Odds and Ends of a Start-Up Lab Alan Xu Li Lab RLM 2.414.

Slides:



Advertisements
Similar presentations
Hall A Collaboration Meeting S. Nanda, June 23, 2005 Hall A Compton Polarimeter For Hall A Collaboration Meeting June 23 rd 2005 Sirish Nanda Thomas Jefferson.
Advertisements

Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
______s Room Budget Created by:. My New Room I plan on purchasing _____ items for $ ____________.
Pulsed Fiber Laser Autocorrelator
Outline Index of Refraction Introduction Classical Model
Max Klein/Univ. of Liverpool Peter Kostka/DESY Alessandro Polini/Univ. of Bologna Markus Nordberg/CERN.
Harbor Security System Matthew Birkebak Timothy Brown Proposed location for laser security gate in Portsmouth.
Building an Electron Accelerator for Use in a Free-Electron Laser by Daniel P. Mills.
Desktop Fan Project Introduction Living with the Lab Desktop fan workshop ASEE 2012 Conference.
Diamond Radiator Development Brendan Pratt University of Connecticut GlueX Collaboration Meeting, Jefferson Lab, October 2011.
Atomically-Resolved Optical Properties of Single Molecules Arthur Yu Mentor: Wilson Ho IM-SURE 2007.
Senior Design II Film Thickness Measurement Julian Peters Joe Fitzmyer Brad Demers Coordinator: Dr. Wayne Walter Advisor: Dr. Dale Ewbank Sponsor: Dr.
Compressor ReVamp and Fabrication PO9452. Update Revised specs Continued concept generation Researched range of educational applications for compressor.
QA for the Fibre Tracker 28 October 2004Brunel QA for fibre bundling Dr Paul Kyberd and Dr Peter Hobson School of Engineering & Design Brunel University,
Optical Network Link Budgets EE 548 Spring Reference Model.
Introduction to Experimental Techniques in Optics Motivation: Optics is becoming increasingly important in many application areas such as communication/computing.
Scanning apparatus. Final tune ups Repeatability: move in a given steps and see if we can get the same amounts. Calibration: mainly to convert any given.
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
(a) (b) (c) (d). What is (1,2,3)  (3,4,2)? (a) (1, 2, 3, 4) (b) (1,2)  (3,4) (c) (1,3,4,2) (d) (3,1)  (4,2)
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
Dimensional Metrology Dimensional Metrology Program Steve Phillips Program Manager MEL Metrology Support for Laser Trackers and Scanners Supports Industrial.
Smart Material Museum Exhibit Spring Design Review #2 Senior Design Group 13 Glen Ashworth Daniel Roque Isaac Piersall Laura Wainikainen.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
3-Point Bending Device to Measure Transmural Strains for Multilayer Soft Tissue Composite Week 1 Weekly Report Jennifer Olson Sarah Rivest Brian Schmidtberg.
Purpose: To investigate the importance of lab safety and accuracy.
Course status. Course materials Lab access Everyone should have –lab book –proto board –voltmeter –jumper wires –resistor card Write name on yours –maintain.
Dragster Project: emphasis on control. Control The dragster project focuses on control Controlling electric motors is the basis for many applications.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
By Douglas Higinbotham. Added Cherenkov and Sieve Plate.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Task M2 – Working group Auriga-LNL Operation temperature KOperation temperature K Mechanical Attenuation >180dB in the frequency range.
Raskar, Camera Culture, MIT Media Lab Camera Culture Ramesh Raskar Camera Culture MIT Media Lab Ramesh Raskar.
Equipment Planning and Project Consulting Technology Management.
The Enhanced Electronic Assembly and Test System ARENA
Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting June 5, 2001.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Pump fabrication – day 1 living with the lab group B will make their pumpgroup A will draw their pump.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
US CMS Deputy Chair Candidate Vasken Hagopian. My activities as Deputy Chair of US CMS Collaboration  Nominated young physicists for CMS talks at conferences.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Desktop Fan Project Introduction
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
FIN 370 Complete Class + Final Exam FIN 370 Complete Class + Final Exam NO LAB Work To purchase this material click below link
The Next Generation of a Gamma Irradiation Facility GIF++
Zhe Yang Michigan REU Program Symposium August 9, 2017
Date of download: 10/12/2017 Copyright © ASME. All rights reserved.
TOWN OF HUBBARDSTON FINANCIAL FORECAST
Turbomachinery Flow Visualization P08453
Designing and Prototyping Optics Table and Shelves
Ahmed Damoni Ahmed Sabha.
Manuel Marchiò, Raffaele Flaminio, Shunshi Kuroki
Xerox Bearing Tester Final Project Review
The CosMic Telescope Construction of a self-triggering prototype telescope at GHz funded at the Università del Salento (Lecce) – 2 years project (end 2013)‏
Present status of the laser system for KAGRA
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS

FIG. 1. Schematic of the triple modulation setup, which includes a linear polarizer, Helmholtz coils with an applied sinusoidal magnetic field, PEM, second.
4 + (-5) = A. Start at zero B. Move ______ spaces ___________ to get to the first number. C. From there, move _____ spaces __________ D. My final answer.
Project Management Issues John N. Galayda, SLAC April 24, 2002
GIGABIT ETHERNET DESIGN ECE Spring 2004
Endstation Systems, Installation Costs and Schedule J. Hastings
Types of Errors And Error Analysis.
X-Ray Endstation Systems (XES) 2006 Schedule
DS20k Integration Workshop
Presentation transcript:

Odds and Ends of a Start-Up Lab Alan Xu Li Lab RLM 2.414

Lab Experience Reconnaissance Experiment Design/Skills Purchasing Infrastructure Experiment Construction Spot Size Measurement Autocorrolation

Reconnaissance Learning about your project Learning about other projects

Experiment Design Optics size Placement Safety Range of Experimental Error Budget

Design Skills LabVIEW Solidworks Soldering Machining

Purchasing Budgeting To Build or to Buy? Shipping/Local Tax exemption “Best bang for the buck” $732.70!

Infrastructure Spacing Racks HEPA Filter Curtains

Experiment Construction (Finally) Machining “Some assembly required”

Spot Size Measurement Zaber Motor “Chopper” with Razerblade LabVIEW DAQ Photon Detector

Autocorrolaters Field FROG SPIDER GRINOUILLE

Field Autocorrolation My project Laser: ~100 femtoseconds

Etc. Research Continues