DOE Rev of Run IIb Sep 24-26, 2002  1.1.7 - Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

March 24-28, 2003Computing for High-Energy Physics Configuration Database for BaBar On-line Rainer Bartoldus, Gregory Dubois-Felsmann, Yury Kolomensky,
23/04/2008VLVnT08, Toulon, FR, April 2008, M. Stavrianakou, NESTOR-NOA 1 First thoughts for KM3Net on-shore data storage and distribution Facilities VLV.
O. Stézowski IPN Lyon AGATA Week September 2003 Legnaro Data Analysis – Team #3 ROOT as a framework for AGATA.
LCFI physics studies meeting, 28 th June 05 Sonja Hillertp. 1 Report from ILC simulation workshop, DESY June Aim of workshop: preparation for Snowmass;
David Ward/Nigel WatsonCalice UK, 10-Nov-2004 Future Simulation Scope  The deliverables after 3 years will include 1.Published analysis of electron test.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
CSC DQA and Commissioning Summary  We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility  We are ready for.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
7/19/2004FTPC Review - J. Seyboth1 FTPC Review - Software Janet Seyboth for the FTPC group DAQ Online Calibration Databases Offline Documentation FTPC.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
CLAS12 CalCom Activity CLAS Collaboration Meeting, March 6 th 2014.
SVX Software Overview Sasha Lebedev VTX meeting 09/07/ SVX Software web page:
REVIEW OF NA61 SOFTWRE UPGRADE PROPOSAL. Mandate The NA61 experiment is contemplating to rewrite its fortran software in modern technology and are requesting.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
ALCPG Simulation Status and Plans ECFA LC Workshop, Durham Sep. 2, 2004 Norman Graf (SLAC)
ALCPG Simulation Status and Plans ACFA LC Workshop, Taipei Nov. 10, 2004 Norman Graf (SLAC)
Teams: Simulation of key experiments Gamma-ray tracking Data analysis Databases Simulation and Data Analysis Working Group Department of Radiation Sciences.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
GlueX Software Status April 28, 2006 David Lawrence, JLab.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
DPA follow-up review, Malargüe, Nov/2000 DPA Data Processing and Analysis Task Follow-up Review Malargüe, November 14, 2000.
MINER A Software The Goals Software being developed have to be portable maintainable over the expected lifetime of the experiment extensible accessible.
24/06/03 ATLAS WeekAlexandre Solodkov1 Status of TileCal software.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
SiD performance for the DBD Jan Strube CERN. Overview Software Preparation (CERN, SLAC) Machine Environment (CERN, SLAC) Tracking Performance (C. Grefe)
1 Using Jupiter and Satellites Akiya Miyamoto KEK Jan 2006.
Cosmic Rays for ATLAS Commissioning Commissioning Meeting ATLAS Physics Workshop Athens May 2003 Halo+Cosmics group: M.Boonekamp, F.Gianotti, R.McPherson,
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Rev of Run IIb, Nov 4-8, 2002, A. Bean 1 Silicon Management  Organization and Management  Schedule  Resources  Conclusions Alice Bean Univ. of Kansas.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Claudio Grandi INFN-Bologna CHEP 2000Abstract B 029 Object Oriented simulation of the Level 1 Trigger system of a CMS muon chamber Claudio Grandi INFN-Bologna.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Ties Behnke: Event Reconstruction 1Arlington LC workshop, Jan 9-11, 2003 Event Reconstruction Event Reconstruction in the BRAHMS simulation framework:
O 2 Project Roadmap P. VANDE VYVRE 1. O2 Project: What’s Next ? 2 O2 Plenary | 11 March 2015 | P. Vande Vyvre TDR close to its final state and its submission.
T. Lari – INFN Milan Status of ATLAS Pixel Test beam simulation Status of the validation studies with test-beam data of the Geant4 simulation and Pixel.
John MarshallPandora Development1 J.S. Marshall University of Cambridge.
USCMS Physics, May 2001Darin Acosta1 Status Report of PRS/  D.Acosta University of Florida Current U.S. activities PRS/  Activities New PRS organization.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Prospects for Integrating Veloroot into GAUDI D. Steele - 24/11/1999.
2014 CalCom Activity Plan based on last year’s work and open discussion: Periodic meetings with detector groups to discuss algorithms, discuss software.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
SIlicon VErtex TrAcker Rather than fixed common geometry the common analysis and simulation tools are needed. Such software package should provide : 
Object Oriented reconstruction of the CMS muon chambers CHEP February, Padova Annalina Vitelli - INFN Torino.
Some GPU activities at the CMS experiment Felice Pantaleo EP-CMG-CO EP-CMG-CO 1.
Software Week - 8/12/98G. Poulard - CERN EP/ATC1 Status of Software for Physics TDR Atlas Software Week 8 December 1998 G. Poulard.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ACOS Report ATLAS Software Workshop December 1998 Jürgen Knobloch Slides also on:
Lcsim software: status and future plans ECFA-LC DESY May 30, 2013 Norman Graf (for the sim/reco group)
VI/ CERN Dec 4 CMS Software Architecture vs Hybrid Store Vincenzo Innocente CMS Week CERN, Dec
Status of PSD simulation in Shine Oleg Petukhov Institute for Nuclear Research, Moscow NA61 Analysis/Software/Calibration meeting , Warsaw.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
1 SLAC simulation workshop, May 2003 Ties Behnke Mokka and LCDG4 Ties Behnke, DESY and SLAC MOKKA: european (france) developed GEANT4 based simulation.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
CLAS12 DAQ & Trigger Status
Propagation of Reconstructed Tracks
CLAS12 software workshop
Data Quality Monitoring of the CMS Silicon Strip Tracker Detector
Linear Collider Simulation Tools
LEARNING & DEVELOPMENT STRATEGY: PROCESS OVERVIEW
Presentation transcript:

DOE Rev of Run IIb Sep 24-26, 2002  Silicon software and simulation Scope:  Design and/or modify software tools for Run IIb silicon tracker simulation and commissioning Elizaveta Chabalina University of Illinois at Chicago For Run IIb software and simulation group

DOE Rev of Run IIb Sep 24-26, 2002  Run IIb software tasks  Develop and support software tools for design, optimization and performance evaluation of Run IIb silicon tracker  Develop and support software packages for Run IIb SMT tracker system tests and commissioning

DOE Rev of Run IIb Sep 24-26, 2002  Software project overview Run IIb silicon software and simulation Design and simulation tools Software for SMT commissioning online/offline data analysis calibration production data base – – monitoring

DOE Rev of Run IIb Sep 24-26, 2002  Design and simulation tools  Implement new SMT geometry in D0gstar (D0 Geant)  Modify SMT hit storage interface  Modify SMT hit digitization package  Modify SMT cluster reconstruction package  Create standalone package for track reconstruction « DONE » Results of the simulation of SMT performance are presented in TDR

DOE Rev of Run IIb Sep 24-26, 2002  Data flow and associated packages Level 3 packed RawDataChunk Level 3 packed RawDataChunk unpack_reco Data unpacking UnpDataChunkunpack_reco Data unpacking UnpDataChunk smtraw Electronic into physical data structure translation SmtDataChunksmtraw Electronic into physical data structure translation SmtDataChunk Data collector Collects the data Data collector Collects the data Data distributor Distributes the data Data distributor Distributes the data smt_event_display Displays SMT hitssmt_event_display Mapping information smt_examine Produces detector level histogramssmt_examine – –

DOE Rev of Run IIb Sep 24-26, 2002  Schedule for data analysis packages Level 3 unpack_reco 6 weeks 10/03/02-11/13/02unpack_reco 6 weeks 10/03/02-11/13/02 smtraw 24 weeks 11/14/02-04/30/03smtraw 24 weeks 11/14/02-04/30/03 Data collector Data distributor smt_event_display 17 weeks 05/02/03-08/25/03smt_event_display 17 weeks 05/02/03-08/25/03 Mapping information 10/21/02 Mapping information 10/21/02 smt_examine 20 weeks 01/23/03-06/12/03smt_examine 20 weeks 01/23/03-06/12/03 multi hybrid full chain test 08/11/03 multi hybrid full chain test 08/11/03 Analysis macros 8 weeks 03/13/03-08/08/03 Analysis macros 8 weeks 03/13/03-08/08/ – –

DOE Rev of Run IIb Sep 24-26, 2002  Basis of estimate RunIIaRunIIb packagesdurationmanpowerdurationmanpower Changes required unpack_reco smtraw 52 w significant smt_examine 52 w Very significant analysis macros 8 Very significant smt_event display 18 Very significant

DOE Rev of Run IIb Sep 24-26, 2002  Manpower  Consists of 4 persons right now  Universities involved : KSU, UIC, Northwestern University  Develop and support existing Run IIb simulation software: F.Rizatdinova, A.Khanov (KSU) and E.Chabalina (UIC)  Software development and support for the Run IIb commissioning: 2 postdocs + student (12 months)  Calibration and monitoring: 2 postdocs and student from Northwestern University

DOE Rev of Run IIb Sep 24-26, 2002  Conclusions  Simulation tools have been developed and extensively used for both SMT design and performance evaluation  Standalone reconstruction code has been developed and used for the physics performance evaluation  All Run IIb simulation packages are in the standard D0 code repository – available for everyone  Tasks – have been successfully completed in time  The scope of the silicon Run IIb software project is well understood and the estimates for both time scale and manpower based on the Run IIa experience are proved to be realistic.