SAMS Project David Buckley, Hitesh Gajjar & John Menzies May 2014.

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
Image Quality Upgrade Kickoff Meeting Daniel O’ConnorAugust 6, 2002.
SSWG Meeting 2006 May 8 SSWG May ’06: SAMS. SSWG Meeting 2006 May 8 Agenda SAMS Hardware overview SAMS Software overview System status – performance to.
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
High-Order Deformable Mirror
MERIT Experiment Status MERcury Intense Target K. McDonald for the MERIT Collaboration August 30, 2007 TT2/TT2A: MERIT Build.272: Offices & Control Room.
Thermo-mechanical infrastructure: Environmental Monitoring with FOS AIDA WP9.3 meeting November 21 th DESY, Hamburg. David Moya Martin Instituto de Física.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 03/15/2012Preliminary Design Review.
SALT Technology Development Lisa Crause India-South Africa Astronomy Workshop – SAAO 6 August 2012.
Validation Metrics. Metrics are Needed to Answer the Following Questions How much time is required to find bugs, fix them, and verify that they are fixed?
SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
SSWG Meeting #15: May 2006, Cape Town SSWG #15: 7 & 8 May SSWG Agenda: Sunday 7 th May 1.Welcome. Minutes of Previous meeting. Matter arising (David)09:00.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
MODIS Sea-Surface Temperatures for GHRSST-PP Robert H. Evans & Peter J. Minnett Otis Brown, Erica Key, Goshka Szczodrak, Kay Kilpatrick, Warner Baringer,
LBT Progress Report, Feb Marco Xompero 1/14 P45 Test Results and beyond… Marco Xompero Daniela Zanotti Armando Riccardi.
MARS Design Review PP-1 Requirements Definition Performance: –Tip/Tilt error < 0.06″ rms mirror coordinates 0.12″ rms image coodinates 0.28″ fwhm image.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
The Hobby-Eberly Telescope Mirror Alignment Recovery System Marsha Wolf Graduate Student UT Astronomy Department.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
JVLA capabilities to be offered for semester 2013A Claire Chandler.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
The Active Optics System S. Thomas and the AO team.
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
© Imperial College LondonPage 1 Calibration Commissioning Report GIST 19 RAL, 27th August 2003 GERB Instrument Team & Operations Team.
Cosmic Frontier Experiment Status August 25, 2014 ExperimentLocationStatusStart of operations Nominal end of operations Physics SuperCDMSSoudanOperatingMar.
I.Prochazka et al,ACES IWG meeting Neuchatel June 2014 European Laser Timing work progress Ivan Procházka, Josef Blažej (1), Jan Kodet (1,2) K.Ulrich Schreiber.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LCG CERN David Foster LCG WP4 Meeting 20 th June 2002 LCG Project Status WP4 Meeting Presentation David Foster IT/LCG 20 June 2002.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Telescope Phasing Slides Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
ELENA installation progress F. Butin / ELENA collaboration.
Smart co-phasing system for segmented mirror telescopes SPIE: Juan F Simar* a, Yvan Stockman a, Jean Surdej b a Centre Spatial de Liège, LIEGE.
Si70xx Temperature Sensors Customer Friendly
Cluster Active Archive – Wideband data BM2 mode
Integration & Commissioning
ATF2 Magnet Power Supplies
Primary Mirror Control
First Assembled Rod in US
Virgo Update – LSC meeting
Strategic Planning Timeline Overview
Presentation transcript:

SAMS Project David Buckley, Hitesh Gajjar & John Menzies May 2014

Do we need it? Improvement of the IQ delivered by the telescope through active control of the primary mirror Approx 4 hours spent stacking during 5 day period Primary mirror will maintain IQ over 5 day alignment cycle (0.1” TT RMS) Challenges: Piston resolution: 1nm Control over lower order modes (focus) Environmental conditions ( 15ºC temperature span/5days, severe temperature gradients, HIGH humidity) No other edge sensor, in operation or development meets these requirements System Overview : Requirements

30/11/07 System Overview : Hardware

30/11/07 Performance Specification Maximum cumulative error: 30nm over 5 days Sensor Noise < 10nm rms Temperature span 15°C RH up 97%

Project Phases and Status Project Phases Phase 1: Central 7 segment sub-array Phase 2: First 3 rings Phase 3: Completion of entire array Project Status All hardware for Phase 1; 24 sensor pairs and supporting electronics delivered (early May) Validation of 3 channel electronics, new cabling, and embedded software underway. Environmental characterisation (temperature and RH characterisation) in progress Additional software development of control software Bug fixes to embedded rack software

Phase 1 Priorities TaskExpected Completion Button bondingEarly June’14 Sensor Characterisation/hardware validation Mid June’14 On-telescope commissioning July’14 Atp Phase 1July-August’14 Initiate Phase IIAugust’14 Manufacture, install and commission 156 sensors August’14 – Jan’15 ATP Phase IIFebruary ’15 Initiate Phase IIIFebruary ’15 Manufacture, install and commission 300 sensors February ’15-August ’15 ATP Phase IIISeptember ’15

SAMS Project Report End

30/11/07

System Overview : GUI