Early Commissioning of ATLAS First North American ATLAS Physics Workshop Tucson J. Pilcher University of Chicago.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
Preparing for data analysis in ATLAS Andrea Dell’Acqua - CERN PH/SFT on behalf of the ATLAS collaboration.
Introduction This project used cosmic rays to test a prototype Minimum Bias Trigger Scintillator (MBTS) that will be used in the ATLAS experiment at CERN.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Pascal PERRODO, ATLAS-LAPP
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
A Possible  13 Electronics Architecture A Strawman Proposal Kelby Anderson for Jim Pilcher 30-Apr-2004.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Preliminary comparison of ATLAS Combined test-beam data with G4: pions in calorimetric system Andrea Dotti, Per Johansson Physics Validation of LHC Simulation.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Introduction Construction, Integration and commissioning on the surface Installation and commissioning after installation in the cavern Selected performance.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
CMS Calorimeter HB- HB+ HE- HE+ HF- HF+ HO-2 HO-1 HO0 HO+1 HO+2
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Cosmic Rays for ATLAS Commissioning Commissioning Meeting ATLAS Physics Workshop Athens May 2003 Halo+Cosmics group: M.Boonekamp, F.Gianotti, R.McPherson,
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
The Electromagnetic Calorimeter – 2005 Operation J. Sowinski for the Collaboration and the Builders Indiana Univ. Michigan State Univ. ANL MIT BNL Penn.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
ATLAS Tile Hadronic Calorimeter:
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Plans for first beams - - triggers from the BRM group (BSC, BPTX) Gábor Veres for the BRM group CMS Trigger Technical Coordination Meeting 8 October,
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
The ATLAS Tiles Hadronic Calorimeter
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Nov. 2005Calorimeter Commissioning R. Teuscher 1 Calorimeter Commissioning in : Testbeam 2: Installation, Cosmic Ray Commissioning.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Calibration and monitoring of the ATLAS Tile Calorimeter
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
 13 Readout Electronics A First Look 28-Jan-2004.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
TileCal EM scale status Irene Vichou University of Illinois at Urbana on behalf of TileCal Collaboration MPI Hadronic Calibration Workshop May 3 rd, 2006.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
CMS Preshower: Startup procedures: Reconstruction & calibration
ATLAS L1Calo Phase2 Upgrade
A First Look J. Pilcher 12-Mar-2004
ScECAL+AHCAL+TCMT Combined Beam FNAL
The First-Level Trigger of ATLAS
Presentation transcript:

Early Commissioning of ATLAS First North American ATLAS Physics Workshop Tucson J. Pilcher University of Chicago

20-Dec-2004J. Pilcher2 Early Commissioning of ATLAS 10 Dec 04

20-Dec-2004J. Pilcher3 Commissioning Goals Establish operation of full systems  Readout  Calibration systems  Low Voltage, High Voltage  Control and Monitoring  Cryogenics, Gas, Cooling Establish initial calibrations  Mev/ADC count  Alignment and timing  Chamber or sensors within a detector system  Relative alignment and timing of different detector systems Demonstrate performance levels  Noise levels  Physics signals

20-Dec-2004J. Pilcher4 Commissioning Stages Calibration systems only Cosmic ray muons  MIP signals and inelastic interactions  Stand-alone detector systems (2005-6)  Full ATLAS detector (2007) Initial beam operation  Single beam operation  Beam-gas interactions  Beam halo muons  Beam-beam operation  Minimum bias interactions Early beam-beam collisions  Use physics signals (,  -j, Z-j, j-j, )

20-Dec-2004J. Pilcher5 This talk  Concentrate on first three stages  Other talks on commissioning with beam-beam physics signals  Special emphasis on calorimeter systems More details at:  Tatra Workshop:   Overview week at Freiburg: commissioning session   Overview week at Prague: commissioning session  This talk draws on the work of many people  R. Teuscher, R. McPherson, J. Huston, …

20-Dec-2004J. Pilcher6 Preliminary commissioning already being done  Combined test beam in 2004  Tilecal operation on cosmic muons in Bldg. 185  LAr operation on cosmic muons in Bldg. 180  Muon chamber operation with cosmics  TileCal barrel on HF truck in UX15 Commissioning is iterative with larger scale integration at each step

20-Dec-2004J. Pilcher7 Now: TileCal Commissioning on HF Truck in UX15 Photo from September 28, 2004 Record data from UX15 testing TTC, CANbus, HV, laser fibres via LED, 100 kHz L1A, CIS, readout noise, … Charge Injection Pulses OK Noise Test OK RMS (ADC counts)

20-Dec-2004J. Pilcher8 Barrel calorimeters move to z=0 August 2005 when BT is assembled  Detectors fully assembled and equipped with on-detector electronics  Connect to services  Stand-alone commissioning with calibration systems  Eg. for TileCal (1/2 the system) –Charge injection to all readout channels (4K in barrel) –Cesium source activates tiles and fibers (220K in barrel) –Laser system activates each PMT (4K in barrel)  First large-scale detailed commissioning

20-Dec-2004J. Pilcher9 Charge Injection Calibration of TileCal Pulse individual channels over full dynamic range  establish gain, linearity, stability Uncorrected channel-to-channel uniformity RMS ~ 1.3 counts/pC (1.6%) Gain variation over 4 months of CTB RMS ~ 0.2%

20-Dec-2004J. Pilcher10 Cs Calibration of TileCal Cs-137 source illuminates individual tiles  Stainless tubes pass through all tiles in the system  Source capsule driven through tubes hydraulically  Single tile response measured at 2% level  Cell response measured at 0.3% level  Week-to-week variations in cell response ~ 0.5%

20-Dec-2004J. Pilcher11 Cosmic Ray Commissioning Full G3 simulation done by Rob McPherson and Pavel Nevski

20-Dec-2004J. Pilcher12 Cosmic Ray Commissioning Rates are substantial  2.3 KHz for a hit anywhere in detector  0.5 Hz for |Z| < 60 cm, R < 20 cm Natural to trigger with muon system RPCs + … Global ATLAS cosmic muon run planned for 40 days in April 2007 before LHC starts Attractive to run barrel calorimeters on cosmics from late 2005  Before RPCs available  Evaluated trigger using TileCal  back-to-back trigger towers

20-Dec-2004J. Pilcher13 TileCal Response to Muons Test beam data for 180 GeV muons at  =0.05 Energy depends on path length through calorimeter 1K muons in a tower gives response to 1% S/N ~ 40 Tower Energy (pC) (~1.1 pC/GeV)

20-Dec-2004J. Pilcher14 TileCal Cosmic-Muon Trigger Consider back-to-back TileCal towers   x  =0.1 x 0.1, full calorimeter depth  Especially useful because tracks pass close to interaction point  Analyze McPherson/Nevski simulation for rate and event properties  S. Zenz (Chicago undergraduate)

20-Dec-2004J. Pilcher15 TileCal Cosmic-Muon Trigger Require 2 back-to-back towers with E > 1.5 GeV  Lower peak corresponds to additional towers struck (corners clipped) Rate is ~ 130  /hr for 16 top + 16 bottom modules in coincidence ~ 100K / month

20-Dec-2004J. Pilcher16  -distribution of muons passing Tilecal trigger PX14PX16 D = 18 m D = 12.6 m Effect of PX14 shaft is clearly seen TileCal Cosmic-Muon Trigger

20-Dec-2004J. Pilcher17 Typical Events

20-Dec-2004J. Pilcher18 Typical Events (2/2) Example of muon scattering in detector

20-Dec-2004J. Pilcher19 Muons in LAr Barrel Due to Accordion geometry, muons are reconstructed in middle compartment by summing two cells in . S(  )/N  7 Barrel middle compartment Test-beam data With 100 events muon signal in LAr can be measured with ~ 3% precision For first shake-down Could use cosmic ray muons to measure first LAr physics pulse shapes and compare to calibration pulses. Useful to reconstruct combined muons in LAr + TileCal to match EM energy scale and timing. Note : S/N ratio too small in strip and back compartments

20-Dec-2004J. Pilcher20 Muons in LAr Using TileCal Trigger TileCal Trigger tower size (0.1  0.1) corresponds to 4  4 LAr middle cells Resulting maximum non-projectivity :  3º, muons can cross at most 2 cells in  and in   non-projectivity probably not a problem, due to natural sharing between  cells (two cells are summed) Cell Energy  Studies of rate in LAr using TileCal cosmic trigger (back-to back towers) by Philippe Schwemling and Emmanuel Monnier. Est. ~ 6 months run

20-Dec-2004J. Pilcher21 With ~ 100 muons/cell in middle compartment Check calorimeter timing to < 1 ns  input to optimal filtering in ROD Check calorimeter position in  /  wrt other sub-detectors to < 1 mm  t = 1.62 ns/E (GeV) + 19 ps (from calibration) Muons E~300 MeV  t ~ 6 ns Test-beam data 1% precision measured with ~1000   with ~ 5000  : 0.5 % precision (~ 100  /cell integrated over  )

20-Dec-2004J. Pilcher22 Hardware Needed for TileCal Cosmic Trigger Electronics drawers in barrel (128) LV power (in TileCal fingers)  Bulk LV power (200V for USA15) Cabling and fibers TTC hardware  Standalone clock LVL1 trigger interface hardware  Patch panels to separate tower and muon signals  Receiver boards (64 towers each)  Initially use custom trigger logic for cosmic ray running ROD/LVL2 hardware  ROD modules, ROD crate and controller (ROD crate DAQ)  Output hardware from ROD crate to PC via Ethernet  Later use ROBIN/ROS

20-Dec-2004J. Pilcher23 TileCal Muon Trigger Logic LVL1 trigger not designed to run on back-to-back muons  Adapting it would be a diversion  Also scheduled to arrive late compared to initial stand-alone calorimeter operation Build some simple coincidence logic Test by injecting muon signal into trigger tower  Vary tower threshold and check efficiency

20-Dec-2004J. Pilcher24 Time Table for Cosmic Ray Commissioning TileCal barrel complete Mar-06 (following checkout)  Stand alone operation begins LAr barrel complete Aug-06 (following checkout)  Stand alone operation begins Global commissioning Dec-06 through Feb-07 ATLAS cosmic run  Mar-07 through Apr-07 ATLAS ready for beam 4/27/07

20-Dec-2004J. Pilcher25 First commissioning with single beam Beam halo muons  Generated by machine group  Simulated in ATLAS Beam gas events Beam-gas Beam-halo Scoring plane

20-Dec-2004J. Pilcher26 A “typical” beam-gas event Beam-gas collisions are essentially boosted minimum-bias events  low-p T particles Rate : ~ 2500 interactions/m/s

20-Dec-2004J. Pilcher27 Beam-gas Rates & Properties Vertex Z Rate (Hz) Total Vertex Z Rate (Hz) Total (2 months,  =30%) (2 months,  =30%)  23 m 1.2x10 5  23 m 1.2x x10 11  3 m 1.6x x10 10  20 cm 1.1x x10 9   p T > 1 GeV 1.0x x10 9 inside  3m  p T > 1 GeV 0.3x x10 8 inside  3m E T spectrum in ECAL E spectrum in FCAL E T charged particles

20-Dec-2004J. Pilcher28 Beam Halo Muons Total  rate 105 kHz E  > 10 GeV 16 kHz E  > 100 GeV 1 kHz E  > 1 TeV 10 Hz L=10 34 Muons at cavern entrance Especially useful for endcaps and ID disks and wheels

20-Dec-2004J. Pilcher29 Beam-Halo Rates Estimate rates for 200 times less current than design  Totals in table for 2 month run at 30% efficiency DetectorRate (B-field off ) Total (B-field off) Rate (B-field on) Total (B-field on) MDT barrel15 Hz2.5x Hz1.5x10 8 MDT end- cap 145 Hz2.5x Hz2.5x10 8 Pixel/SCT1.8/17 Hz 3x10 6 / 3x10 7 2/19 Hz 3x10 6 / 3x10 7 EM E > 5 GeV 2 Hz3.5x Hz1.7x10 6 Tile/HEC E > 20 GeV 1.7/1.2 Hz2.9/2.1x /0.9 Hz2.8/1.6x10 6

20-Dec-2004J. Pilcher30 Triggering on Beam Halo and Beam-Gas events Minimum-bias scintillators being added in front of LAr end caps  z ~ ± 3.5 m  14 cm < R < ~ 100 cm  ~1.9 <  < ~3.9  8 channels in , 2 channels in   Readout via TileCal electronics drawer Joey Huston is project leader on this.

20-Dec-2004J. Pilcher31 Conclusions Good prospects for progressive commissioning process  Stand alone detector systems with calibration systems and cosmic muons  Global detector with cosmic muons  Beam halo muons and beam-gas events in early 2007  Minimum bias beam-beam interactions by mid 2007 Fully simulated samples of cosmic muons, beam-halo muons and beam gas events exist  R. McPherson et al. Final commissioning phase will be with physics signals  Essential for final tune-up  Essential for showing we understand the detector behavior