6/5/011 NPAC SMS BUSINESS DAYS/HOURS & TIMERS. 6/5/012 CONCEPTS Porting and Concurrence Business days Business hours Timers Service Provider profile.

Slides:



Advertisements
Similar presentations
1 Number Portability Administration Center Change Orders NANC 399 & NANC 400 NANC Meeting March 15, 2005 Tom McGarry NeuStar, Inc.
Advertisements

How are we travelling to work? – lets find out Take part in the Annual Travel Survey Keep a note of how you travel to work between Saturday 29 September.
Learn all about the year.
REPORT CARDS IMPROVEMENTS GRADES 1–8
The 8051 Microcontroller and Embedded Systems
On-Call Rotation and “Pageable CI” Documentation Tim Currie October 17, 2011 Version 1.0.
Community Development Department Pain Management Clinics Proposed Ordinance City Council Workshop October 11, 2011.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
Transaction Processing IS698 Min Song. 2 What is a Transaction?  When an event in the real world changes the state of the enterprise, a transaction is.
Section 2.6 Question 1. Section 2.6 Answer 1 Section 2.6 Question 2.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Littlefield Game Logging on after Friday
Microsoft SharePoint Administration Monitoring and Performance Version 1.0 – Author : Marc PYBOURDIN / Joffrey KERN Dernière Mise à Jour : 09/02/2012.
Friday, April 15 th : “A” Day Monday, April 18 th : “B” Day Agenda  Homework Problems/Questions  Finish Section 7.3 (we’re almost done…)  In-Class:
Agile Design and SCRUM Brent M. Dingle, Ph.D. “For the last few centuries, … science has been attempting to break matter down into ever smaller bits, in.
Report Builder Running STAT!Ref Usage Statistics.
Troubleshooting. Why Troubleshoot? What Can Go Wrong? –Misconfigured zone –Misconfigured server –Misconfigured host –Misconfigured network.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
Overview and Guidelines for... SOA/NPAC, Internal and Inter- carrier testing.
Version 4.0 NOTE: For a more detailed description of each process step within these flows, please refer to the accompanying Inter-Service Provider LNP.
Number Portability and Telecommunications Liberalization CANTO 2005.
The Chameleon Development Environment The Chameleon™ Development Environment Application delivery using Microsoft Excel®
Evaluation Overview Set 4: Evaluating Responses. Tenderbox Keys The evaluation process begins with a system generated immediately at tender close.
Operating Systems ECE344 Ashvin Goel ECE University of Toronto Thread Scheduling.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
1 6/19/98Copyright 1998 ITN with NPAC and 3rd Party Network Element Barry Bishop Director of Numbering Services Lockheed Martin ITN Number Pooling.
Select ‘myVCU’ Select ‘eServices’ Select ‘Student’
CHAPTER Creating and Managing Users and Groups. Chapter Objectives Explain the use of Local Users and Groups Tool in the Systems Tools Option to create.
Take part in the 2015 Annual Travel Survey Keep a note of how you travel to work between Saturday 10 th October and Friday 16 th October 2015 How did you.
Click the button to begin. 12:25 What time does this clock show? 5:00 4:00.
Version 3.0 North American Numbering Council (NANC) Inter-Service Provider LNP Operations Flows NOTE: For a more detailed description of each process step.
Mismatch Is end-user porting all telephone numbers? New Service Provider notifies Old Service Provider of change using Local Service Request (LSR) Old.
Mismatch NNSP sends porting LSR to ONSP to port number. End-user Contact End-user agrees to change to New Service Provider (NLSP) NLSP obtains end-user.
CSE 351 GDB Introduction. Lab 1 Status? How is Lab 1 going? I’ll be available at the end of class to answer questions There are office hours later today.
1 ARM University Program Copyright © ARM Ltd 2013 Using Direct Memory Access to Improve Performance.
North American Numbering Council (NANC) Inter-Service Provider LNP Operations Flows Version /16/2009.
1 Microsoft Project 2003 Introduction. 2 Overview Microsoft Project is a specialized database that stores and presents thousands of pieces of data. Examples.
ECE 353 Introduction to Microprocessor Systems Michael G. Morrow, P.E. Week 1.
Introducing Alpha Dog “barks” Optimal Frequency to move products and to promote services.
OSes: 2. Structs 1 Operating Systems v Objective –to give a (selective) overview of computer system architectures Certificate Program in Software Development.
MYWRITINGLABPLUS AND BUSINESS. WHAT IS MYWRITINGLABPLUS? MyWritingLabPlus is an online program designed to help you with writing and grammar necessary.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Goals. What is a Goal? It is something that you set when you want something. Example: I want a puppy or I want to learn to play football,
1 EPS Metering Holiday Work Schedules RMS & COPS Don Tucker September 9 & 10, 2014.
Compiled by John McFarlane 2 nd September nd September Slides Duration 9:35 minutes Version V.01.
Young Enterprise What is it? Young Enterprise is a course we run with an outside agency to encourage the development of a range of key, transferable and.
Troubleshooting. Why Troubleshoot? What Can Go Wrong? –Misconfigured zone –Misconfigured server –Misconfigured host –Misconfigured network.
IQCare V3.5.4 Required Manual Updates September 24, 2013.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Presentation by: Paul Kieffer
Duration: How long will a lecture take?
Process concept.
A New Model for Interconnection ECC Report 75
Chapter 1 marketing is all around us Section 1.1
Three Minute Timer Two Minute Timer One Minute Timer

Top Fire Protection Services Ottawa available on Dubinskyconstruction
تلويزيون فارسی بی بی سی چرايي، چيستی و چگونگی.
SAQ By Jeff Anderson.
NEWS BROADCAST PROJECT HISTORICAL EVENTS
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
Profiling ( 070ZZ446) INCLUDES:
HISTORICAL EVENTS.
Goals For our next activity we will be writing some goals.
مديريت موثر جلسات Running a Meeting that Works
Timer Source: under
Industry Numbering Committee (INC) Report to the NANC

Presentation transcript:

6/5/011 NPAC SMS BUSINESS DAYS/HOURS & TIMERS

6/5/012 CONCEPTS Porting and Concurrence Business days Business hours Timers Service Provider profile

6/5/013 PORTING AND CONCURRENCE: Overview Porting: four steps process 1.Create 2.Concurrence 3.Activate 4.Broadcast SOA New SP NPAC LSMS (1)(2)(3)(4) (time) SOA Old SP (1) or (2) (3) (1) or (2) (4)

6/5/014 TIMERS (1)(2)(3)(4) (time) Number of business hours after the first create by which both service providers can authorize transfer of service. FRS. R Create 2.Concurrence 3.Activate 4.Broadcast Two timers: T1 (always start) & T2 (conditional start depending on concurrence) T1 start T1 end = T2 start T2 end

6/5/015 TIMERS (cont.) Timer types Short: T1: 1 hour (tunable) T2: 1 hour (tunable) Long: T1: 9 hours (tunable) T2: 9 hours (tunable) Port IN and Port OUT Remarks Independent of the Business Days/hours type Timers stop after concurrence have been reached Old SP New SP long short long timer

6/5/016 BUSINESS DAYS & BUSINESS HOURS TIMEFRAMES WHEN THE TIMERS RUN IN THE NPAC Types Long: From Monday to Saturday (fix values) 12 hours (tunable start time and duration) Short: From Monday to Friday (fix values) 12 hours (tunable start time and duration) Remarks Independent of the timer types Porting can be done outside these Timeframes CO to make Business Days tunable Old SP New SP long short long short

6/5/017 SERVICE PROVIDER PROFILE The Service Provider Profile provides information to the NPAC to manage the Service Provider data. Business days/hours flag Port IN Timer flag Port OUT Timer flag - No distinction between a Wireless and a Wireline provider -

6/5/018 REFERENCE NANC Functional Requirement Specifications (FRS) Version – September 1, 2001 (or later) Sections: Business Days/Hours Timer Types NPAC Customer Data 3.7 Business Hour and Days Requirements Subscription Version Creation requirements (reqs. R5.22 to R5.23.4)