TALENT Project Office Project administration TALENT Kick-off meeting 16.1.2012 CERN Hanna Juujӓrvi Training for cAreer deveLopment in high-radiation ENvironment.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Advertisements

Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Who does what and when? Mary Rowlatt MDR Partners.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
TALENT Training Programme and Outreach Activities WP7 Antti Heikkilä TALENT Kick-Off Meeting CERN, 16 th Jan, 2011.
Name Speaker This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which has received funding from the European.
Role of Management and Technical Coordination
TALENT Initial Training Network ATLAB Annual Assembly EDUSAFE ITN and TALENT ITN joint technology workshop February 18 th 2013 Didier Ferrere.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
The RCN & Unionlearn Projects in England. "We will increase workers’ life chances and strengthen their voice at the workplace through high quality union.
The Preparatory Phase Proposal a first draft to be discussed.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
JCN, Justice Cooperation Network European Treatment and Transition Management of High Risk Offenders Tallin, 13 March 2013 Second Steering Committee Meeting.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
M. Silari - ARDENT Kick-off meeting 1CERN, 8 May 2012 ARDENT implementation and execution M. Silari.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
International Bureau of the BMBF - Creating international research and education networks 1 Jörn Sonnenburg/ Martine Bonin Brussels 24 September 2009 ERA.Net.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
An Integrated Project under EU 6th Framework Programme Kick-off meeting, Hamburg September 2004 Chris Hewitt, Met Office Hadley Centre, UK
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
Highlights of ITN Administration Seamus Hegarty Human Resources Department – CERN TALENT Kickoff Meeting CERN 16 February 2011.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Kick-off Meeting ISPAVE, Rome, Italy Monday February 28 th 2005 V IRO T ICA Co-ordination of Research on Genetic Resistance to Plant Pathogenic Viruses,
Project with the support of the Lifelong Learning Programme of the European Union Find the Best Project Kick-off meeting Activities – distribution.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
Geneva, November 2013 Speaker: Peter Keinz
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
TALENT Supervisory Board Meeting TALENT Kick-off meeting CERN H. Pernegger Training for cAreer deveLopment in high-radiation ENvironment Technologies.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
Gabriela Macoveiu North-East RDA, Romania PP11 – WP responsible Cluster Policy Learning Platform WP3 Description Smarter Cluster Policies for South-East.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Highlights of ITN Administration Seamus Hegarty Human Resources Department – CERN ARDENT Kickoff Meeting CERN 8 May 2012.
CERN openlab Phase 5 Preparation (Technical) Alberto Di Meglio CERN openlab CTO office.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
PicoSEC : Project Management Etiennette Auffray, Network Coordinator CERN PH-CMX.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
1. Contractual Overview.  Grant Agreement  Recruitment  Reporting  Budget.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
AMICI WP1 – Management, coordination and dissemination
Overview of Structure General Data Protection Regulation (GDPR)
Timeline Roadmap Template
WP1 - Consortium coordination and management
Governance and Collaboration By-Laws
E-Rare and IRDiRC: Future collaboration perspectives?
PROGRAM CONSULTATIVE FORUM Meeting pack
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou

Student Administration and Support Programme and Project Timelines
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
AMICI WP1 – Management, coordination and dissemination
Legal and financial aspects of
Power of Choice (PoC) Program Overview

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
Presentation transcript:

TALENT Project Office Project administration TALENT Kick-off meeting CERN Hanna Juujӓrvi Training for cAreer deveLopment in high-radiation ENvironment Technologies 1

What is TALENT Project Office and what does it do? Training for cAreer deveLopment in high-radiation ENvironment Technologies 2

What is TALENT Project Office? A body that is designed to facilitate the network administration  Supports all the partners in the execution of the project  helps in planning and execution of network activities Responsible for the non-technical aspects of the network Assists the TALENT Network Coordinator Training for cAreer deveLopment in high-radiation ENvironment Technologies 3

TALENT Organization Training for cAreer deveLopment in high-radiation ENvironment Technologies 4

Members of the Project Office to outside world Training for cAreer deveLopment in high-radiation ENvironment Technologies Network coordinator Heinz Pernegger Deputy Network Coordinator Mar Capeans Training & Outreach Officer Antti Heikkilä Project Assistant Hanna Juujärvi 5 HR Coordinator Administrative Representative - Seamus Hegarty Legal Legal Officer - Karen Ernst Finance Financial Officer - Gregory Cavallo CERN MC ITN Services

Management and training support for partners Activity PartnerProject Office Milestone and deliverable reports Writes the report by using a provided template Compiles the reports Sends them further Non-technical reports (final, midterm, periodic) Provides inputs in their respective fields Prepares Submits Scientific and non-scientific meetings (workshops, conferences) Arranges Prepares Organizes Assists Training events (summer schools etc.) Prepares Chairs Executes Prepares in cooperation with partners Helps with the execution Assists partners and fellows Coordination of training events Schedules and prepares Distributes training support material Collects feedback Training for cAreer deveLopment in high-radiation ENvironment Technologies 6

Milestones and deliverables - responsibilities Training for cAreer deveLopment in high-radiation ENvironment Technologies 7

Milestone responsibilities Training for cAreer deveLopment in high-radiation ENvironment Technologies 8 Partner MilestoneWPMonth NIKHEF Carbon-fibre support prototypes for thermo-mechanical measurements 4December 2012 NIKHEF CO 2 Evaluation cooling system commissioned4March 2013 UiO Layout specification of ATLAS IBL5June 2012 UiO Pixel detector integration procedure5December 2012 UiO Integration tooling design5June 2013 UiO Simulation of thermo-mechanical properties5December 2013 UiO Integration and qualification prototype5June 2014 UNIGE IBL Engineering 3D CAD detector model4December 2013 WU-Wien Open interface to industry created6December 2012 WU-Wien KTT structure and ATLAS technology roadmap6June 2014 uBonn Pixel Module design3August 2012 uBonn Connectivity measurement of integrated sensor to FE ASIC assemblies3March 2013 uBonn ATLAS IBL Pixel supply and readout electr. demo3June 2014

Deliverable responsibilities 1/2 Partner DeliverableWPMonth UNIGE Carbon-fibre support mechanical and thermal specifications4August 2012 UBonn USB-Pix Setup for module tests commissioned3December 2012 Ubonn Pixel Sensor and FE ASIC qualification modules3June 2013 UBonn Full system test of module to DAQ3December 2014 UiO Pixel B-Layer simulation integration to ATLAS Simulation framework5December 2012 UiO Performance evaluation of B-Layer5December 2014 UiO Integration process commissioned5December 2014 UiO Pre-installation data quality and performance assessment5June 2015 Training for cAreer deveLopment in high-radiation ENvironment Technologies 9

Deliverable responsibilities 2/2 Partner DeliverableWPMonth NIKHEF Material recommendation on light-weight carbon-fibre support4December 2013 NIKHEF CO 2 cooling technology assessment4December 2014 WU-Wien KTT benchmarking best practices guidelines6December 2013 WU-Wien Report on KTT structure formation6October 2014 WU-Wien ATLAS technology Roadmap report6December 2013 WU-Wien ATLAS public funding Roadmap report6October 2014 Training for cAreer deveLopment in high-radiation ENvironment Technologies 10

Deliverable timeline 1/2 WPNoNo DeliverablePartner Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 1D-1.1WebsiteCERN 4D-4.1 Carbon-fibre support mech. and thermal specific. UNIGE 1D-1.2 Declaration of uniformity for each fellow (timetable: at appointment) CERN 2D-2.1 Technology prototypes SiSensor manufactured CERN 3D-3.1 USB-Pix Setup for module tests commissioned UBonn 5D-5.1 Pixel B-Layer simulation integration to ATLAS Simulation framework UiO 1D-1.3Progress reportCERN 2D-2.2 Planar&3D SiSensor characterization after irrad. CERN 3D-3.2 Pixel Sensor and FE ASIC qualification modules UBonn 7D-7.1Summer SchoolCERN 1D-1.4 Mid-term report and extended abstract from each fellow CERN 1D-1.5Mid-term questionnaire from each fellowCERN 1D-1.6 First periodic report and extended abstract from each fellow CERN Training for cAreer deveLopment in high-radiation ENvironment Technologies 11

Deliverable timeline 2/2 WPNoNo DeliverablePartner Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 2D-2.3 Optimized silicon sensor design for production CERN 24 4D-4.2 Material recommendation on light- weight carbon-fibre support NIKHEF 7D-7.2Joint Training coursesCERN 6D-6.1 KTT benchmarking best practices guidelines WU-Wien 6D-6.2Report on KTT structure formationWU-Wien 6D-6.3ATLAS technology Roadmap reportWU-Wien 6D-6.4ATLAS public funding Roadmap reportWU-Wien 3D-3.3Full system test of module to DAQUBonn 4D-4.3CO 2 cooling technology assessmentNIKHEF 5D-5.2Performance evaluation of B-LayerUiO 5D-5.3Integration process commissionedUiO 1D-1.7 Progress report and extended abstract from each fellow CERN 5D-5.4 Pre-installation data quality and performance assessment UiO 1D-1.8 Evaluation questionnaire from each fellow (end of fellowship) CERN 1D-1.9 Final report, second periodic report and extended abstract from each fellow CERN Training for cAreer deveLopment in high-radiation ENvironment Technologies 12

Milestone timeline 1/2 Training for cAreer deveLopment in high-radiation ENvironment Technologies 13 WPMSMilestonePartner Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 1M-1.1SB meetingCERN 7M-7.1Kick-off meetingCERN 2M-2.1 Definition of sensor specifications for different technology CERN 5M-5.1 Layout specification of ATLAS IBL UiO 3M-3.1Pixel Module designuBonn 7M-7.3Annual meeting 2011CERN 4M-4.1 Carbon-fibre support prototypes for thermo- mechanical measurements NIKHEF 5M-5.2 Pixel detector integration procedure UiO 6M-6.1 Open interface to industry created WU-Wien 2M-2.2 Bare Sensor prototypes characterized CERN 3M-3.2 Connectivity measurement of integrated sensor to FE ASIC assemblies uBonn 4M-4.2 CO 2 Evaluation cooling system commissioned NIKHEF

Milestone timeline 2/2 Training for cAreer deveLopment in high-radiation ENvironment Technologies 14 WPMSMilestonePartner Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 5M-5.3 Integration tooling design UiO 2M-2.3 Pixel Sensor performance studied in testbeams CERN 4M-4.3 IBL Engineering 3D CAD detector model UNIGE 5M-5.4 Simulation of thermo- mechanical properties UiO 6M-6.2 KTT structure and ATLAS technology roadmap WU-Wien 3M-3.3 ATLAS IBL Pixel supply and readout electr. demo uBonn 5M-5.5 Integration and qualification prototype UiO 7M-7.6Final conferenceCERN

Work Package Leaders and make-up of Supervisory Board and Executive committee Training for cAreer deveLopment in high-radiation ENvironment Technologies 15

Work Package Leaders WPWP name WP leader Partners recruiting Associated partners involved 1Project management Heinz Pernegger (CERN) 2Development of very radiation hard precision pixel sensors Heinz Pernegger (CERN) CERN, uBonn, Cis IBA, IFAE, CNM, CIVIDEC 3Development of radiation-hard high- density electronics, interconnection with sensors Norbert Wermes (uBonn) Fraunhofer, uBonn, uWuppertal IBA, CNM, CIVIDEC 4New mechanical integration methods Nigel Hessey (NIKHEF) NIKHEF, UNIGE, uWuppertal Composite Design 5Detector performance and system integration Ole Rohne (UiO), Didier Ferrere (UNIGE) CERN, Atostek, UNIGE, UiO 6Dissemination, knowledge transfer and external research funding Peter Keinz (WU-Wien) WU-WienA.D.A.M. 7Training Heinz Pernegger (CERN) Training for cAreer deveLopment in high-radiation ENvironment Technologies 16

Executive Committee Training for cAreer deveLopment in high-radiation ENvironment Technologies 17 WP2: Heinz Pernegger (CERN) Network Coordinator WP3: Norbert Wermes (uBonn) WP4: Nigel Hessey (NIKHEF) WP5: Didier Ferrere (UNIGE) WP6: Peter Keinz (WU-Wien) Mar Capeans Network Deputy Coordinator Seamus Hegarty (CERN) Coordinator Administrative Representative Chair of SB (ex-officio) Leader of Project Office (ex-officio) Project Assistant (ex-officio) WP5: Ole Rohne (UiO)

Responsibilities - Executive Committee Network’s managerial board Meets annually In charge of training programme (overall, scientific) Acts as the initiator of all activities of the network Reviews and steers the scientific and administrative work of the research projects Reports the progress of Work Packages at each meeting Advices and assists SB when required Checks that candidates match to projects and researcher profiles Provides follow-up to the Supervisory Board on organizational tasks Training for cAreer deveLopment in high-radiation ENvironment Technologies 18

Supervisory Board (all) Allan Clark (UNIGE) Cristobal Padilla (IFAE) Donatella Ungaro (A.D.A.M) Erich Griesmayer (CIVIDEC) Giulio Pellegrini (CNM) Heinz Pernegger (CERN) Jarkko Niittylahti (Atostek) Mattias Birkner (IBA) Mar Capeans Garrido (CERN), Deputy Network Coordinator Nigel Hessey (NIKHEF) Norbert Wermes (uBonn) Oswin Ehrmann (FRAUNHOFER) Peter Mättig (Wuppertal) Philipp Tuertscher (WU-Wien) Philippe Favre (Composite Design) Pietari Kauttu (bgator) Ralph Röder (CiS) Seamus Hegarty (CERN), Coordinator Administrative Representative Steinar Stapnes (UiO) Project representatives Training for cAreer deveLopment in high-radiation ENvironment Technologies 19

Responsibilities - Supervisory Board Ensures exchange of best training practices between partners Monitors and evaluates the overall progress of the research and training program Approves the implementation plan of the training program and changes to the program Approves the Consortium Agreement (CA) and Description of work (DoW), its amendments, the WP documents (its possible revisions), the IPR and Publication Policy rules The consent of the SB is required for possible changes in the appointments of the Network Coordinator and others responsible for the project Proposes re-assignements of projec tasks in case of a partner’s withdrawal Approves all documents and reports to be submitted to Research Executive Agency (REA) Training for cAreer deveLopment in high-radiation ENvironment Technologies 20

Thousands of kilometers apart - how do we pull this through? Training for cAreer deveLopment in high-radiation ENvironment Technologies 21

IT Collaborative tools Website – Dissemination purposes – Communication and information exchange between the network partners (and to outside as well) – Document storage and management – Outreach material database Indico – All meeting agendas (SB, EC, annual, kick-off) – Presentations – Minutes – Training events’ material (joint, summer, case studies workshops) EDMS – Technical papers – Sharing for the community (technical) Training for cAreer deveLopment in high-radiation ENvironment Technologies 22

Summary – PO responsibilities Helps with the non-technical aspects of the project – Prepares, organizes, assists in all TALENT meetings – Liases with CERN services for ITN and partners – Prepares and distributes training support material – Collects feedback from researchers – Prepares training events in collaboration with partners – Writes non-technical reports – Stores and manages documents Training for cAreer deveLopment in high-radiation ENvironment Technologies 23

Who do I contact? Project Assistant - Hanna Juujärvi Network Coordinator – Heinz Pernegger CA matters are discussed directly between Karen Ernst and partners Training for cAreer deveLopment in high-radiation ENvironment Technologies 24

Questions/Comments… Training for cAreer deveLopment in high-radiation ENvironment Technologies 25

Training for cAreer deveLopment in high-radiation ENvironment Technologies 26 COMPOSITE DESIGN