IDS120j WITHOUT GAPS AND WITH MAXIMUM SIZE GAPS ( aka ''NIGHTMARE'' CASE SCENARIO ) SC#4, SC#7 AZIMUTHAL DPD DISTRIBUTION ANALYSIS. Nicholas Souchlas,

Slides:



Advertisements
Similar presentations
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1. N. Souchlas BNL (Oct. 5, 2010)
Advertisements

IDS120j WITH/WITHOUT GAPS SH#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS Nicholas Souchlas, PBL (3/14/2012) 1.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
IDS120h: Be WINDOW DETAILED CALCULATION, SHIELDING VESSELS, RESULTS FOR DIFFERENT GLOBAL STEPS Nicholas Souchlas (9/20/2011) 1.
Energy Deposition of 4-MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Meeting, Feb. 9, 2010.
MC/NF TARGET SHIELDING STUDIES. NICHOLAS SOUCHLAS (10/29/2010)‏ 1.
ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE FermilabAccelerator Physics Center Nikolai Mokhov, Fermilab.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET NICHOLAS SOUCHLAS BNL Nov 30, 2010 ‏ 1.
Preliminary Analysis of the Target System Magnets 1.Version with a 6-T copper magnet insert 2.Version with a 6-T high-temperature superconductor insert.
Energy Deposition of 4MW Beam Power in a Mercury Jet Target Xiaoping Ding UCLA Target Studies Mar. 9, 2010 (Update of talk on Feb. 9, 2010)
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
Comparison of Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Jun. 29, 2010.
Power Deposition in SC1 Coil Xiaoping Ding UCLA Target Studies Apr. 20, 2010.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 3. NICHOLAS SOUCHLAS (10/28/2010)‏
IDS120h POWER DEPOSITION AND Hg POOL STUDIES Nicholas Souchlas (7/26/2011) 1.
STUDY II: m1507 vs. m1510 IDS120f: m1507/MCNP vs. M1510/MCNP vs. FLUKA IDS120f vs. IDS20g GEOMETRY IDS90f: B10/B11 SHIELDING RING(S) STUDIES Nicholas Souchlas.
SUPERCONDUCTING SOLENOIDS - SHIELDING STUDIES 1..
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
Study of a new high power spallation target concept
Energy deposition for intense muon sources (chicane + the rest of the front end) Pavel Snopok Illinois Institute of Technology and Fermilab December 4,
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
20to2T5m100cm Images Van Graves February 13, 2014.
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS EFFECTS OF Be WINDOW WATER.
SHIELDING STUDIES FOR THE MUON COLLIDER TARGET. (From STUDY II to IDS120f geometries) NICHOLAS SOUCHLAS (BNL)‏ ‏ 1.
DEPOSITED POWER STUDIES FOR THE MC/NF TARGET STATION. Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012) 1 DEPOSITED POWER STUDIES FOR THE MC/NF TARGET.
1 Energy Deposition of 4MW Beam Power in a Mercury Jet Target X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL The International Design Study for the.
IDS120j WITH GAPS SC#3 AZIMUTHAL DPD DISTRIBUTION ANALYSIS WITH MAX GAPS SC#3, SC#4 AZIMUTHAL DPD DISTRIBUTION ANALYSIS, DP AND SC TOTAL DP WITH VARYING.
IDS120h GEOMETRY WITH MODIFIED Hg POOL VESSEL. SIMULATIONS FOR 60%W+40%He SHIELDING (P12 'POINT') WITH STST SHIELDING VESSELS. BP#1(STST/W), SH#1, BeWindow,SC#8.
Particle Production at 3 GeV (update) X. Ding, UCLA Target Studies Sept. 23, /23/13.
Target Magnets & Shielding Bob Weggel Particle Beam Lasers, Inc. Magnet Optimization Research Engineering, LLC. March 5,
October 2005 Qweak Collaboration Meeting Detailed Design of Shield House and Collimators wrt Backgrounds Yongguang Liang Just getting started – will probably.
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE mars1510 ( DESKTOP ) vs. mars1512 ( PRINCETON CLUSTER ) Nicholas Souchlas, PBL (3/28/2012) 1.
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
Particle Production of Carbon Target with 20Tto2T5m Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies April 3, /3/14.
Beam Dump for Carbon Target with IDS120h Configuration at 6.75 GeV (Updated) X. Ding, UCLA Target Studies Jan. 24, /24/14.
Particle Production with Carbon Target and IDS120j Configuration at 3 GeV (update) X. Ding, UCLA Target Studies Nov. 14, /14/13.
Kinetic Energy Spectra of pi +, pi -, mu +, mu - and sum of all from the 20to4T5m Configuration X. Ding Front End Meeting June 23,
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Carbon Target Design and Optimization for an Intense Muon Source X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Winter Collaboration.
Chicane shielding and energy deposition (IPAC’13 follow-up) Pavel Snopok IDS-NF phone meeting June 4, 2013.
IDS120j WITHOUT RESISTIVE MAGNETS ( 20 cm GAPS AND 15.8 g/cc W BEADS ) AZIMUTHAL DPD DISTRIBUTION STUDIES FOR: BP#1, SH#1, SHVS#1/LFL, SC#1+SC#2, BeWind.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
Multiprocessing/MARS15(2012)/Princeton Cluster (IDS120j w/t Resistive Magnets: New Hg Module) X. Ding UCLA (4/11/2013)
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
Meson Production at Low Proton Beam Energy (Update) X. Ding, UCLA Target Studies May 9, /9/113.
IDS120i GEOMETRY. SIMULATIONS FOR 60%W+40%He SHIELDING WITH STST SHIELDING VESSELS. Hg vs. Ga DEPOSITED POWER DISTRIBUTION. (using Ding's optimized parameters)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
Dark Current in ILC Main Linac N.Solyak, A.Sukhanov, I.Tropin ALCW2015, Apr.23, 2015, KEK LCWS'15, Tsukuba, 04/2015Nikolay Solyak1.
Ids120h_side. ids120h_top ids120h_iso ids120h_end.
SHIELDING STUDIES FOR IDS80 (NO IRON PLUG/YOKE), ADDING SHIELDING IN 75 TO 80 cm (WC/H 2 O, B, Cd). NICHOLAS SOUCHLAS (BNL) Dec. 14, 2010‏ ‏ 1.
ENERGY FLOW AND DEPOSITION IN A 4-MW MUON-COLLIDER TARGET SYSTEM
IDS120h: PROTON P0-P14 TRAJECTORY FOOTPRINT
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
IDS120j WITHOUT RESISTIVE MAGNETS: NEW Hg MODULE
1 Nicholas Souchlas, PBL (11/15/2011)
1 Nicholas Souchlas (PBL) (MAP CONFERENCE SLAC 2012)
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Higgs Factory Backgrounds
Presentation transcript:

IDS120j WITHOUT GAPS AND WITH MAXIMUM SIZE GAPS ( aka ''NIGHTMARE'' CASE SCENARIO ) SC#4, SC#7 AZIMUTHAL DPD DISTRIBUTION ANALYSIS. Nicholas Souchlas, PBL (3/20/2012) 1

IDS120j GEOMETRY: WITHOUT GAPS/WITH MAX SIZE GAPS *********************************************************** # DP SIMULATIONS. # SC#4, SC#7 AZIMUTHAL DPD DISTRIBUTION STUDIES. *********************************************************** >SIMULATIONS CODE: mars1510 / MCNP >NEUTRON ENERGY CUTOFF: MeV >SHIELDING: 60% W + 40% He ( WITH STST VESSELS) >PROTON BEAM POWER: 4 MW >PROTON ENERGY: E = 8 GeV >PROTON BEAM PROFILE: GAUSSIAN, σ x = σ y = 0.12 cm 2

YZ CROSS SECTION PLOTS. 3 IDS120j WITHOUT ( LEFT ) AND WITH GAPS ( TWO SHIELDING CONFIGURATIONS RIGHT ) RIGHT PLOT SHIELDING CONFIGURATION: SH#2 REGION ( BLUE ): #LENGTH ~ 5 m, #AVERAGE RADIAL THIKNESS ~ 0.6 m #WEIGHT ~ 32 TONNS SH#3 REGION ( PINK ) : #LENGTH ~ 4 m, #AVERAGE RADIAL THIKNESS ~ 0.4 m #WEIGHT ~ 14 TONNS SH#4 REGION ( YELLOW ): #LENGTH ~ 5.4 m, #AVERAGE RADIAL THIKNESS ~ 0.55 m #WEIGHT ~ 52 TONNS (FOR 18.2 g/cc W DENSITY)

IDS120h: introducing shielding vessels (STST OR W) Different cases of shielding material. >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING: 60%WC+40%H 2 O/60%WC+40%H 2 O/ >4 MW proton beam, Np=100,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h: introducing shielding vessels (STST OR W) Different cases of shielding material. >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING: 60%WC+40%H 2 O/60%WC+40%H 2 O/ >4 MW proton beam, Np=100,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h: introducing shielding vessels (STST OR W) Different cases of shielding material. >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING: 60%WC+40%H 2 O/60%WC+40%H 2 O/ >4 MW proton beam, Np=100,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=100,000 AND N=500,000 events simulation for 80%W+20%He SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=500,000 events simulation for 60%W+40%He AND 60%W+40%H 2 SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=500,000 events simulation for 60%W+40%He AND 60%W+40%H 2 SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=500,000 events simulation for 60%W+40%He AND 60%W+40%H 2 SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=500,000 events simulation for 60%W+40%He AND 60%W+40%H 2 SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=500,000 events simulation for 60%W+40%He AND 60%W+40%H 2 SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=500,000 events simulation for 60%W+40%He AND 60%W+40%H 2 SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. IDS120h with shielding vessels. # Different cases of shielding material. # N=500,000 events simulation for 60%W+40%He AND 60%W+40%H 2 60%W+40%H 2 SHIELDING SHIELDING # Energy counting for N=500,000 events simulation for 80%W+20%He SHIELDING >mars1510/MCNP > MeV NEUTRON ENERGY CUTOFF >SHIELDING:60%W+40%He, 80%W+20%He, 88%W+12%He ( WITH W VESSELS) >4 MW proton beam, Np=100,000/500,000 >PROTONS ENERGY E=8 GeV. >GAUSSIAN PROFILE: σ x =σ y =0.12 cm. 4 IDS120j: DP DISTRIBUTION WITHOUT GAPS ( LEFT ) AND WITH MAXIMUM GAPS SIZE ( RIGHT ) FIRST LOOK: GAPS AFFECT MOSTLY SC#3, SC#4 AND SC#7, SC#4 WITH MOST SERIOUS PROBLEM. GAP BETWEEN CRYO #1 AND #2 HAS THE MOST SIGNIFICANT EFFECT NOT ONLY IN THE NEIGHBORING SCs BUT ALSO IN THE SCs FURTHER DOWNSTREAM.

IDS120j: GAP BETWEEN CRYO 1-2 AND SC#4 SEGMENTATION DETAILS. 90 < r < cm dr = cm N r = 4 bins < z < cm dz = cm N z = 1 bin 0.0 < φ < deg. dφ = 30 deg. N φ = 12 bins N tot = 48 ''pieces'' 90 < r < cm dr=14.40 cm N r = 4 bins < z < cm dz=21.31 cm N r = 1 bin 4 φ = 90 o φ = 0 o x y z y

DPD ≲ mW/g ( sum kW ) DPD ≲ mW/g ( sum kW ) PEAKS APPEAR TO BE IN THE UPPER HALF OF SC#4, TOWARD – x AXIS 5 SC#4 DPD AZIMUTHAL DISTRIBUTION WITHOUT GAPS: 15.8 g/cc ( LEFT ) AND 18.2 g/cc ( RIGHT ) W DENSITY ( AVERAGE FROM 4 5E05 EVENT SIMULATIONS ).

SH#4 DPD AZIMUTHAL DISTRIBUTION WITH GAPS: 15.8 g/cc W DENSITY ( LEFT ). AZIMUTHALLY AVERAGE DPD PLOT BY USING ROOT SOFTWARE. SC#4: DPD ≲ 2.4 mW/g (sum = 3.64 kW vs kW without segm.) DPD ≲ 0.7 mW/g PEAKS APPEAR TO BE ALSONG THE + y AND – x DIRECTION. FROM RIGHT PLOT: DOES THAT MEAN THE STUDY II GEOMETRY SC#1 PEAK IS IN REALITY > 19 mW/g ?!! SC#4 DPD AZIMUTHAL DISTRIBUTION WITH GAPS: 18.2 g/cc W DENSITY ( LEFT ) FROM 5E05 EVENTS. AZIMUTHALLY AVERAGE DPD PLOT BY USING ROOT SOFTWARE ( RIGHT ). 6 rz

IDS120j: GAP BETWEEN CRYO 1-2 AND SC#4 SEGMENTATION DETAILS. 90 < r < cm dr = cm N r = 4 bins < z < cm dz = cm N z = 1 bin 0.0 < φ < deg. dφ = 30 deg. N φ = 12 bins N tot = 48 ''pieces'' φ = 90 o φ = 0 o x y 70 < r < cm dr = cm N r = 2 bins < z < cm dz = cm N z = 1 bin 0.0 < φ < deg. dφ = 30 deg. N φ = 12 bins N tot = 24 ''pieces'' φ = 0 o φ = 90 o 7 CRYO #2 AND #3 GAP AND SC#7 AZIMUTHAL SEGMENTATION DETAILS. y z

SC#7: DPD AZIMUTHAL DISTRIBUTION WITH GAPS FROM 4 x 5E05 EVENTS ( 18.2 g/cc W DENSITY). 8 NO GAPS GAPS SC#1 : kW > kW SC#2 : kW > kW SC#3 : kW > kW SC#4 : kW > kW SC#5 : kW > kW SC#6 : kW > kW SC#7 : kW > kW SC#8 : kW > kW SC#9 : kW > kW SC#11-12 : kW > kW SC#1-12 : kW > kW GAP BETWEEN CRYO #1 AND #2 IS THE MAJOR PROBLEM IN THE GAPS CONFIGURATION. AT THE SAME TIME THAT GAP SHOULD BE BIGGER THAN THE OTHERS TO SATISFY Hg POOL VESSEL + BEAM PIPE + Be WINDOW + SHIELDING COOLING COMPONENTS AS WELL AS OTHER ENGINEERING COMPONENTS. AT LEAST ~ 20 cm WILL BE DEDICATED TO THE STST FLANGES OF THE SHIELDING VESSELS AND MORE THAN cm FOR THESE COMPONENTS, THEREFORE SHIELIONG GAP ≳ 50 – 60 cm. A VIABLE SOLUTION CAN INCLUDE A. INTRODUCTION OF SHIELDING IN THE UPPER HALF OF THE Hg POOL VESSEL, B. NOT EXTENDING THE POOL ALL THE WAY TO THE END OF THE CRYOSTAT LENGTH, C. ASSYMETRIC EXTENSION OF THE SHEILDING MATERIAL FROM CRYO #1 TOWARDS CRYO #2, D. SC#4 IR INCREASE NO GAPS GAPS SC#1 : kW > kW SC#2 : kW > kW SC#4: DPD ≲ 0.15 mW/g (sum = kW vs kW without segm.) PEAK APPEAR TO BE ALONG THE + y AND - x DIRECTION AS IN SC#4. PROBLEM IN SC#4 LOOKS LIKE IS MANEGEABLE. SC#3 SEGMENTATION ANALYSIS IN PROGRESS. RADIAL DP FLOW : kW -----> kW GAP BETWEEN CRYO #1 AND #2 IS THE MAJOR PROBLEM IN THE GAPS CONFIGURATION. AT THE SAME TIME THAT FIRST GAP SHOULD BE BIGGER THAN THE OTHERS TO SATISFY THE NEEDS FOR Hg POOL VESSEL + BEAM PIPE + Be WINDOW + SHIELDING MATERIAL COOLING, AS WEEL AS OTHER ENGINEERING COMPONENTS THERE. AT LEAST ~ 20 cm WILL BE DEDICATED TO THE UPSTREAM AND DOWNSTREAM STST FLANGES OF THE NEIGHBORING SHIELDING VESSELS AND MORE THAN ~ cm FOR THE DIFFERENT COMPONENTS, THEREFORE SHIELDING GAP ≳ cm. A VIABLE SOLUTION ( BUT NOT NECESSARILY ENGINEERINGLY FAVORABLE) CAN INCLUDE: A. INTRODUCTION OF SHIELDING IN THE UPPER HALF OF THE Hg POOL VESSEL, B. NOT EXTENDING THE POOL ALL THE WAY TO THE END OF THE #1 CRYOSTAT LENGTH, C. ASSYMETRIC EXTENSION OF THE SHIELDING FROM CRYO #1 TOWARDS CRYO #2, D. SC IR INCREASE MAYBE EVEN TO 120 cm.