Monthly Management Report Submitted By Facility Management Team

Slides:



Advertisements
Similar presentations
Monthly Management Report February By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Advertisements

1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
Utility Management Providence Health System - Oregon Environment of Care.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
COBRA Status W. Ootani MEG Review Meeting Jul. 18th, 2007.
Line Efficiency     Percentage Month Today’s Date
Objectives: Understand importance of utility and maintenance system in industry/plant.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
The students: Mohammad Shabaro ( ) Mahmoud Mousa ( ) Yosri Asfour ( ) Supervisor: Dr. Iyad Assaf 1.
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.
GREEN INITIATIVES AT IIMB Brief outline and benefits.
Examples of Commissioning Cost Savings Commissioning for Sustained Building Performance September 29, 2011 Marriott Birmingham, AL.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Computer Operations Group Data Centre Facilities Hitendra Patel June 2015.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA Aug 2015 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report Submitted By Facility Management Team
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Status: Tritium Plasma Experiment at the INL Safety and Tritium Applied Research (STAR) Facility R. A. Anderl*, J. P. Sharpe*, R.D. Tillotson* (*INL) R.A.
Monthly Management Report December Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
An Example of Residential Solar Retrofit Shawn Fitzpatrick, P.E. Energy Engineer Advanced Energy September 30, 2014.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
COGNIZANT TECHNOLOGY SOLUTIONS PRIVATE. LTD Monthly Review Meeting – August 2008.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
Brentwood of Palatine Condominium Board Meeting Treasurer’s Report – Cash Position – Delinquencies Rules & Regulations Laundry Natural Gas Elliot.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
KARMA GBM /5/ AGENDA Update on FY14-15 projects and pending items Closure of FY KARMA Financial Statements Introduction of New Committee.
QUALITY UPDATE Paul Newell Quality & Systems Manager.
Monthly Management Report Jul2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
Monthly Management Report September Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
Monthly Management Report Jun2012. Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
50% LBNE Concept Design LAr Infrastructure. Mechanical.
North Penn School District
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Jan 2016 Solar Lunar Data.
The Data Center Challenge
Procurement Management Information System (PMIS)
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Overarching Commissioning Plan
Electricity Cost and Use – FY 2016 and FY 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
1.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Objective - To make a line graph.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
CSPEC meeting - Coatings
Project timeline # 3 Step # 3 is about x, y and z # 2
Presentation transcript:

Monthly Management Report Submitted By Facility Management Team CeNSE Centre for Nano Science and Engineering 24 April 2017 Monthly Management Report September 2012. Submitted By Facility Management Team Monthly Report-(Jul 2011) Facility Management

CeNSE 24 April 2017 EXECUTIVE - SUMMARY This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan. The following points are put forward for review Scope and nature of services Proposed manpower distribution. Availability of manpower. Major incidents summary. Initiative taken. Initiatives planned for next month. Power failure analysis Monthly HSD consumption. DG- Generated power KWH. EB power consumption. Average power consumption EB+DG. Liquid nitrogen consumption. Suggestions and requirements. Transition pending works. Help desk, Complaint register Facility Management

1.Scope & Nature of Services CeNSE 24 April 2017 1.Scope & Nature of Services BMS ETP Electrical CeNSE-Facility Management Ultra pure water system RO Plant Help desk HVAC Plumbing Facility Management

2.PROPOSED MANPOWER DISTRIBUTION CeNSE 24 April 2017 2.PROPOSED MANPOWER DISTRIBUTION Facility Management

3.Availability of Manpower CeNSE 24 April 2017 3.Availability of Manpower DESIGNATION Planed Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Facility Manager 1 Technologist 3 Electrician 4 2 Chiller operators BMS operator Plumbers Asst.Technician Total 15 10 11 13 12 14 Facility Management

4.Major Incidents Summary Date Location Failure details Action taken & Status 04-09-12 DG Yard DG coolant water leakage. Informed to DG vendor, They rectify the issue. 08-09-12 SF-16 A/C not working Voltas people attended the complaint & resolve it. 18-09-12 Cleanroom GMS alarm activated Due to low exhaust,Reset the alarm. 29-09-12 Fire alarm activated False alarm, resetted.

5.Initiatives taken Litho-2 extra power point provided. CeNSE 24 April 2017 5.Initiatives taken Litho-2 extra power point provided. Vacuum cleaner shifted from Litho-2 to corridor area. AHU-3 Hepa filters changed. AHU-1&2 filters cleaned. DG- PPM done. Electrical oven shifted to litho-1 AHU -2 aluminum beading fixed for heaters. PCW pump PPM done. PA system at fab building – problem rectified. 20 KVA UPS load shifted to Centralized UPS. Facility Management

6.Initiatives Planned for next month CeNSE 24 April 2017 6.Initiatives Planned for next month ETP painting works. DG “B” check. Chiller 1 circuit fault – to be resolved. New bore well water tap connection for chiller cleaning. Electrical system taking over- CeNSE. Shifting of pipes . Partition of utility 2nd floor area. A/C works at UPS area 2nd floor utility. General exhaust PPM. AHU all- filters changing. Facility Management

7.POWER FAILURE ANALYSIS CeNSE 24 April 2017 7.POWER FAILURE ANALYSIS SL Date From To Total 1 02-09-12 11:30 11:40 10 Min 2 03-09-12 08:30 09:00 30 Min 3 04-09-12 07:40,8:15,9:00 07:50,8:35,14:50 6:20 Hrs 4 08-09-12 8:50,14:30 10:00,14:45 1:25 Hrs 5 15-09-12 11:10,15:00 11:20,15:10 20 Min 6 17-09-12 11:30,14:00 12:35,14:55 2 Hrs 7 23-09-12 13:15,20:20 13:30,20:35 8 29-09-12 7:00,11:20,16:25 7:10,11:30,16:35 TOTAL HRS 11:35 Hrs Facility Management

8.MONTHLY HSD CONSUMPTION CeNSE 24 April 2017 8.MONTHLY HSD CONSUMPTION Facility Management

CeNSE 24 April 2017 9.DG Generated Power KWH Facility Management

CeNSE 24 April 2017 10. EB Power Consumption   Facility Management

11.AVERAGE POWER CONSUMPTION EB+DG CeNSE 24 April 2017 11.AVERAGE POWER CONSUMPTION EB+DG Facility Management

12.LIQUID NITROGEN CONSUMPTION

13.Suggestions and Requirements Shelters to be provided for DGs, Utility terrace & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side. Shelter with closed fencing can make on the Fire tank & this area use as storage place. Uniform & Safety shoes to be provided for all maintenance staffs. Walky-talky to provided for maintenance staff. Dg-1&2 (CeNSE Building) B-Check pending. A/C for UPS to be provided. Chemical & Gas cabinet exhaust to be provided.

14.Transition – Pending works  

15.Help desk, Complaints register

Thanks by, Facility Management Team