“DIRAC-PHASE-1” – Construction stage 1 at the international Facility for Antiproton and Ion Research (FAIR) at GSI, Darmstadt Task 8 - HADES1 Resistive.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

The MAD chip: 4 channel preamplifier + discriminator.
Daniel Belver 5. CBM Col. Meeting – GSI. March 11th The Front End Electronics for the HADES RPC wall (ESTRELA_FEE) Daniel Belver (University of Santiago.
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
Hadron Physics (I3HP) activities Hadron Physics (I3HP) is part of Integrated Activity of 6’th European Framework. Contract has a form of consortium of.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Trigger-less and reconfigurable data acquisition system for J-PET
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
LV boards Detector 8 m 2 6 sectors 8 m 2 6 sectors 8 m 2 6 sectors EPICS CLIENT SCS for custom hardware is also based on EPICS, with the particularity.
FEE design, What is available and what is next? Mircea Ciobanu 11 th CBM Collaboration Meeting February 26-29, 2007, GSI FEE1 PADI.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
ETRAX CRIS architecture and Xilinx FPGA Peter Zumbruch Experiment control systems group GSI (KS/EE)
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
HADES Upgrade for DIRAC-Phase-1 P. Salabura Jagiellonian University Kraków, GSI Darmstadt.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
18/03/2010 DPG Bonn – March Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni.
RPC upgrade for the HADES Tracking: MDC e -,e + identification with RICH- TOF/PreShower  0.4 GeV/c TOF is not sufficient- Pre-Shower p,  identification.
Kraków4FutureDaQ Institute of Physics & Nowoczesna Elektronika P.Salabura,A.Misiak,S.Kistryn,R.Tębacz,K.Korcyl & M.Kajetanowicz Discrete event simulations.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Electronic developments for the HADES RPC wall: overview and progress
New RPC Front-End Electronics for HADES
LAV status report for the NA62 LAV working group Preliminary test beam results Future activities Progress on simulation A. Antonelli INFN-LNF SPSC meeting.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Daniel Belver IX Workshop on RPC and Related Detectors, Mumbai February 13-16th 2008 Performances of the Front End Electronics for the HADES RPC wall in.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
SP- 41 magnet ZDC RPC (TOF) DC ST Target T0 detector MPD / NICA and / Nuclotron Experiments Picosecond Cherenkov detectors for heavy ion experiments.
STT read-out concepts Detectors requirements and layout Read-out concepts Developments of Analog FE and Digital Boards STS el. group : INFN, FZ Juelich,
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
The Slow Control System of the HADES RPC Wall Alejandro Gil on behalf of the HADES RPC group IFIC (Centro Mixto UV-CSIC) Valencia, 46071, Spain IEEE-RT2009.
The HADES timing RPC Inner TOF Wall P.Fonte for the HADES RPC group DIRAC phase1 9th International Workshop on Resistive Plate Chambers and Related Detectors.
RIGEL: an Rpc-like sIgnals GEnerator for Laboratory testing N.Montes P.Amado, P.Fonte, J.A.Garzón, A.Gil University of Santiago de Compostela -Spain- labCAF.
Daniel Belver VIII Workshop on RPC and Related Detectors, Seoul October 10th 2005 The Front End Electronics for the HADES RPC wall (ESTRELA-FEE) Daniel.
Beam detectors in Au+Au run and future developments - Results of Aug 2012 Au+Au test – radiation damage - scCVD diamond detector with strip metalization.
Michael Traxler, GSI1 DAQ: Status of Upgrade Outline EU-Contract and BMBF money Readout and IPU-boards –MU V2 –TOF-Readout and IPU TRB V2 –Test-Board.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Spectrometer Timing Detector MRPC option
RPC – status / results Blanco On behalf of HADES RPC Group
Performance of the HADES-TOF RPC wall in a Au-Au beam
Beam detectors performance during the Au+Au runs in HADES
RPC with strip readout Last results from test of timing glass
LIP’s interest in SHiP P. Fonte.
Start Detector for pion experiments
Alternative FEE electronics for FIT.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
DCH FEE 28 chs DCH prototype FEE &
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
Participation in the HADES experiment
University of California Los Angeles
BESIII EMC electronics
Presentation transcript:

“DIRAC-PHASE-1” – Construction stage 1 at the international Facility for Antiproton and Ion Research (FAIR) at GSI, Darmstadt Task 8 - HADES1 Resistive Plate Chamber (RPC) Time of Flight Wall P.Fonte LIP-Coimbra Construction of a high-granularity and large area time of flight wall for the HADES spectrometer based on Resistive Plate Counters technology. Production of fast, wide-band, analog electronic and multi-hit digital electronic with the aim to achieve time resolution better than 100 ps and feasible to run in a high multiplicity environment of heavy ion collisions. 2 nd Annual Report meeting GSI,

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Participants & Tasks InstituteTaskPeople GSI Gesellschaft für Schwerionenforschung mbH Darmstadt, Germany Electronics production. General coordination. D. Gonzalez, W. Koenig, M.Traxler INR Institute for Nuclear Research Russian Academy of Science Moscow, Russia Particle identification software. F. Guber JU M. Smoluchowski Institute of Physics Jagiellonian University Kraków, Poland Digital time-measurement electronics. M. Kajetanowicz, K. Korcyl, W. Krzemien, M. Palka, P. Salabura, R. Trebacz LIP- Coimbra Laboratório de Instrumentação e Física Experimental de Partículas Coimbra, Portugal RPC detectors and gas enclosures. Task coordination. A.Blanco, L.Lopes, N.Carolino, A.Pereira, P.Fonte, C.Silva, O.Orlando USC Departamento de Física de Partículas, University of Santiago de Compostela, Compostela, Spain Analog front-end electronics. Detector software. D. Belver, P.Cabanelas, E. Castro, J.A. Garzon, M.Zapata (Techn) Along with an important contribution of CSIC, Valencia: A.Gil.

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Workplan status Read-out board design freeze- out 2 full chambers produced Full system test FEE design freeze-out 6 full chambers produced Today Beamtime next week

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Detectors (prototype sextant) LIP

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Detectors (prototype sextant) LIP

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Detectors (prototype sextant) Crosstalk on the 1-2 mV/V level at 300MHz LIP

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Detectors (prototype sextant) LIP

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Detectors (prototype sextant) LIP

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Motherboard (MB) + Daughterboard (DB) philosophy. DB Step5 (4 channels): 1) Amplifier stage → Ph-BGM Q-ToT stage with TI OPA690. 2) Discriminator stage: - Dual MAX 9601 discriminator. One discriminator/channel. - PECL-LVDS TI SN65LVDS100 converter. - BFT92 transistor for multiplicity trigger sum. 3) Output: 40-pin SAMTEC HSEC8 connector MB (32 channels) by CSIC Valencia : - Provides regulated Voltage, DAC thresholds, test pulses, output path to DAQ… 4 ch. out C ToT Integrator Amplifier Step PECL- LVDS ToF-Threshold In OPA690 Wideband Op. Amplifier BGM1013 (35dB, 2GHz) MAX9601-2ch 500ps Propagation Delay SN65LVDS100 C Latch enable/ R 2k2 Trigger Out. Σ 4ch. BFT92 Wideband PNP Transistor Discriminator Step Q Q/ R C 2nd integration RC=20ns Task: FEE design USC, GSI, U.Valencia: ESTRELA FEE Frozen in February 2007

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Motherboards Daugtherboards provided (+ power supplies) by CSIC,Valencia (not in this project) Task: FEE prototype USC, GSI, U.Valencia: ESTRELA FEE

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Task: FEE prototype USC, GSI, U.Valencia: ESTRELA FEE

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Task: FEE prototype status USC, GSI, U.Valencia: ESTRELA FEE - DBs 108 DBs boards manufactured 95 of them has been loaded and tested: 83 with 4ch working 8 with only 3 ch working 3 with only 2 ch working 1 has a shortcut - MBs 15 MBs manufactured, 12 MB loaded, tested and working 3 MBs lack components: 1 MB with one resistor missing 2 MB with some capacitor missing 5 miniMBs manufactured 4 loaded and working properly Summary: All MBs and miniMBs mounted on the detector with 362channels (=181cells) working 50ch (=25cells) not instrumented (around 12%)

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Task: Software USC Slow control - Thresholds DACs controlled individually, from a PC, via SPI protocol - Measurement of the temperatures sensors at the TRB is ready - Slow control to be implemented in EPICS not ready Detector software Almost all the decoding and calibration basic programs are already written and implemented in the HADES standard analysis framework Hydra. - Lookup table: sector/column/cell/side DAQ channels and FEE address - Decoding/Calibration chain from raw data to hit level (including diagnostic and monitoring histograms) - Programs correlating RPC hits with MDCs and Shower hits for efficiencies analysis - Macros for the analysis of time and position resolution and FEE performances - Simulation of C-Be collisions at the hit level in order to compare the results with the expected distributions.

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Task: Readout board production TRB Features: ➢ Four HPTDC each 32 channels => 128 channels ➢ Single chip computer with 100MBit/s Ethernet ➢ FPGA as board controller ➢ DC/DC 48V ➢ Buffer Memory Status: In production ➢ The board was fully integrated with HADES DAQ environment ➢ Was used for readout in Nov 2005, May 2006 and April-May 2007 beam times ➢ It is running stably with up to 80kHz LVL1 (for small events) and 20 kHz LVL2 rate, ➢ data rate to 1.2 MB/s 12/24 units have been produced JU, GSI

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Major difficulties (mechanics) HV distribution Full redesign: epoxy isolation (unreliable)  seamless acrylic box Mechanical drawing Needed to learn new CAD tool  perfect prototype

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Major difficulties (electronics) Design GHz-bandwidth dense mixed-signal circuit – not easy (frozen February 2007) Production Component ordering difficulties Loading went not so well – lots of rework needed HADES April-May beam time got on the way

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting M3: Full system prototype Full-system prototype 400 time+charge channels Beamtime next week

DIRAC-PHASE-1 TASK 8 – HADES1: Resistive Plate Chamber TOF WallP.Fonte 2 nd Annual Report meeting Workplan update M32M33M34M35M36M37M38M39M40M41M42M43M44M45M46M47M SIS shutdown    