Sneha Rao – Project Manager Edward Budriss – ME Alex Scarangella – ME Edward Wolf – CE Anna Cheung – ISE P09452.

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Valley City State University | Facilities Services
Fan Coil Unit Product Line-up. FCU Home Application Show.
Fluid Mechanics.
Refrigerators.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Moisture to water converter. Out Line : Abstract Introduction Heat Pump Heat Pump Components Conclusion.
Basic Refrigeration Cycle
Artel Climabox System Artel’s Climabox is a technical innovation because: n it is able to make the most of the two principal natural resources: gas and.
Expect More. World’s leader in pressure technology NA Sales Training Rev B – 10/10/13.
Joy Mist Drilling System Presented By: Dave Paich Joy Mining Machinery
MSD 1 P12453 Detailed Design Review Markus Holzenkamp Robin Leili Cody Anderson 5/17/2015 Detailed Design Review 1.
Pump Affinity Laws. P. 100 of text – section 4: vary only speed of pump P. 100 of text – section 5: vary only diameter P. 106 of text – vary BOTH speed.
Sneha Rao – Project Manager Edward Budriss – ME Alex Scarangella – ME Edward Wolf – CE Anna Cheung – ISE.
Paint Circulation Technology Level 1 - Training Document
Industrial Ventilation - A major control measure Dr. AA, UTM.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
6/10/2015SYSTEMS LEVEL DESIGN REVIEW 1 HEALTH-MONITORING OF A RECIPROCATING COMPRESSOR MSD1 – P12453 SYSTEMS LEVEL DESIGN REVIEW.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
EDGE™ Concept Level Project Plan P09452 Compressor Part Fabrication and ReVamp Snehapriya Rao (ME) Ed Budriss (ME) Alex Scarangella (ME) Edward Wolf (CE)
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
PRELIMINARY TEST PLANS 6/30/2015 Detailed Design Review 1.
Aqualean Product Presentation 1 By Laurent Domenget Product Manager, Rooftop & Packaged Air Units.
Reciprocating Compressor
Ice Pile Air Conditioning Joseph Cooper: Project Lead Kylie Rhoades, Clara Echavarria, Jonathon Locke, Alex Gee.
Industrial Acoustic Sound Enclosures FanAir Company designs and builds Acoustic Sound Enclosures Engineered to each specific application to control noise.
1Furmanite Confidential - 1/9/04 Motor and Pump Base Foundational Repair.
Vibration Monitoring & Machine Protection Systems Copyright 1999, Frank Howard, STI Vibration Monitoring, Inc. League City, Texas USA Reciprocating.
Important variables Water: Air: Conversion:
Settings & Adjustments. Settings & Adjustments.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
SIZING PNEUMATIC SYSTEMS. Introduction Pneumatic systems are sized to meet output power requirements. The air distribution system is sized to carry the.
Lesson 8 SECOND LAW OF THERMODYNAMICS
PROJECT STATEMENT Dresser-Rand will be donating a single stage ESH reciprocating compressor for RIT use. The project objective is to safely install the.
A Vapor Power Cycle Boiler T Turbine Compressor (pump) Heat exchanger
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
GAS TURBINE POWER PLANT
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
Facilities Management and Design Chapter 7 HVAC Systems.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Heat Engines A gasoline engine is a form of a heat engine, e.g. a 4-stroke engine INTAKE stroke: the piston descends from the top to the bottom of the.
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
1 3E-03 Fire Syringe RAPID COMPRESSION IS ADIABATIC GIVING RAPID RISE OF AIR TEMPERATURE IN THE CHAMBER WHICH EXCEEDS THE IGNITION TEMPERATURE OF THE FLAMMABLE.
MECH1300 Pneumatic Components Topics Pneumatic Cylinders Pneumatic Motors Other Pneumatic Actuators Pneumatic Directional Control Valves Pneumatic Flow.
7 A/C System Components, Operation, and Service.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
P08452 Reciprocating Compressor Installation, Revamp, and Interface Installation Designed and prepared the installation guidelines and test cell setup.
Technical Seminar on Application and Technical Specification June 2016
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Automotive Heating And Air Conditioning
Engineering II – August 2016
GROUND SERVICING OF VARIOUS SUB SYSTEMS
GROUND SERVICING OF VARIOUS SUB SYSTEMS
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
BRAYTON CYCLE AND EFFECT OF INTERCOOLING , REHEAT AND REGENRATION
air cycle cooling systems
RECIPROCATING COMPRESSORS BY DEEPA M S VARUNA TANDON
CONFIDENTIAL Technical Seminar on Application and Technical Specification 21 June 2016 Rezza Arif Bin Mustapa Kamal Senior Engineer Project And Application.
Cooling technology Main components and equipments
Roof Top Unit Overview (MAGNUM)
P17453: Dresser-Rand Poppet Valve Test Bench
FBE03: Building Construction & Science
Refrigeration & Air conditioning
MSD I Review February 22, 2008 (9:00 AM) Room
Presentation transcript:

Sneha Rao – Project Manager Edward Budriss – ME Alex Scarangella – ME Edward Wolf – CE Anna Cheung – ISE P09452

Background This is the second iteration of the project (P09452) Previous compressor (P08452) had an ITAR designation that made it unsuitable for RIT needs Dresser-Rand is donating a single stage, double acting, horizontal, reciprocating compressor Primary customer of the project Dresser – Rand: test future health monitoring RIT: research and facilitate lab

Objective of P09452 Prepare installation document Create a system to monitor activity, facilitate labs, and prepare for future health monitoring Develop lab procedures Ensure the compressor is safe for lab use by students and faculty

Installation – Structural Integrity Created simulations in ANSYS to perform structural and modal analysis to target areas of concern Modal analysis showed that structure would not be affected In the test cell,.00402” deformation due to static load Initial simulation showed that floor was not structurally acceptable

Installation – Structural Integrity Worked with PE to determine reinforcements Chose two steel I-beams placed at the extremes of the skid to dissipate forces Compressor skid was also modeled to determine deflection and factor of safety Yield strength for material of skid provided a factor of safety of 4.56

Installation - Ventilation Based on heat coming off compressor and amount of people in the room, calculated the air flow necessary Heat emitted into the room was previously calculated by motor inefficiencies, and black body analysis, approx. 3000BTUs/hour DescriptionSymbolValueUnits Temp of Machine ShopT shop 70FoFo Max Temp.T max 80FoFo Heat From Compressorq comp 3000BTU/hr Heat Gen. From People*met22 BTU/hr- ft 2 Avg. Exposed Skin AreaA skin 2ft 2 Number of People in Celln people 15# Specific Enthalpy Exiting Airh in 26.2BTU/lb Specific Enthalpy Entering Air ⁺ h out 29.8BTU/lb Specific Volume of Air (exiting) 1/  13.71ft 3 /lb Relative Humidity of the ShopRH60% *Metabolic heat generation for a person standing, relaxed ⁺ From psychrometric chart negligible moisture added from people

Installation - Ventilation Upon confirmation of drawings for present ventilation capabilities: Current ventilation system that contains GB-91 exhaust fan, 12” diameter ducts, EF-31, and EF – 32 exhaust fans on the roof would be adequate if all equipment is available Research an exhaust fan that is similar with 1/8 horsepower

Installation – Transportation/Mounting Work with Boulter Rigging Dresser-Rand → Boulter Rigging → RIT 45’ of transportation through Building 09 Load must be distributed over 60ft 2 using skates Mount using shim, 12 mm grade 8 bolts, nuts, and steel plates

Installation – Cooling Loop Chilled water supply must be plumbed into the test cell Cooling system must remove 40,000BTU/hr Inlet coolant temperature needs to be maintained at 10°F above ambient air temperature System includes: Pump: 300 GPH, 115V, ½” Heat exchanger: ¾ NPT inch connection, 8x3.25x 2.25” Coolant tank: Poly storage tank 22x10x8” Immersion heater: 400W, ⅝” diameter, ½ NPT Flow meters

Installation – Cooling Loop

Installation - Acoustics To ensure safety of operators in the test cell, performed acoustic analysis to determine the noise dosage Assuming a typical lab situation, exposure of an hour would not require ear protection Assuming extended maintenance, exposure of 8 hours would require ear protection Lab Situation Extended Maintenance

Installation – Interface Chose sensors that will facilitate educational labs and prepare the compressor for future health monitoring Specified ideal positions and mounts to assure versatility Researched DAQs that will integrate smoothly with the selected sensors

Installation – Sensors PositionSensorModel #Mounting AX-axis VelocityPCB VO622A11Stud/Magnetic Mount AX-axis AccelerometerPCB 623C00Stud/Magnetic Mount BInner Bore PressurePCB 102A21Bore Hole CZ-axis AccelerometerPCB 623C00Stud/Magnetic Mount DY-axis VelocityPCB VO622A11Stud/Magnetic Mount DY-axis AccelerometerPCB 623C00Stud/Magnetic Mount

Installation – Sensors PositionSensorModel #Mounting EInlet Air PressurePCB 101A05Stud Mount FTank Air PressurePCB 102A21Bore Hole GTank Air TemperatureOmegaRTD-NPT- 72-E-DUAL- MTP Bore Hole HOutlet Air TemperatureOmega RTD-805Adhesive Mount HOutput Air PressurePCB 102A21Adhesive Mount HAir flow meterOmega FTB-936Pipe Fitting IWater Inlet Flow RateOmega FV101Pipe Fitting IWater Inlet TemperatureOmega FV101Pipe Fitting JOutlet Water TemperatureOmega FV101Pipe Fitting JOutlet Water Flow RateOmega FV101Pipe Fitting KInlet Air TemperatureOmega RTD-805Adhesive Mount

Education – Thermal Fluids Explores the concepts of isentropic compression Utilizing a high sample rate pressure transducer located in the bore of the cylinder and a crank position sensor, we are able to generate real-time plots of pressure vs. volume Compare real-time plots with the theoretical pressure vs. volume diagram

Education – Thermal Fluids Assuming adiabatic compression and negligible pressure drop through the valves, a theoretical p-v diagram can be generated Chart and plot volume values for a variety of pressure values between atmosphere and the maximum absolute pressure that the compressor achieves (use the equation for adiabatic compression and expansion for values between atmospheric and the maximum pressure) V TDC,Outer V TDC,Frame V BDC,Outer V BDC,Frame

Education - Vibrations Create a theoretical model using vibration analysis Calculate the maximum deflection on the compressor Then using the data logged from the accelerometer attached to the skid, measure the deflection on the skid. Compare the theoretical and experimental data. Include the ANSYS analysis.

Test Plans Usability Tests E-Stop Prior to first run and During first run Lock-out Tag-out Prior to first run, During first run, Removal and Reinstall of parts Air Flow Sound Levels Room Temperature Vibrations Lifting Capabilities

Requests from Dresser-Rand Created scope of supply based on hazard analysis and specific needs Requests: Reposition relief valve downward Incorporate E-Stops into control panel Five holes drilled into compressor Handles welded on to access panels Clear lexan access panels Replace 480V 3 phase motor with 220V 1 phase motor

Supplying to Future Team Calculations and Simulations Cooling Loop, Thermal Analysis, Ventilation, Acoustic, ANSYS Installation Manual Includes necessary contracted work, mounting of compressor, hardware needed, ventilation requirements, cooling loop, sensors, location for sensors, and DAQ Safety Document Educational Labs Test Plans Planning Documents