Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, 21-22 March 2011 Energy Infrastructure Package ERGEG preliminary.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

1st Ten Year Network Development Plan: ERGEG opinion
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Completing the EU internal energy market IFIEC, 22 November 2011
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Completing the EU internal energy market
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Accessing European LNG terminals.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
|Date faculty of law groningen centre of energy law 1 Security of Supply – EU Perspective and Legal Framework First EU-Russia Energy Law Conference,30.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Regulatory Transparency and Interaction with the Government Dr. Konstantin Petrov Head of Section, Policy and Regulation.
22 February 2007 ERGEG approach to the internal energy market Nick Thompson – Ofgem IFIEC Europe Energy Forum, 22 February 2007.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
10 th SG Meeting, GRI SSE Milano, 5 May 2011 GRI South South-East Region.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
1 Investment workstream, GRI NW Investments and Incentives an economic perspective Machiel Mulder Office of Energy Regulation Netherlands Competition Authority.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
1 Open season th IG Meeting 26 th March 2010 Paris.
Chryssa Argyriou Directorate B – Security of supply, Energy markets & Networks Unit B2 Electricity and Gas Sofia, Energy Day, 18 June 2010 Energy Infrastructure.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Tom Maes, ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Transit contracts.
Update on electricity market Baltic Mini Forum 1 October, 2010.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Madrid 15 th June 2009 OS Agreement to Reserve Capacity 10 th IG meeting.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
22 – 23 November 2007 GIE Annual Conference How the Third Package might encourage investment.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
Energy Community Secretariat Needed Reforms in Electricity High-Level Forum on Security of Supply in Kosovo Andreas Pointvogl, Energy Community Secretariat.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
10 year investment plan ERGEG approach and contribution
The 3rd package for the internal energy market
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
Background and Process
Gas Regional Initiative
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
DRAFT DG TREN Staff Working Paper on LNG
Incentives for electricity infrastructure – ERGEG view
XIIIth Madrid Forum (16th/17th October 2007)
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Presentation transcript:

Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary views on cost allocation for investments in gas infrastructures

2 19th Madrid Forum, March 2011 EIP diagnosis and objectives Commission’s diagnosis Potential lack of investment in infrastructure to implement the European energy strategy; The "market" may not always finance the investments: investment gap estimated at 10B€; Cross-border investment decisions made at national level. Introduction of new concepts where investment should be promoted Positive externalities; Regional benefit or benefit for a « third country ».

3 19th Madrid Forum, March 2011 Regulators’ approach to investment Market based mechanisms to remain the reference principle: filling the gap between market value (shippers’ willingness to pay) and cost is the dominant issue; Developing infrastructure to the benefit of competition and market integration: priority to market based mechanisms when appropriate; Different situations Market design (e.g. merger of balancing zones): market based procedures are generally not appropriate, except if there is some additional transmission capacity created at remaining IPs; Interconnectors: possibility of TPA exemption (after a market test); Interconnections: market based mechanisms (open seasons). Regulators promote a rational approach to infrastructure development Priority to a sound use of existing infrastructure: precondition to avoid inefficient network expansion is effective capacity management; Assess the need for new infrastructure (market test); Investment agreed regarding its market value, but also security of supply, competition development, etc.

4 19th Madrid Forum, March 2011 Identification of priority projects, the role of the TYNDP Market integration Identify where the European system lacks of capacity to guarantee a sufficient level of cross-border interconnection open to TPA; According to EWI-Study and ENTSOG’s TYNDP, the EU gas grid - in technical terms - is well developed but some (physical and potential) bottlenecks identified. Security of supply TEN-E projects, the EEPR and the reverse flow projects to be included in the TYNDP; Need to simulate system’s reaction over longer periods based on different demand scenarios. Depending on the TYNDP results cost allocation is driven by Open Season procedures and tariffs; and/or Cost allocation rules according SOS regulation.

5 19th Madrid Forum, March 2011 Existing tools: Open Seasons Background principles Value based methodology focused on shippers’ willingness to pay; Investment decision based on an economic test. Key issue: elaboration of the economic test which should include all the different benefits expected from the project When the collective value is higher than the market value: investment may be rejected while potentially desirable; In successful open seasons, the economical conditions of long-term commitments are consistent with the shippers’ willingness to pay. Additional value of the infrastructure may be due to Security of supply; Positive externalities; Benefit for competition and market integration.  Challenge: addressing these dimensions when there is a potential gap between market and collective values of the project.

6 19th Madrid Forum, March 2011 Existing tools: Tariffs Tariffs are the basic tool for cost/revenue allocation, they are adopted in most cases; Cost reflective entry/exit tariffs allow to cover the costs in a balanced way for cross-border infrastructures; Limits and risks Tariffs higher than the market value of the transmission service proposed, for instance when costs are high; Underuse of the infrastructure during the asset’s life, after the end of long-term contracts for instance or when assets are used as reserve for SoS.  Challenges: filling the potential gap between costs and market value and allocating the risk of stranded assets consistently with the individual benefits expected from the interconnection.

7 19th Madrid Forum, March 2011 Focus on cost allocation (1) Specific cross-border mechanism only justified when Shippers’ willingness to pay is below the collective value of a cross-border investment AND asymmetry of benefits between adjacent countries; Regional benefits of a national investment. Need for a sound diagnosis Evaluation of externalities and respective national benefits to assess the collective value of the project; Identification of risks. Cross-border cost allocation options Socialisation through national tariffs when balanced benefits; Cross-border subsidy or financial support from the benefitting country when asymmetry of benefits; EU subsidy if regional or community benefit.  Find a proper balance between “user-pays”, “beneficiary-pays” and “taxpayer-pays” principles in order to fill the gap between cost based tariffs and the market value of the services.

8 19th Madrid Forum, March 2011 Focus on cost allocation (2) Risk based approach Rationale: when tariffs and market value are aligned at the time when the infrastructure is commissioned; Estimation of risks during asset’s life; Main risk: underuse of the infrastructure leading to a lack of revenue (stranded assets). In case of assymmetric national benefits risk coverage should be agreed before the investment Improving the cross-border coordination of open season procedures is often the first way of facilitating investment Identifying all the necessary investments to develop transmission capacity; Coordination increases the value of the projects; Reduce the risks associated to delays from one of the investors. Ensure effective unbundling to prevent potential obstruction by incumbents.

9 19th Madrid Forum, March 2011 Conclusions Market based approach should remain the reference Prevents from over-investments which could result in high sunk costs; They should internalise externalities before the open seasons are organised; The result of open seasons should be followed, even when the investment is rejected  regular OS are an option. Tariffs are sufficient to cover costs in most cases but Part of the costs often need to be socialised in open seasons; Distorsions due to the gap between market and collective values should be covered; The long-term risks of underuse of a newly built infrastructure (stranded assets risk) may need to be addressed. EU/tax payer support and cost/risk allocation should be assessed before the decision to invest is made, based on a sound methodology.

10 19th Madrid Forum, March 2011 Thank you for your attention!