28/10/09 Positron Workshop 1 Introduction and Setting the Scene Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.

Slides:



Advertisements
Similar presentations
30/10/09 Positron Workshop 1 Future Work Plan, Action Items, Future Meetings Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Advertisements

Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
29 May 2009 AD&I Meeting Global Design Effort 1 The Positron Source Ian Bailey & Jim Clarke.
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
N.Toge on SB20091 SB2009 Rebaselining Proposal Document - How do we get it done? /10/2 N.Toge (KEK) for SB2009 Efforts.
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
20/03/2011 Global Design Effort 1 ALCPG11 – Eugene Positron Source N. Collomb J. Clarke, D. Angal-Kalinin,
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Proposed machine parameters Andrei Seryi July 23, 2010.
1 st October Linear Collider workshop The CLIC/ILC common work plan progress J. Clarke and L. Rinolfi.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
WG3a Sources Summary Jim Clarke on behalf of John Sheppard, Masao Kuriki, Philippe Piot and all the contributors to WG3a.
Key luminosity issues of the positron source Wei Gai.
Current standing of the undulator based ILC positron source Wei Gai AWLC 14 FNAL, May
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Status of ILC BDS Design Deepa Angal-Kalinin ASTeC/Cockcroft Institute, Daresbury Laboratory Andrei Seryi SLAC National Accelerator Laboratory ILC-CLIC.
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
1 Status of SB2009 Rebaselining Proposal Document and Preview of Feedback from PMs + Editor Draft C N.Toge.
Undulator Based ILC Positron Source Parameters Wei Gai ANL ALLCPG 2011 March 20, 2011,
Polarimetry Report Sabine Riemann on behalf of the DESY/HUB group January 24, 2008 EUROTeV Annual Meeting, Frascati.
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Discussion, Action Items, & Future Work Plan Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 –
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Undulator based polarized positron source for Circular electron-positron colliders Wei Gai Tsinghua University/ANL a seminar for IHEP, 4/8/2015.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
POSIPOL Berlin ILC/CLIC e + generation working group Wei Gai, ANL Louis Rinolfi, CERN Thanks to Omori-san for the coordination of the Webex meetings.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
1 Status of SB2009 Rebaselining Proposal Document and Feedback from PMs + Editor This version includes the touch ups applied during the AD/I webex meeting.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
AD&I Meeting 23/6/10 Jim Clarke
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
AD & I : BDS Lattice Design Changes
CLIC Undulator Option for Polarised Positrons
ILC/CLIC e+ generation working group
Future Work Plan and Action Items
Beam Dump outline work plan (UK perspective)
ILC RDR baseline schematic (2007 IHEP meeting)
Summary for the Sources working group
Presentation transcript:

28/10/09 Positron Workshop 1 Introduction and Setting the Scene Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory

28/10/09 Positron Workshop 2 Welcome to Durham ! Thanks to Gudi, Stefan and Linda for organising the workshop !!!

Aim of Meeting Discuss the recent R&D for the baseline and the alternatives. Discuss the SB2009 proposal (undulator at end of linac) and assess the implications. Understand timescales for the new baseline Update the risk register using the new scoring system. Set actions and priorities for the short, medium, and long term. 28/10/09 Positron Workshop 3

Parallel Issues A number of issues are proceeding in parallel at present and these need our attention: –The new baseline (SB2009) –Re-costing –Revising the Risk Register –Updating the R&D plan –Funding allocations (in the US) –ILC/CLIC cooperation 28/10/09 Positron Workshop 4

The New Baseline Following the AD&I meeting at DESY in May 2009 we were asked to look in detail at the undulator at the end of the linac 28/10/09 Positron Workshop 5

AD&I Report Extract 28/10/09 Positron Workshop 6

Next AD&I Meeting We presented our latest findings at ALCPG09, Albuquerque There will be a special AD&I meeting to follow this up at DESY 2 nd & 3 rd December 2009 A number of actions were placed upon us at the previous meeting 28/10/09 Positron Workshop 7

Baseline Timescales 28/10/09 Positron Workshop 8

N.Toge on SB –2009/10/10: Most “outline” pieces posted –2009/10/17: First feedback from PMs and the editor to authors –2009/10/24: Most zeroth/first-order contents in place, with many holes, perhaps –2009/11/4 or 5: SB2009 Rebaseline Webex; Second feedback from PMS and the editor to authors –2009/11/14: Most first/second-order contents in place, with much less holes, hopefully –2009/11/21:Third feedback from PMs and the editor to authors. –2009/12/2-3: DESY meeting. Freeze technical contents. –2009/12/24:Freeze textual contents. The Baseline Document

N.Toge on SB See next page for remarks Outline of the Baseline Document 1.IntroductionPM2 pages 2.SB2009 OverviewPM4 pages 3.SB2009 LayoutJMP 4.SB2009 Proposal (TAG leaders) 1.ParametersPM2 pages 2.Gradient IssuesPM (AY)2 pages 3.InjectorsJC2 pages 4.Damping RingsSG2 pages 5.Bunch CompressorsNS2 pages 6.Main Linac 1.Single Tunnel (Technical) Solution VK2 pages 2.DRFSSF2 pages 3.KCSChris2 pages 7.BDS/MDIAS2 pages 8.CFS solutionsVK4 pages 5.Cost Increments/differentials (PHG)2 pages 6.Risk PMs2 pages Appendices 1.Report from Availability Task ForceTMH 2.Report(s) on Tunnel Safety ConceptsCF/PMs 3.Risk analysis … (here, or embed elsewhere) ~30 pages Probably end up with

The AAP Review We were reviewed in April 09 (Tsukuba) There will be another review in Jan 2010 (Oxford) 28/10/09 Positron Workshop 11

AAP Review continued 28/10/09 Positron Workshop 12

Actions from Daresbury Workshop Actions were placed on many groups at the Daresbury Workshop (Oct 2008) –Short Term (ILC 08) –Medium Term (KEK April 09) –Longer Term (end 2009) –General comments/outstanding items The actions as of Oct 2008 follow 28/10/09 Positron Workshop 13

Undulator Jim R’s presentation in Chicago to Akira (straightness & training) – Jim “Real” Undulator spectrums required for modelling of source – Duncan (next meeting) Write a Report on vertical test results – Nick/Duncan/RAL (next meeting) Complete 4m cryomodule & test (fix leak!) – Jim Cross-check und parameters selected for minimum machine (probably easier) - RAL Alignment requirements justified/jitter studies/impact on polarisation – Duncan Generate beam test plan – Jim Horizontal magnet measurements required at some stage Electron beam tests required at some stage Modules need to be engineered for large scale production and operation Intermodule connections need engineering Store cryomodule safely so can be powered at a later date

Source Modelling Write-up undulator emittance effect – Wei (next meeting) Write list of current simulation codes and objectives + input files – Ian How thick does concrete/other material need to be - Andriy Move undulator to 250GeV, reoptimise source parameters (und, target, OMD) - Wei Running at 50GeV for calibration (what is energy spread etc) – Wei Look at PTRAN losses in ANL simulations - Wei Ongoing yield/polarisation evaluation with source design evolution (Wei) Operating scenario (hours in tunnel when off) – Nick/Marc suggest 200 hours per year, 10mSv allowed dose per year

Compton Continue DR stacking studies and work with DR group to ensure optimum solution - Frank cavity stability tests (LAL/KEK) - Omori Laser demonstration – Fabian Zomer, Vitaly ATF demo – Omori 2010/11 demo with new cavity of high gamma flux at ATF

Polarisation Write brief report justifying need for 5Hz positron spin flipping at some point and ability to reverse – Sabine (next meeting) Confirm investigation showing we can destroy polarisation in DR completely – Larissa Select spin rotator design (5GeV/400MeV?) – check concern of Alexander - Sabine Close contact with IP group polarimeter (Tony) Ensure spin survives to DR Close contact with simulations group – spin track to IP Electron spin also within undulator – Des

Collimation High power photon collimator needs to be studied –Study activation – Lei (next meeting) Positron collimation – design documented, needs updating as source evolves Variable aperture collimator needed for polarisation upgrade?

Target Report on hybrid target scheme for ILC - Omori Complete Eddy current tests at Daresbury – Ian/Leo Store target properly – Ian/Jim Generate simulations to compare with experimental results – Jeff / RAL/Leo Pressure shock wave analysis – Stephan (next meeting) and numerical modelling later Energy compression before DR to be studied – Nick?/Wan Ming RIA Ferrofluidic seal study information – Jeff Lifetime studies of target (LLNL) Alternative liquid metal & window (BINP/KEK tests) – Junji Joint target for auxiliary & und source (3 X0 and 0.4 X0) Engineered solution, including prototype tests – water, vacuum, …

OMD Li Lens –Evaluate level of radiation damage in window & implications for lifetime –Stress-strain in window with liquid flow –Thermal cycling fatigue –Cavitation wear on windows –Proton beam tests? –Contact experienced Li lens experts to discuss this idea (Jerry Dugan?) – Marc to provide names –KEKB BN window tests (liquid lead target) –Discuss with M Harrison (solid/liquid?) –Concern with liquid li containment in steel (Pavel) –Discuss with Harrison and create work package for 2009 – Jim/Nick/Marc/Jeff/Alexander/Wei Flux Concentrator –Need feasible design - Jeff

Remote Handling Preliminary use of detailed target model in Fluka – Luis/Lei/Andriy (next meeting) Collimator in RH (next mtg) Shielding thickness around target etc – Andriy (next mtg) - duplicated Auxiliary source (needs RH as well) – KEKB?/Kuriki RH scenarios refined –Changeover times (requirement ties in with lifetime of kit in RH) –Replacement of pillow seals? Pillow seals need R&D Need engineered design compatible with source layout (remove inconsistencies!) If yield increases then RH not needed (limited only?)

Integration Understand timing issues for ILC, work with DR group to look at options – Jim/Andy W Minimum machine integration with BDS etc - Norbert

EDMS work package Define structure - Jim Report back on EDMS status – ongoing action Ian/Lars

Auxiliary Source Define new specification for Auxiliary positron source – Jim Establish link with KEKB high intensity conventional source project – Jim/Kamitani

The Agenda …