin operation practices allow to ensure the level of pin failure probability (leakage) not exceeding several units per /reactor-year

,Yalta,17-th Symposium of AER7 BARRIER 3 integrity of the equipment retaining the controllable and uncontrollable leakages at reasonably low level effective primary coolant purification system

,Yalta,17-th Symposium of AER8 BARRIER 4 containment system equipped with systems of treatment and processing of volatile fission products and liquid drainages The integrated effectiveness of all the barriers is called to provide the satisfaction of radiation criteria for annual dose limits of public arising from gaseous discharges and liquid drainages to the environment with allowance made for climatic and hydrological conditions at plant site during every normal operation condition or reactor state

,Yalta,17-th Symposium of AER9 FIRST BARRIER PENETRABILITY initial fuel structure irradiation parameters physical and chemical properties of radionuclides

,Yalta,17-th Symposium of AER10 OPERATIONAL LIMIT OF FUEL PIN LEAKAGE IS REGULATED BY THE FOLLOWING VALUES 0.2 % of fuel pins (of the total number of fuel pins in the core) may have defects of “gas untightness”-type 0.02 % fuel pins (of the total number of fuel pins in the core) may have serious defects of type “fuel - coolant direct intact” The second barrier effectiveness at normal operation is denominated by PBYa-RY-AS-89 as operational limit for fuel pin leakage.

,Yalta,17-th Symposium of AER11 UNIT SYSTEM CHARACTERISTICS BY DEFINED OPERATIONAL LIMIT efficiency of primary purification system as 30 t/h purification efficiency as 90% reactor thermal power as 3000 MW For these performances of operating VVER-1000 plants the operational limit of specific activity according to iodine-131 in the primary coolant amounts to 3.7 x 10 6 Bq/kg (10-4 Ci/kg).

,Yalta,17-th Symposium of AER12 THIRD BARRIER EFFICIENCY depends on controllable (defined by design technology) uncontrollable (defined by abnormal operation of the equipment) coolant leakages 1. Value of permissible uncontrollable coolant leakage into VVER-1000 (model B-320) containment rooms amounts to 100 kg/h 2. Operational limit on the leakage of the primary circuit into the secondary one is equal to 4 kg/h.

,Yalta,17-th Symposium of AER13 EFFICIENCY OF THE FOURTH BARRIER DEPENDS UPON: containment space containment integrity efficiency of ventystem effectiveness of purification system liquid waste management system storage system efficiency

,Yalta,17-th Symposium of AER14 BASIC PROBLEMS  existing calculation methods are certified for the burnups of MWday/kgU. For high burnup are used empirical correlations  investigation of influence of iodine isotopes spiking at high burnups on operational limit

,Yalta,17-th Symposium of AER15 Status Monitoring of First and Second Barriers avoiding abnormal operation conditions timely detection of failed fuel assemblies (with abnormal cladding tightness) avoiding prohibited radioactive effects of anticipated operation occurrences and design accidents by means of detecting and timely discharging of leaking fuel

,Yalta,17-th Symposium of AER16 BARRIERS STATUS MONITORING SHOULD BE REALIZED IN VVER REACTORS, INCLUDING: rated power increase and at power operation prolongation reduced periods of scheduled reactor trips for servicing and refueling reaching the average design burnup in a 4 or 5-year equilibrium fuel cycle of VVER-1000 and 5 or 6-year equilibrium fuel cycle of VVER-440 implementation of new types of fuel (for example, MOX-fuel and uranium regenerate based fuel)

,Yalta,17-th Symposium of AER17 CLM at Operating Reactor make it possible: to separate the quantitative contribution to FP activity levels due to failed fuel pins from that of residual contamination of the primary circuit to determine to which operation year the failed fuel assembly refers to assess the number of leaking fuel pins in the core for the time moment of analysis completion to determine fuel burnups in leaking pins

,Yalta,17-th Symposium of AER18 Selection of CLM methods for shutdown reactor depends upon the following factors: adopted concept of handling leaking fuel fuel assembly design availability of equipment and technology for fuel assembly “repair” CLM at shutdown reactor is aimed at the elaboration of conclusion on the possibility of further reactor operation or that of resolution to pre-term fuel discharge. So the criteria being used differ from that for normal operation

,Yalta,17-th Symposium of AER19 TASKS TO EXTEND THE CAPABILITIES OF THE CASE METHOD substantiation of availability to use the existing CLM case method for fuel assembly without the axial hole in fuel pellets practicing the method of longtime hold-up as an additional CLM method to be used for the cases, where because of cladding defect location it becomes impossible to initiate FP release from leaking claddings by pressure changing modernization of existing CLM facilities using up- to-date engineering solusions and pin database, which will enable reducing man-power and personnel exposure

,Yalta,17-th Symposium of AER20