Beamline 8.3.2 Radiation Shielding Beamline Design Review 17 April, 2006.

Slides:



Advertisements
Similar presentations
The following photo essay shows a 2011 Hyundai Equus Sedan being transformed from a running passenger car into a specialized platform used for photographing.
Advertisements

Public Sector Project Management Public Sector Forum Fall 2005 Panel Discussion: Opening & Closing Projects in the Public Sector Public Works and Government.
Radiological Emergency Procedures FOR ALL ISOTOPES 1.Prevent others from entering the affected area or coming into contact with the potentially radioactive.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Tank Inspection and Maintenance Leo Yuskus, Senior VP Haley and Ward, Inc. WHY IS THIS IMPORTANT.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
©LRI ULC S VERIFICATION OF FIRE ALARM SYSTEMS PART # 6 SYSTEM MODIFICATIONS Presentation for CFAA Annual Seminar May 5, 2010.
FF-650 Repair Procedure—CMP 30 Frame Reason for Repair—CMP 30 models with Serial Numbers in the range of 2453 through 3354 in Lot 9587, 0008 through 0120.
Reduced Vertical Separation Minimum (RVSM)
Industrial Radiography
Project Completion Report. Project Summary Client: MTU Detroit Diesel Australia Contract No.: PROJECT DELIVERABLESTARGETACTUAL SafetyNil LTINIL.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
DAR Library Lay Light Restoration A Special Message From President General Merry Ann T. Wright.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Project Scope Management
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
August 4, 2009Radiation Safety Committee Operational Radiation Safety Program for the NEH A.A. Prinz, J.C. Liu and J. Vollaire.
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Authorization and Inspection of Cyclotron Facilities Inspections.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
TMT M1CS Actuator Pre-ship Meeting Avasarala Technologies Limited Bangalore, India September 13 th, 2013.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
Forest harvesting practices are a suite of BMPs that minimize the environmental impacts of road building, log removal, site preparation and forest management.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Mechanical Integrity Quality Assurance. Lesson Objectives  Describe How to Ensure Controls in Place for QA  Describe Standard Record for Inspection.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
General Weight & Balance Information for Grob 103 Twin II and 103 Twin II Acro gliders along with specific data for N54554, N4446Y, and N228BG in the form.
Managed by the International Fuel Tax Association, Inc. TOWN HALL MEETING 2011 Annual IFTA Business Meeting August 17, 2011 Virginia Beach, VA.
1.  YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. ( Dim. inspection 680 mm (0,-0.5)  Fasteners =
ACFA-7; Taipei, Nov 2004 H.Weerts status Si licon D etector Status H.Weerts Fermilab/Michigan State Univ. (Progress on Si-tracker layout)
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Q: How do I view and upload a document? First, Login to NTREIS Transactions First, Login to NTREIS Transactions.
Internal environmental audit procedure Purpose: To ensure that the environmental management system is used and is effective Scope: The entire environmental.
Internal Assessments at Argonne Accelerator Facilities S.W. Butala Presented at the DOE Accelerator Safety Workshop - BNL August 19, 2009.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Beamline Readiness Review - Hutch Beamline Microdiffraction March 28, 2006.
Inspection photo requirements Following this procedure will ensure that you get paid for the work completed. All rights to this document are reserved by.
Ministry of Land, Infrastructure, Transport and Tourism Method for Ensuring the Implementation of Supervision NAKAE Hajime Architecture & Building Engineering.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Lock change and lock box photo requirements All rights to this document are reserved by North Georgia Services. Following this procedure will ensure that.
Installation of the T600 at Fermilab CSN2, September 22,
Edmonds Development Services Department. City of Edmonds  City of ~40,000  A record 1,559 building permits in 2015  Existing website, maintained by.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
Proactive Roof Asset Managemet Vince Patterson Operations Manager – Roof Maintenance & Leak Repair Department Chamberlin Roofing & Waterproofing.
STEP 1: ASSEMBLE ANGLE PLATES
Industrial Radiography
ARISSat-1 Solar Panel Covers
STEP 1: ASSEMBLE ANGLE PLATES
Fire Door Inspections Qualified Training
Catastrophe Adjuster Orientation
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
Ken Periman Problem solving, Brake Booster Fluid leak
Practical Metalworking
STEEL PLATES.
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Q: How do I view and upload a document?
California State University Fresno
Presentation transcript:

Beamline Radiation Shielding Beamline Design Review 17 April, 2006

Background Radiation leak discovered during annual white-light survey Surgical inspection revealed that: – Lead had shifted slightly – Corner section was not built to specification Actions taken: – All lead lined hutches are to be inspected and reviewed – All lead lined hutches moved to Pre-Commissioned status

Shielding Inspection Criteria Verify that lead shielding is either: – Contiguous – Properly overlapped Ensure that shielding is secure and will not move Document and Archive

Shielding Defining Process Determine types of panels and shielding – Exploratory surgery – Compare to mfg drawings Develop repair plan: – Procedure for panel repair – Process for documentation

Shielding panel types Three types of shielding panels on the hutch: –Structural (S) –Non-Structural (NS) –Corners (C) Additional regions –Doors –Support Structure over door X-rays PLAN VIEW S NS C C C C S S

Shielding Repair Approach Documentation – Generate tracking methods for each panel – Record panel information and repairs – Archive documents, drawings and photos. Three basic shielding repair “actions” to hutch panels: – Skinning (structural & corners) – Securing (non-structural & doors) – Surveying (roof, H – panels, labyrinths)

8.3.2 Shielding Documentation Documentation note – Includes explanation – Defines numbering system for panels and references drawing – Provides repair forms for each panel – Will serve to record repairs with forms and photos.

“Skinning” Example documentation Corner Panels – Fill out inspection sheet – Photograph lead – Re-skin with 5mm lead – Cover with steel

“Skinning” Example documentation 2 Door Support Structure – Fill out inspection sheet – Re-skin with 5mm lead – Photograph before install – Cover with steel

“Securing” repair process Non Structural Panels – Inspect Lead – Photograph Overall Picture Quadrants – Install Support Bar – Install Cover Plate

“Securing” Inspection A B C D

“Securing” Support bar

“Securing” Assembly view

“Securing” Attachment view

“Securing” Example Documentation 2 Doors – Remove doors – Cut into and Inspect lead – Photograph – Install Support Bars – Install Cover Plate – Re-install doors

“Surveying” Repair process Survey panels – Roof panels – H - panels – Labyrinths Survey Process – Inspect panels – Perform commissioning survey per procedure – Complete forms

“Surveying” Commissioning checklist

“Surveying” Example documentation Roof panels – Inspect panels – Perform commissioning survey per procedure – Complete forms

Open issues….. Complete documentation note with deails, process for repair and drawings for each panel on hutch Review of Commissioning radiation survey procedure – All concerns must be addressed regarding actual process. Structural Calculations – INC is reviewing hutch design with added lead – If additional structure is needed a design could be added to the corners

Plan of Attack Immediate Actions: –Non-Structural Panels Inspect/Repair/Secure –Doors Remove Inspect/Repair/Secure –Labyrinths Remove/Inspect –Roof Cover Plates Fabricate Lead Inspect/Install –Inspect C-Channels on Joining Plates Near Term Actions –Structural Calculations –Re-Skin Structural Panels Door Support Structure Corners During Re-Commissioning –Verify H-Channels on Joining Plates –Survey All Panels

Questions?