1 DSCI 3123 Process Planning And Technology Process Strategy Process Planning Make-Or-Buy Decisions Process & Specific Equipment Selection Process Analysis.

Slides:



Advertisements
Similar presentations
Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Advertisements

Process Strategy and Capacity Planning
Strategic Capacity Planning for Products and Services
Strategic Capacity Planning for Products and Services McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
WEEK 04C – PROCESSES AND TECHNOLOGY (CH 6) Process types and selection, automation, line balancing SJSU Bus David Bentley1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Processes, Technology, and Capacity Operations Management -
Processes and Technologies
Chapter 3 - Product Design & Process Selection
Design, pageRaffoBA Design and Technology Design, pageRaffoBA Scope of Operations Support from Accounting, Finance, Human Resources, Information.
Chapter 9 Cost Concepts in Economics
Processes, Technology, and Capacity
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Process Planning, Analysis, and Reengineering.
Product Design and Process Selection
Breakeven Analysis Quantitative Tool for Evaluating Alternatives.
Chapter 6 Product Design & Process Selection-Manufacturing
1 BREAKEVEN ANALYSIS Introduction Introduction What is Break-even Analysis? What is Break-even Analysis? Break-even in comparing alternative propositions.
BMM4733_Quality Engineering
Chapter 3 – Product Design & Process Selection
MGT3303 Michel Leseure Process Management MGT3303.
Breakeven Analysis for Profit Planning
Flexible Manufacturing Systems
5.3 Break-Even Analysis Chapter 32.
Process Selection and Capacity Planning
Designing Goods and Services and Process Selection
Manufacturing Process Selection and Design
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 4 Processes and Technologies.
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Processes and Technology Operations Management - 6 th Edition.
Chapter 4 & Chapter 5 Process Planning And Technology Decisions.
Chapter 6: pp 209 to 225; [Chapter 7: Service] Process Planning And Technology Decisions for Manufacturing Operations.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 4 Processes and Technology.
1/20 Operations Management Break-Even Analysis - Lecture 4.2 Dr. Ursula G. Kraus.
Chapter 6 Production Processes.
© 2005 Wiley Chapter 3 - Product Design & Process Selection Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Processes, Technology, and Capacity Operations Management -
Reid & Sanders, Operations Management © Wiley 2002 Product Design & Process Selection 3 C H A P T E R.
© 2007 Wiley Chapter 3 - Product Design & Process Selection.
© 2005 Wiley Chapter 3 - Product Design & Process Selection Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint.
DECISION-MAKING SYSTEMS Decision Support Software & Artificial Intelligence (especially Expert Systems)
Processes, Technology, and Capacity
1-1 1 Chapter 7 Manufacturing Processes Process Flow Structures Job shop (ex. Copy center making a single copy of a student term paper) Batch shop.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 4 Processes and Technology.
Break-Even Analysis Study of interrelationships among a firm’s sales, costs, and operating profit at various levels of output Break-even point is the Q.
Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms: determining.
Designing Goods and Services and Process Selection Chapter 3.
Process Planning, Analysis, and Reengineering Kusdhianto Setiawan, SE, Siv.Øk Department of Management Faculty of Economics Gadjah Mada University.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Lecture 3 Cost-Volume-Profit Analysis. Contribution Margin The Basic Profit Equation Break-even Analysis Solving for targeted profits.
Designing Goods and Services and Process Selection
Breakeven Analysis Improving Productivity. Break-Even Analysis Break-even analysis has TWO forms: – A. CVP (cost-volume-profit): to determine the volume.
Operations Fall 2015 Bruce Duggan Providence University College.
7-1 Break-even Example 1 A firm produces radios with a fixed cost of $7,000 per month and a variable cost of $5 per radio. If radios sell for $8 each:
1 Management Science. 2 Chapter Topics The Management Science Approach to Problem Solving Model Building: Break-Even Analysis Computer Solution Management.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Break-Even Analysis Chapter 6a.
EGR Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms:
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 4 Processes and Technologies.
Processes and Technology
Developing Capacity Alternatives
Flexible Manufacturing Systems
Process Planning And Technology
Process Design and Technology
BREAK EVEN ANALYSIS.
Introduction to Scheduling Chapter 1
Capacity Planning For Products and Services
Production and Operations Management
Improving Productivity
Capacity Planning For Products and Services
Break-Even & Crossover Analysis
Presentation transcript:

1 DSCI 3123 Process Planning And Technology Process Strategy Process Planning Make-Or-Buy Decisions Process & Specific Equipment Selection Process Analysis Information Technology Manufacturing Technology

2 DSCI 3123 Process Strategy Approach to producing goods &services Process strategy defines –Capital intensity & investment –Process flexibility –Vertical integration –Customer involvement

3 DSCI 3123 Process Planning Make-or-buy decisions Process & specific equipment selection Process plans & process analysis

4 DSCI 3123 Make-Or-Buy Decisions 1. Cost 2. Capacity 3. Quality 4. Speed 5. Reliability 6. Expertise

5 DSCI 3123 Process & Specific Equipment Selection 1. Purchase cost - basic price, installation, programming, support 2. Operating cost - $ assoc. with operation, maintenance, repair, etc. 3. Annual savings - $ saved from less: labor, material, rework & scrap 4. Revenue enhancement - improved quality, lower cost, more flexible 5. Replacement & risk analysis - salvage value, replacement cycle, expected life, operating cost, risk-adjusted hurdle rates

6 DSCI 3123 Process Analysis Process flowchart and Process Maps –Standardized method for documenting steps in a process –Quality control and certification –Continuous improvement –Process maps are higher level Gantt Chart –Project management –Time management

7 DSCI 3123 Information Technology Management information systems (MIS) Decision support systems (DSS) Expert systems (ES) Artificial Intelligence (AI) –Neural networks –Genetic algorithms –Fuzzy logic

8 DSCI 3123 Manufacturing Technology Numerically controlled (NC) machines –used in cutting, boring, sawing, sewing, etc. Flexible Manufacturing Systems (FMS) –Networked computer/machine system providing easy changes, reducing setup & queue times, improving quality Computer Integrated Manufacturing (CIM) –Integration of design, manufacture & delivery via computer technology (CAD, CAM, CASE, etc.)

9 DSCI 3123 Process Selection w/ Break-Even Analysis For a single process, – find the breakeven point Among several processes, – find the point of indifference

10 DSCI 3123 Break-Even Analysis Total cost = total fixed cost + total variable cost TC = c f + vc v Total revenue = volume x price TR = vp Total profit = total revenue - total cost Z = TR - TC = vp - (c f + vc v ) where, c f = fixed cost, v = volume, c v = variable cost per unit, p =price per unit

11 DSCI 3123 Solving For Break-Even Point TR = TC vp = (c f + vc v ) vp - vc v = c f v(p - c v ) = c f v = c f p - c v

12 DSCI 3123 Break-Even Example Fixed cost c f = $2,000 Variable cost c v = $5 per raft Price p = $10 per raft v = = = 400 rafts c f p - c v

13 DSCI 3123 Break-Even Graph $0 $1,000 $2,000 $3,000 $4,000 $5, Units Dollars TC TR Break even point

14 DSCI 3123 Choosing Between Two Processes Find volume where Cost of process A = Cost of process B Above point of indifference, choose process with lowest variable cost Below point of indifference, choose process with lowest fixed cost

15 DSCI 3123 Point Of Indifference $3v = $8,000 v = 2,667 rafts $2,000 + $5v = $10,000 + $2v Process A Process B Below 2,667 rafts, choose A Above 2,667 rafts, choose B

16 DSCI 3123 Graphical Solution to Process Selection A B